Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Article

POWER Magazine - Increase Geothermal Production with Deeper Casing Depths

Ideal conditions for geothermal power can create some of the biggest cementing challenges for wells. Where traditional cementing methods fail, tailored cement formulations and processes can help run casing deeper and lower geothermal well costs.

Case Study

New emulsion breaker reduces treatment and transportation costs

Specialized technology saves operator approximately $28 million annually

Brochure

Hydrogen transportation and underground storage brochure

Halliburton draws upon more than 100 years of experience in well construction, planning, design, and monitoring to engineer custom hydrogen solutions

Case Study

Intelevate™ platform enables remote ESP control in isolated area

Intelligent satellite Edge device enables connectivity on unconventional Vaca Muerta Shale well.

Case Study

Wellbore cleanup tools and TCP guns help reduce rig time

A major operator in southeast Asia engaged Halliburton to provide wellbore cleanup in conjunction with tubing conveyed perforation (TCP) in a single trip.

Case Study

Halliburton deploys completion tech for hydrogen storage

Halliburton successfully installed and retrieved the SP TRSV, X-Trieve HC packer, and material test sub for the EnergyStock pure hydrogen storage demonstration.

Article

How to embrace the paradigm shift in reservoir modeling and analysis

ResX software, built from ensemble-based methods, helps subsurface teams embrace uncertainties in the reservoir modeling and history matching process.

Article

4D Seismic Assisted History Matching Using Ensemble-Based Methods

4D seismic data sets can provide valuable insights when characterizing a reservoir, but assimilating these datasets into reservoir models is challenging

Case Study

Optimized chemical treatment suite remediates poor desalter performance, saves operator $10 million annually

Operator savings of $10 million annually attributed to optimized desalter performance, increased reliability, and decreased chemical costs

Case Study

A comprehensive cooling tower inspection yields critical repairs, enhances performance

Operator captures $8 million in production value with the improvement of cooling tower efficiency

Results per page: 102550