All 15 plugs dissolved, which elminated need for CT millout
Download PDFUnconventional
Remove the costs, time and risks associated with milling out composite plugs
Vaca Muerta, formation
Eliminate cost, time, and risk associated with composite plug mill out
Deploy Illusion® frac plugs for high-performance zonal isolation during stimulation with traditional plug-and-perf techniques
Successfull well bore flowback and production initiation without issue, which eliminated the need for wellbore cleanout intervention
An operator in the Vaca Muerta formation in the Neuquen Basin searced for a solution to reduce or eliminate risks and costs associated with post-fracture millout operations. The wellbore consisted of 5 1/2-in. mono-bore casing and 10,800 ft (3 292 m) of total vertical depth with a 5,000-ft (1 524 m) horizontal section.
Halliburton recommended its dissolvable Illusion® frac plugs for the plug-and-perforate operation, not only to effectively isolate during the fracture but also to remove the need for coiled tubing intervention afterward. Upon successful completion of the 15 stages, which required no special wireline installation equipment or pump-down procedures, the plugs dissolved and the need for intervention was eliminated. The well was flowed back and placed onto production without a CT millout, which exceeded operator expectations.
In an ongoing effort to reduce the risks and costs incurred when completing a well using the plugand-perforate method, the operator was primarily looking for ways to remove the need for milling out composite plugs. As an added challenge, the customer’s objective was to maintain the same parameters during the pump down and setting operations of the plug, without having to modify the values used with traditional composite frac plugs.
Halliburton highlighted the benefits that Illusion frac plugs offer over the traditional composite frac plugs being provided by another service company.
Illusion frac plugs are dissolvable and help eliminate the need for intervention before a well is placed onto production. In addition, this high-performance frac plug provides zonal isolation for pump-down applications during wellbore stimulation and combines the industry-leading Halliburton frac plug designs with the most advanced dissolvable metal and rubber materials.
It is run-in-hole just as a composite frac plug would be to make installation quick and easy. No special tools need to be deployed in the casing string to set the frac plugs, which maintains the flexibility provided by the plug-and-perforation technique.
As with previous wells, a conventional electric setting tool was used to set the Illusion® frac plugs. The large-bore ID allows operators to produce through the plug while it remains in the wellbore and begins the dissolution process immediately after fracturing.
days of intervention
200 thousand saved
issues with pump-down installation and fracturing
The Illusion dissolvable frac plugs were pumped down and set without issue during the fracturing operations. Run-in-hole speeds exceeded 400 ft (122 m) per minute through the horizontal—a conservative but typical, application of Illusion plug efficiency and reliability.
All 15 plugs held up to fracture treatment pressures, even after hours of down time and wellbore fluid exposure.
The operator successfully flowed back the wellbore and began production without issue, which helped eliminate the need for a wellbore cleanout intervention. This saved an estimated USD 200,000 in costs typically associated with a CT millout operation.
Because Halliburton Illusion frac plugs helped eliminate the need for intervention, the application was a success for the operator.