Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Article

Expand Your Clean Energy Mineral Portfolio

Discover sustainable mineral projects with Neftex® Prospect, driving the clean energy transition through data-driven insights and collaboration.

View

Data Sheet

RigConnect® Collaboration Platform - Data Sheet

The RigConnect® collaboration platform brings focus to well testing operations through assisted and augmented reality (AR)

Data Sheet

Control line cut sub - Data sheet

The Halliburton CLCS incorporates reliable and field-proven methods for effective removal of the tubing string and control lines in contingency situations

Data Sheet

Juggernaut® Cutters - Data sheet

Halliburton Juggernaut® cutters are an advanced cutter family specifically created to address today’s most challenging drilling environments

Case Study

Halliburton installs 400th FlexRite® system in North Sea

Discover how Halliburton's FlexRite® MIC Junctions enable more advanced multilateral completions for an operator, providing selective control and monitoring.

Case Study

RezConnect™ testing system – full acoustic control of DST

RezConnect™ Well Testing System successfully communicated at 100% throughout the well test, demonstrating the reliability of downhole wireless technology.

Article

Overcoming Well Positioning Challenges using a Digital Ecosystem

This spotlight introduces an analytics-based approach to the well positioning challenge. This approach uses natural language processing (NLP) and text mining techniques for creating an integrated space for data-driven decision making.

View

Article

Accelerate Carbon Capture and Storage Site Screening

To address the pressing issue of climate change, countries and companies are committing to “net zero” goals. Yet, at the same time, fossil fuels will continue to be an essential part of the energy mix for years to come, as the transition to low carbon energy sources progresses.

View

Article

Fulfil the Mineral Demands for the Energy Transition - Article

Learn how Halliburton is unlocking mineral potential for clean energy with Neftex® Prospect - the future of sustainable exploration.

View

Case Study

Operator saves 42 hours of rig time with eMotion®-LV barrier valve

Emotion®-LV barrier valve eliminates intervention in highly deviated well to improve completion efficiency and reduce operational and environmental risk

Results per page: 102550