Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

RockStrong™ and Cerebro® coring tools help operator evaluate rock properties

RockStrong™ coring tool and Cerebro® coring dynamics data help evaluate rock properties in mature field and save USD 220K and 48 hours of rig time in Colombia.

Brochure

iStar® intelligent drilling and logging platform - Brochure

Fully digital and web-enabled, the iStar platform allows monitoring and control of drilling and logging operations from anywhere.

Case Study

MLT junction enables increased reservoir stimulation

The FlexRite system provided platform to achieve proposed stimulation requirements. The design resulted in superior collapse resistance to formation movement.

Data Sheet

SPECTRUM® e-IP

Electric inflatable packer for multipurpose bottomhole assembly (BHA) configurations and chemical treatment needs

Case Study

First global deployment of an offline plug container

Halliburton's successful innovation of a unique offline plug container leads to a standardized engineering solution for offline cementing operations.

Data Sheet

SPECTRUM® 360, multi-side view flow-through camera

Multi-side view flow-through camera for advanced downhole visualization and diagnostics during well intervention

Data Sheet

SPECTRUM® e-ORIENTER

Precise downhole orientation control and real-time telemetry, ideal for applications like oriented perforating.

Case Study

First offline plug container global deployment

World's First Implementation of an Offline Cementing Head. Success in innovation produces a standardized engineering solution for offline cementing operations.

Data Sheet

eRED® electronic remote equalizing device - Data sheet

An electro-mechanical ball valve that can be remotely opened and closed multiple times, eliminating interventions during well operations

Case Study

Wellbore sealant supports performance drilling in high temp

BaraFLC Nano-1 reduced dilution rates, lowered fluid viscosity and tightened filtration rates during a 22-day interval with maximum downhole temperature >300ºF.

Results per page: 102550