Search
Opportunity

Mature Fields

Opportunity
Specific challenge

Validating real-time data and power transfer between wired drill pipe and BHA

Norway Norway

Norway

Challenge

  • Validate data and power transmission between iStar® LWD and third-party WDP system
  • Demonstrate interoperability under realistic drilling conditions
  • Confirm system reliability and performance

Solution

  • Conducted full-scale integration and reliability test in Norway
  • Deployed StreamStar™ WDP interface system to connect LWD and WDP platforms

Result

  • Transmitted real-time data at 200 kbps
  • Delivered electrical power through WDP to operate iStar® LWD tools
  • Eliminated need for downhole batteries
  • Improved operational efficiency
  • Enabled faster, data-driven decisions

Overview

Wired drill pipe (WDP) technology helps reduce drilling time, improve well placement, and increase wellbore quality, which are factors that lead to higher production rates. Beyond high-speed data transmission, some WDP systems can deliver electric power along the drill string. This unlocks simpler, more efficient bottomhole assemblies (BHAs).

In Norway, Halliburton conducted a field test to validate real-time data and power transmission with the StreamStar™ wired drill pipe interface system. The test confirmed reliable connectivity between the iStar® drilling and logging platform and a third-party WDP system under realistic drilling conditions.

Challenge

Operators who deploy wired drill pipe (WDP) technologies that transmit high-speed real-time data and electric power must validate system interoperability under realistic drilling conditions. A key challenge is to integrate logging-while-drilling (LWD) tools and rotary steerable systems (RSS) with third-party WDP platforms.

To address this, Halliburton conducted a field test in Norway to verify consistent data and power transmission between the iStar platform and a third-party WDP system using the StreamStar interface.

Solution

Halliburton deployed the StreamStar system to establish a direct interface between the iStar platform and help ensure a third-party WDP system. Designed to manage real-time, high-speed data flow and deliver continuous electrical power, the system facilitated seamless communication through the wired network.

The test simulated live drilling conditions and confirmed the system’s ability to operate without traditional downhole batteries. Halliburton evaluated data and power transfer systems across multiple depths to enable consistent and reliable performance.

200

kbps real-time data rate and power delivery

279 m

continuous downhole data acquisition while drilling

Result

The StreamStar system integrates with the iStar platform and a third-party WDP system. It enabled continuous downhole data acquisition while drilling to a total depth of 279 m. The system transmitted real-time data at rates up to 200 kbps and delivered electrical power to operate iStar® LWD tools – without traditional downhole batteries.

This field test confirmed the reliability of the StreamStar interface under realistic drilling conditions. It also validated the system’s ability to simplify bottomhole assembly architecture, reduce nonproductive time, and support faster, data-driven decisions during well construction.

Related products

LOGIX™ drilling performance

LOGIX™ drilling performance

Offers a digital transformation of drilling solutions to reduce operational risks and ensure consistent well delivery.

Explore
iStar® intelligent drilling and logging platform

iStar® intelligent drilling and logging platform

Fully digital and web-enabled to monitor and control drilling and logging operations from anywhere.

Explore
StreamStar™ wired drillpipe interface system

StreamStar™ wired drillpipe interface system

High-speed data through wired drill pipe for faster drilling and geosteering decisions.

Explore
icon

Ready to take the next step?

Talk with a Halliburton expert

Get in touch