Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Article

VersaFlex® XSL Expandable Liner Hanger System

The VersaFlex XSL expandable liner hanger (ELH) system delivers low-to-moderate load-bearing without sacrificing its gas-tight sealing capability

Case Study

Well integrity analysis extends field life in north sea

Discover how Halliburton's expertise in evaluating well integrity proves critical for managing mature field production and extending well life in the North Sea.

Case Study

RapidStage system with AccessFrac service in the Bakken

RapidStage system using Swellpacker isolation system - two discrete fracture treatments in a stage can be achieved by introducing AccessFrac in Williston Basin.

Case Study

Norway: Intercept® RBP retrieved after 9 months in wellbore

Halliburton had been delivering Intercept® retrievable bridge plugs (RBPs) on a regular basis to a major operator in the North Sea, providing gas-tight barrier.

Case Study

Operator saves USD 450,000 in abrasive high-temperature well

Operator saves usd 450k in abrasive, high-temperature well turbopower turbodrill with diamond impregnated bits doubles ROP and accelerates production schedules.

Case Study

Operator uses seismic attribute analysis to boost production

Halliburton’s analysis led to identification and description of several high-quality targets within a reservoir, critical in helping client increase production.

Case Study

Securing well for 6 years using retrievable service tools

Halliburton's 7-inch model 3L™ retrievable bridge plug provides reliable well suspension barrier preventing uncontained formation fluids release in Middle East.

Case Study

Operator mitigates high torque and drag with lubricant

The Halliburton BARALUBE® W-933 lubricant worked to make a cost effective, environmentally safe drilling area over 28,000ft in extended reach exploration well.

Case Study

Eco-friendly offshore wastewater disposal saves USD 3.3M

BaraH₂O® slop unit provides efficient, cost-effective alternative to onshore treatment facilities, effectively processing both drilling waste and slop.

Case Study

First application of BaraXtreme fluid in HTHP gas well

Customized drilling fluid system helps successfully deliver well with 7” liner installed to target depth resulting in project cost savings in Malaysia.

Results per page: 102550