Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

Obex IsoLock® packer collar - Data sheet

The Obex IsoLock® Packer Collar provides V3-rated mechanical barrier support plus integral second-stage cementing capability.

Article

AI & cloud for optimized seismic fault interpretation

By leveraging the latest technologies such as cloud computing and machine learning, Landmark has developed robust tools for assisting and automating the fault interpretation process.

View

Case Study

High-performance lubricant saves USD 480K in ERD well

Discover how Halliburton's BaraLube® W-940 lubricant decreases friction factors by 33%, permitting a single-trip completion to run 2 days ahead of plan.

Case Study

ADNOC drills longest onshore ERD well saving 10 rig days

BaraXcel™ high-performance invert emulsion with diesel-based fluid enhanced ROP by 29% over shorter wells in the same field, saving 10 rig days.

Data Sheet

Dash® large-bore electrohydraulic control module - Data sheet

Halliburton's new generation electrohydraulic (EH) system for large bore subsea well intervention applications

Data Sheet

LithoStar® service - Data sheet

Halliburton's LithoStar® integrated porosity imaging service provides accurate reserves calculations with geological and petrophysical interpretations.

Data Sheet

e-cd™ electric manifold - Data sheet

Eni-patented system used in managed pressure drilling operations to enable continuous circulation and hole cleaning even while making connections

Case Study

Sand management tool eliminates ESP system blockage

SandRight® solids fallback preventer stops dislodged sands from entering the ESP system, ensuring steady production and reservoir pressure in Ecuadorian wells.

Case Study

BaraECD® NAF and SOURSCAV™ scavenger enable safe drilling

BaraECD and SOURSCAV allow for stable, zero H2S drilling of remote well with high temperature, risk of severe losses, and potential 35% H2S

Case Study

Fluid design saves North American operator 10 hours per run

Both hydraulic modeling and triple-combo lubricant package facilitated production casing run, saving the operator USD 25,000/well in Utah, United States.

Results per page: 102550