Record breaking optimization results in Oman - White paper
Halliburton Project Management achieved a new field record in Oman through innovative drilling optimization methods, enhancing efficiency and productivity.
Halliburto integrated well construction team delivers eight horizontal wells 36 days ahead of the operators original drilling planfor an operator in Russia.
Data Sheet
X-Tend® acid stimulation service - Data sheet
X-Tend system is a non-viscous, polymer-free, and chemically retarded hydrochloric acid (HCl) fluid system for enhanced reservoir contact in carbonate formations.
Brochure
Triton® downhole gauges for data acquisition - Brochures
Next generation of downhole gauges with leading-edge technology that provides superior asset surveillance capability, protection, and data acquisition.
Data Sheet
iCruise® intelligent rotary steerable system - Data sheet
iCruise is engineered with some of the highest mechanical specifications on the market, helping operators reduce well time and maximize the rate of penetration.
Case Study
Rapidstage sleeves help operator increase efficiency by 66%
Discover how Halliburton helped an operator in Eagle Ford Shale reduce the cost per barrel of oil equivalent (BOE) and increase completion efficiency.
Case Study
Operator saves valuable time during challenging stimulation
RapidSuite frac sleeve systems, including RapidStage® frac systems as well as RapidStart® initiator sleeves, were installed in each lateral in Kazakhstan.