Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

BaraMesh provides twice the screen life for half the cost

Discover how an operator significantly cuts costs per well by replacing OEM shaker screens with BaraMesh high-performance option in the Permian Basin.

Article

SeaQuest® with ScaleFightR Helps Operator Reduce Emissions and Costs

Case Study

Operator increases production by using integrated services

The Halliburton project management team leads integrated well workover campaign operations in collaboration with Ecuador to complete 6 workover wells.

Case Study

Operator navigates casing limitation to save productive zone

More than 300 FlexRite multilateral system junctions have been installed in deepwater North Sea wells allowing for 35% lateral length to be recovered.

Case Study

Operator saves rig time with remotely operated barrier valve

TengizChevroil LLP (TCO) asked Halliburton to set a liner hanger in lower completion, without risking pumping ball to seat through horizontal section.

Article

North America Land: Life of Well Disposal Solutions - Brochure

Article

Hydro-Helical® Testing and Qualification - Technology Bulletin

Article

Razor™ Shaped Cutter

Article

True Single-Trip™ System - Brochure

Article

Stress Shadowing and Fracture Interference in GOHFER® Software White Paper

Results per page: 102550