Case Studies
See why leading companies are choosing Halliburton products and services for their upstream energy needs

Choose Area
Challenges
Product/Service Capability
Brand
Location


Filter By |
Количество записей на странице
Show
results per page
|
documentDate
creationDate
yes
false
_blank
true
creationDate
[{"contenttype":"centerColList","datasource":[{"title":"Mexico: PEMEX geodirige el pozo de bajo balancecon tuberías de perforación \u201ccableadas\u201d de alta velocidad","description":"La compañía de petróleo propiedad del estado, PEMEX, recientemente finalizó la perforación del primer pozo en el mundo utilizando una\nnueva exitosa interfaz entre LWD, MWD y las herramientas del sistema de dirección giratoria (RSS) de Sperry Drilling Services y un único sistema\nde telemetría de tubería de perforación \u201ccableada\u201d de IntelliServ Inc., una división de Grant Prideco.\n","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H06031S.pdf","docCreatedDate":"2008-10-01T08:00:00.000Z","modifiedDate":"2008-09-24T23:30:00.000-05:00","docdate":"2008-10-01T08:00:00.000Z","docrefNum":"H06031S","languageSet":["Spanish"],"accessType":"R","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,|brandgroups:Sperry_Drilling_Services,|locations:North_America,North_America:Mexico,|prodgroups:Drilling:Telemetry,Drilling,"},{"title":"Sperry Remote Operations Center™ (ROC™) in Saudi Arabia","description":"On a multi-well project, leveraging knowledge and experience gained on other projects in the area to timely detect problems, prevent damage to wells, and continue drilling on schedule.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H06369.pdf","docCreatedDate":"2008-09-01T08:00:00.000Z","modifiedDate":"2008-10-02T23:30:00.000-05:00","docdate":"2008-09-01T08:00:00.000Z","docrefNum":"H06369","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Sperry_Drilling_Services,|locations:Middle_East,Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Drilling,Real_Time_Services:Real_Time_Centers,Optimization_Services:Drilling_Optimization:Drillstring_Integrity,Optimization_Services:Drilling_Optimization,Optimization_Services,"},{"title":"Middle East: Middle Eastern Oil Company Saves $450,000 Field Testing the InSite AFR™ Sensor","description":"By eliminating unnecessary runs, use of the InSite AFR sensor in three\nhorizontal wells saved about nine days of rig time worth approximately\n$450,000. Also the sensor clearly revealed numerous geologic features.\n\n","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H06067.pdf","docCreatedDate":"2008-04-29T08:00:00.000Z","modifiedDate":"2008-09-24T23:30:00.000-05:00","docdate":"2008-04-29T08:00:00.000Z","docrefNum":"H06067","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,|brandgroups:Sperry_Drilling_Services,|locations:Middle_East,|prodgroups:LWD,LWD:Resistivity_Logging-LWD,LWD:Borehole_Imaging-LWD,Drilling,"},{"title":"Operator Identifies Shallow Surface-Casing Corrosion Without Costly Workover","description":"Halliburton Electromagnetic Pipe Xaminer® V (EPX™V) Tool Detects Metal Loss Near Wellhead","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/EPXV-ACX.pdf","docCreatedDate":"2017-08-17T23:30:00.000-05:00","modifiedDate":"2017-09-13T23:30:00.000-05:00","docdate":"2017-08-17T23:30:00.000-05:00","docrefNum":"H012611","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:North_America:United_States:Alaska,Global,|prodgroups:Wireline_and_Perforating:Cased_Hole_Logging:Well_Integrity-Cased_Hole_Logging,"},{"title":"Offshore Egypt Rigless Wireline Intervention Solution Adds 4,000 BOPD with Zero Water Production","description":"Complex Wireline Job Executed Safely and Efficiently","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Offshore-Egypt-Rigless-Wireline-Intervention-Solution-Adds-4000-BOPD-with-Zero-Water-Production.pdf","docCreatedDate":"2017-04-17T23:30:00.000-05:00","modifiedDate":"2017-04-13T23:30:00.000-05:00","docdate":"2017-04-17T23:30:00.000-05:00","docrefNum":"H012537","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Africa:Northern_Africa:Egypt_Northern_Africa,Global,|prodgroups:Wireline_and_Perforating:Deployment_and_Risk_Mitigation,Wireline_and_Perforating:Cased_Hole_Logging:Mechanical_Services,Wireline_and_Perforating:Production_Logging,Wireline_and_Perforating:Slickline:Mechanical_Intervention,"},{"title":"Integrated Reservoir Characterization Helps Resolve Critical Rock Properties in Highly Heterogeneous Formation","description":"Ingrain\u2019s Digital And Physical Rock Analysis Enhances Understanding of Reservoir Rock Properties Where Conventional Techniques Cannot Resolve","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/IntegratedReservoirCharacterization.pdf","docCreatedDate":"2017-10-19T23:30:00.000-05:00","modifiedDate":"2017-10-23T23:30:00.000-05:00","docdate":"2017-10-19T23:30:00.000-05:00","docrefNum":"H012721","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,North_America:United_States,|prodgroups:Formation_Evaluation:Petrophysics:Formation_and_Reservoir_Solutions_(FRS)_Petrophysics:Petrophysical_Rock_Characterization_with_Ingrain_Services,Formation_Evaluation:Geology:Formation_and_Reservoir_Solutions_(FRS)_Geology:Geological_Rock_Characterization_with_Ingrain_Services,Formation_Evaluation:Digital_Rock_Analysis,Formation_Evaluation:Petrophysics,Formation_Evaluation:Geology,"},{"title":"Halliburton Makes Splash in Deep Water \u2014 Saving Operator USD 1.2 Million in Rig Time","description":"Successful Acquisition of Cores, Samples, And Borehole Seismic Data in Ultradeep and Ultrahigh-Pressure Well","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/UltradeepCoring.pdf","docCreatedDate":"2017-11-17T22:30:00.000-06:00","modifiedDate":"2018-04-18T23:30:00.000-05:00","docdate":"2017-11-17T22:30:00.000-06:00","docrefNum":"H012142","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Formation_Evaluation:Geology:Rotary_Coring-Formation_Evaluation,Formation_Evaluation:Coring-Formation_Evaluation,"},{"title":"Halliburton CoreVault® RFP System Impacts Economic Decision Making and Reduces Risks ","description":"Unique technology helps provide optimum value and return on investment ","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/CoreVaultRFPSystem.pdf","docCreatedDate":"2017-06-15T23:30:00.000-05:00","modifiedDate":"2017-09-07T23:30:00.000-05:00","docdate":"2017-06-15T23:30:00.000-05:00","docrefNum":"H012595","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,North_America:United_States:Oklahoma,|prodgroups:Formation_Evaluation:Geology:Rotary_Coring-Formation_Evaluation,"},{"title":"Statoil Saves Substantial Rig Time Using Efficient Conveyance in Deep Water","description":"Halliburton Extended-Stroke DPU® tool offers dependability, power, and savings","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Statoil-Saves-Substantial-Rig-Time.pdf","docCreatedDate":"2016-09-22T23:30:00.000-05:00","modifiedDate":"2016-09-22T23:30:00.000-05:00","docdate":"2016-09-22T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Wireline_and_Perforating:Slickline,"},{"title":"Geophysical Attributes Acquired with the Halliburton FiberVSP™ Service Enhances Surface Seismic Data Processing","description":"3D Earth Model Generated From Data to Increase Accuracy in Drilling Future Wells","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/fiber-vsp-rockies.pdf","docCreatedDate":"2019-05-14T06:51:00.000-05:00","modifiedDate":"2019-05-14T07:53:59.461-04:00","docdate":"2019-05-14T06:51:00.000-05:00","docrefNum":"H013165","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,North_America:United_States,|prodgroups:Formation_Evaluation:Geophysics:Borehole_Seismic-Formation_Evaluation,Wireline_and_Perforating,"},{"title":"Successful Collaboration Between Halliburton and WEPCO Added 150% in Oil Daily Production Rate","description":"Rigless Pulsed-Neutron and Production Logging Operation Used To Identify Bypassed Oil Zones And Water Shutoff Reservoirs","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Successful-Collaboration-Added-in-Oil-Daily-Production-Rate.pdf","docCreatedDate":"2018-03-29T23:30:00.000-05:00","modifiedDate":"2018-03-26T23:30:00.000-05:00","docdate":"2018-03-29T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Africa:Northern_Africa:Egypt_Northern_Africa,|prodgroups:Wireline_and_Perforating:Cased_Hole_Logging:Formation_Evaluation-Cased_Hole_Logging:Pulsed_Neutron,Formation_Evaluation:Petrophysics,Formation_Evaluation:Pulsed_Neutron_Logging-Formation_Evaluation,Perforating_Solutions:Shaped_Charges,Wireline_and_Perforating:Production_Logging,"},{"title":"ICE Core® In-situ Downhole Fluid Analyses Enhances Reservoir Characterization","description":"Consistent Sampling Increases Confidence For Field Development Decision Making","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Aramco-ICE.pdf","docCreatedDate":"2017-06-06T23:30:00.000-05:00","modifiedDate":"2017-06-06T23:30:00.000-05:00","docdate":"2017-06-06T23:30:00.000-05:00","docrefNum":"H012535","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Middle_East,|prodgroups:Formation_Evaluation:Reservoir_Engineering-Formation_Evaluation:Downhole_Fluid_Identification,Formation_Evaluation:Reservoir_Engineering-Formation_Evaluation,"},{"title":"Perforate, Wash, and Cement Option for Dual Casing Saves 66 Hours of Valuable Rig Time","description":"Alternative to section milling saves USD 247,000 and mitigates HSE risk","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/perforate-wash-cement-for-dual-casing-saves-rig-time.pdf","docCreatedDate":"2018-10-01T14:34:00.000-05:00","modifiedDate":"2018-10-18T14:42:29.248-05:00","docdate":"2018-10-01T14:34:00.000-05:00","docrefNum":"H013045","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Europe:Western_Europe:Netherlands_Western_Europe,|prodgroups:Wireline_and_Perforating:Well_Abandonment,Perforating_Solutions,"},{"title":"Finding Success on the Over-Mature Fringes of Organic Shale Plays","description":"Halliburton Corevault® RFP System and XMR™ Serviceaccurately assessed the field's geologic trend forinformed field planning.","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/finding-success-on-the-over-mature-fringes.pdf","docCreatedDate":"2018-08-18T23:30:00.000-05:00","modifiedDate":"2018-08-24T23:30:00.000-05:00","docdate":"2018-08-18T23:30:00.000-05:00","docrefNum":"H013028","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Formation_Evaluation,Formation_Evaluation:Petrophysics:Nuclear_Magnetic_Resonance-Formation_Evaluation,Coring,Formation_Evaluation:Geology:Rotary_Coring-Formation_Evaluation,Formation_Evaluation:Coring-Formation_Evaluation,Wireline_and_Perforating:Sidewall_Coring,"},{"title":"CAST-XR™Tool Pushes the Limits of Circumferential Ultrasonic Cement Evaluation","description":"Halliburton performs first-ever circumferential ultrasonic cement evaluation in 1-in. casing for Petrobras","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/CAST-XR-Tool-Pushes-the-Limits.pdf","docCreatedDate":"2016-10-19T23:30:00.000-05:00","modifiedDate":"2016-10-19T23:30:00.000-05:00","docdate":"2016-10-19T23:30:00.000-05:00","docrefNum":"H012343","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:South_America:Brazil_Eastern_South_America,Global,|prodgroups:Wireline_and_Perforating:Casing_and_Cement,Wireline_and_Perforating:Cased_Hole_Logging,"},{"title":"Perenco Uses New Workflow to Create Gains in Production and Locate New Zones Once Considered Uneconomical","description":" Integrated Reservoir Evaluation Approach Combines MRIL® Service and RDT™ Tester","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Workflow-to-Create-Gains-in-Production.pdf","docCreatedDate":"2016-11-22T22:30:00.000-06:00","modifiedDate":"2016-11-22T22:30:00.000-06:00","docdate":"2016-11-22T22:30:00.000-06:00","docrefNum":"H012273","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Africa:Western_Africa:Gabon_Western_Africa,|prodgroups:Formation_Evaluation:Petrophysics:Nuclear_Magnetic_Resonance-Formation_Evaluation,Formation_Evaluation:Petrophysics,Formation_Evaluation:Reservoir_Engineering-Formation_Evaluation,Formation_Evaluation:Reservoir_Engineering-Formation_Evaluation:Downhole_Fluid_Identification,Formation_Evaluation:Reservoir_Engineering-Formation_Evaluation:Formation_Testing-Formation_Evaluation,"},{"title":"Halliburton Wireline Solution Saves Client 80 Hours in Rig Time","description":"New service execution benchmark set in Ultradeepwater exploration drilling campaign","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Aker-Energy-Ghana.pdf","docCreatedDate":"2019-07-30T14:07:00.000-05:00","modifiedDate":"2019-07-30T15:17:52.084-04:00","docdate":"2019-07-30T14:07:00.000-05:00","docrefNum":"H013337","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Deepwater,|locations:Global,Africa:Western_Africa:Ghana_Western_Africa,|prodgroups:Wireline_and_Perforating:Formation_and_Reservoir_Solutions_(FRS),Formation_Evaluation,Wireline_and_Perforating:Sidewall_Coring,"},{"title":"Halliburton Water Conformance Tool Suite Instrumental in Adding 1 MMscf/d to Production without Additional Water","description":"An operator needed a way to find entry points of wat","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/halliburton-water-conformance-tool-suite.pdf","docCreatedDate":"2019-02-19T13:15:00.000-06:00","modifiedDate":"2019-02-25T14:18:26.325-05:00","docdate":"2019-02-19T13:15:00.000-06:00","docrefNum":"H013003","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:North_America:United_States:Alaska,|prodgroups:Wireline_and_Perforating:Evaluation_Solutions:Fluid_Evaluation,Wireline_and_Perforating:Cased_Hole_Logging:Pipe_Evaluation,"},{"title":"First Halliburton Dynamic Underbalance Perforating Job in Cameroon Achieves Customer\u2019s Goals","description":"Successful performance clears out debris and improves production","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Dynamic-Underbalanc-Perforating-Cameroon.pdf","docCreatedDate":"2016-11-14T22:30:00.000-06:00","modifiedDate":"2016-11-14T22:30:00.000-06:00","docdate":"2016-11-14T22:30:00.000-06:00","docrefNum":"H012365","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|locations:Global,Africa:Western_Africa:Cameroon_Western_Africa,|prodgroups:Wireline_and_Perforating,Perforating_Solutions,"},{"title":"Operator Refines Rock Typing by Adding Geological Classifications Based on Textures","description":"Digital Rock Analysis Allows for The Quantification Of The Relative Producibility Of Different Rock Textures","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/OperatorRefinesRockTyping.pdf","docCreatedDate":"2017-10-19T23:30:00.000-05:00","modifiedDate":"2018-02-26T22:30:00.000-06:00","docdate":"2017-10-19T23:30:00.000-05:00","docrefNum":"H012726","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Middle_East,Global,|prodgroups:Wireline_and_Perforating:Cased_Hole_Logging:Pipe_Evaluation,Wireline_and_Perforating:Casing_and_Cement:Casing_Inspection,Wireline_and_Perforating,"},{"title":"Ingrain Helped Quantify Organic Porosity and Predict Estimated Ultimate Recovery Using Cuttings","description":"ZoneID® Calibrated Hydrocarbon Pore Volume Enables Development of Robust Geologic Model Without Pilot Wells or Sidewall Coring","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Ingrain-Eagle-Ford.pdf","docCreatedDate":"2017-11-17T22:30:00.000-06:00","modifiedDate":"2018-01-02T22:30:00.000-06:00","docdate":"2017-11-17T22:30:00.000-06:00","docrefNum":"H012722","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States:Texas,|prodgroups:Formation_Evaluation:Digital_Rock_Analysis,Formation_Evaluation:Petrophysics:Formation_and_Reservoir_Solutions_(FRS)_Petrophysics:Petrophysical_Rock_Characterization_with_Ingrain_Services,Formation_Evaluation:Geology:Formation_and_Reservoir_Solutions_(FRS)_Geology:Geological_Rock_Characterization_with_Ingrain_Services,Formation_Evaluation:Geology,Formation_Evaluation:Petrophysics,"},{"title":"Conveyance Method Aids in Large Rigless Production Enhancement, Saving 5 Days of Intervention Time","description":"Successful utilization of e-line tractor in horizontal, high-pressure, and high-temperature gas wells","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Conveyance-Method-Aids-in-Large-Rigless-Production-Enhancement.pdf","docCreatedDate":"2017-01-03T22:30:00.000-06:00","modifiedDate":"2017-02-13T22:30:00.000-06:00","docdate":"2017-01-03T22:30:00.000-06:00","docrefNum":"H012402","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure,Reservoir_Challenges:High_Temperature,|locations:Global,Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Wireline_and_Perforating:Slickline,Wireline_and_Perforating:Slickline:Mechanical_Intervention,"},{"title":"Halliburton Collaborates with Client to Develop World\u2019s First Corrosive Hostile Environment Gun System","description":" CHE™ technology built to last 20-plus years in extreme deepwater environments","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/CHE-TECHNOLOGY.pdf","docCreatedDate":"2016-08-18T23:30:00.000-05:00","modifiedDate":"2016-08-18T23:30:00.000-05:00","docdate":"2016-08-18T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Oceania:Australia_Oceania,Global,|prodgroups:Perforating_Solutions:Gun_Systems,Perforating_Solutions,"},{"title":"Halliburton Formation Evaluation (FE) Program Helps Client Discover More than 400 Feet of Net Pay","description":"Safe, efficient operations collected the required data in 17 days across two wellbores","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Halliburton-Formation-Evaluation-Program.pdf","docCreatedDate":"2019-07-30T15:11:00.000-05:00","modifiedDate":"2019-07-30T16:21:57.201-04:00","docdate":"2019-07-30T15:11:00.000-05:00","docrefNum":"H013343","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Formation_Evaluation,Wireline_and_Perforating:Formation_and_Reservoir_Solutions_(FRS):Deepwater_Reservoir_Solutions_Center,Formation_Evaluation:Geology:Rotary_Coring-Formation_Evaluation,Wireline_and_Perforating:Open_Hole_Wireline,Formation_Evaluation:Geology:Borehole_Imaging-Formation_Evaluation,"},{"title":"Halliburton Introduces Vertical Stress-Oriented Perforating Solution in Large Middle East Gas Field","description":"New vertical stress-oriented perforating method optimizes production","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/VerticalStress-Oriented-Perforating-Large-Middle-East-Gas-Field.pdf","docCreatedDate":"2016-11-14T22:30:00.000-06:00","modifiedDate":"2016-12-02T22:30:00.000-06:00","docdate":"2016-11-14T22:30:00.000-06:00","docrefNum":"H012310","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|locations:Middle_East,Global,|prodgroups:Wireline_and_Perforating,Perforating_Solutions,"},{"title":"Halliburton Technology Helps Identify Annular Shale Barriers for P&A Operations","description":"Standard mono-conductor cement evaluation tools and robust data processing help client avoid costly remedial work.","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/plug-and-abandonment.pdf","docCreatedDate":"2019-03-18T08:25:00.000-05:00","modifiedDate":"2019-03-18T10:02:07.945-04:00","docdate":"2019-03-18T08:25:00.000-05:00","docrefNum":"H012903","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Wireline_and_Perforating:Well_Abandonment,"},{"title":"FiberVSP™ Service Acquires Quality VSP Data in Significantly Less Time than Conventional VSP","description":"A FiberVSP™ service was run simultaneously with a Halliburton reservoir monitoring operation via a SPECTRUM® Real-Time CT unit resulting in quality data in significantly less time than conventional VSP.","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/fibervsp-acquires-quality-data-in-less-time.pdf","docCreatedDate":"2019-01-18T13:34:00.000-06:00","modifiedDate":"2019-01-18T13:36:25.644-06:00","docdate":"2019-01-18T13:34:00.000-06:00","docrefNum":"H013104","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States:Texas,|prodgroups:Wireline_and_Perforating:Borehole_Seismic_Analysis,"},{"title":"Halliburton Helps Determine Fracture Height for Tecpetrol S.A.","description":"The RMT-I™ Pulsed-Neutron Tool Accurately Helped Assess Unconventional Reservoir Gas Productivity","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Argentina-RMT-I.pdf","docCreatedDate":"2017-04-21T23:30:00.000-05:00","modifiedDate":"2017-04-21T23:30:00.000-05:00","docdate":"2017-04-21T23:30:00.000-05:00","docrefNum":"H012505","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:South_America:Argentina_Southern_South_America,Global,|prodgroups:Formation_Evaluation:Petrophysics,Formation_Evaluation:Pulsed_Neutron_Logging-Formation_Evaluation,"},{"title":"Wellbore Cleanout Saves Customer USD 18 Million","description":"Operation helps customer avoid 90 days f deferred production and a coiled-tubing intervention","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Wellbore-Cleanout-Angola.pdf","docCreatedDate":"2016-08-10T23:30:00.000-05:00","modifiedDate":"2016-08-12T23:30:00.000-05:00","docdate":"2016-08-10T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Africa:Southern_Africa:Angola_Southern_Africa,Global,|prodgroups:Wireline_and_Perforating:Slickline,"},{"title":"Halliburton Helps Increase Oil Production for Kinder Morgan EOR Project","description":"The RMT-3DTM Pulsed-Neutron tool accurately monitors reservoir water, oil, and CO2 volumes","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Increase-Oil-Production-Permian-case-study.pdf","docCreatedDate":"2016-11-04T23:30:00.000-05:00","modifiedDate":"2016-11-04T23:30:00.000-05:00","docdate":"2016-11-04T23:30:00.000-05:00","docrefNum":"H012337","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States:Texas,Global,|prodgroups:Formation_Evaluation:Pulsed_Neutron_Logging-Formation_Evaluation,Wireline_and_Perforating:Cased_Hole_Logging:Formation_Evaluation-Cased_Hole_Logging:Pulsed_Neutron,Wireline_and_Perforating:Cased_Hole_Logging:Formation_Evaluation-Cased_Hole_Logging:Memory_Pulsed_Neutron,Formation_Evaluation:Petrophysics,Wireline_and_Perforating:Cased_Hole_Logging,"},{"title":"W&T Offshore Reaches New Pay Zone with GeoBalance® Managed Pressure Drilling Service","description":"MPD service maximizes asset value in Mahogany field","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/mpd-gom-wt.pdf","docCreatedDate":"2017-04-27T23:30:00.000-05:00","modifiedDate":"2017-04-27T23:30:00.000-05:00","docdate":"2017-04-27T23:30:00.000-05:00","docrefNum":"H012475","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Optimize_Drilling_Conditions,Reduce_Nonproductive_Time,Drilling_Challenges:Exploration,Drilling_Challenges:Improving_Drilling_Efficiency,|locations:Global,|prodgroups:Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling,"},{"title":"GeoBalance® Service Helps Operator Save Big in Challenging Deepwater Environment","description":"Automated managed pressure drilling system successfully drills \u2018undrillable\u2019 wells in 2,000 meters of water","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/automated-mpd-brazil.pdf","docCreatedDate":"2016-12-02T22:30:00.000-06:00","modifiedDate":"2016-12-02T22:30:00.000-06:00","docdate":"2016-12-02T22:30:00.000-06:00","docrefNum":"H012304","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Improving_Drilling_Efficiency,Reduce_Nonproductive_Time,Borehole_Challenges:Borehole_Stability,Deepwater,Drilling_Challenges:Increased_ROP,Drilling_Challenges:Optimize_Drilling_Conditions,Drilling_Challenges:Exploration,|locations:Global,|prodgroups:Drilling:Optimized_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,"},{"title":"WiFire™ Acoustic Firing Head","description":"WiFire™ Acoustic Firing Head, enabled by DynaLink® telemetry system, provides safer, cost-effective method to evaluate reservoir","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/WiFire-Acoustic-Firing-Head.pdf","docCreatedDate":"2017-11-11T22:30:00.000-06:00","modifiedDate":"2017-11-17T22:30:00.000-06:00","docdate":"2017-11-11T22:30:00.000-06:00","docrefNum":"H012757","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges,|locations:Global,|prodgroups:Reservoir_Testing_&_Analysis_(Reservoir_Testing_&_Sampling):Data_Acquisition_&_Sensors,Reservoir_Testing_&_Analysis_(Reservoir_Testing_&_Sampling):Test_Tools_(Drillstem_Testing),Reservoir_Testing_&_Analysis_(Reservoir_Testing_&_Sampling):Test_Tools_(Drillstem_Testing):Cased_Hole_Test_Tools,"},{"title":"Mobile Testing Package Enables Early Production","description":"Mobile express surface well testing system helps operator achieve production goals in new fields","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/mobile-swt-early-production-brazil.pdf","docCreatedDate":"2016-10-01T23:30:00.000-05:00","modifiedDate":"2016-11-15T22:30:00.000-06:00","docdate":"2016-10-01T23:30:00.000-05:00","docrefNum":"H012366","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Remote_Locations,Reducing_Costs,|locations:Global,|prodgroups:Reservoir_Testing_&_Analysis_(Reservoir_Testing_&_Sampling):Surface_Well_Testing-Reservoir_Testing_&_Sampling,"},{"title":"Full Acoustic Control of Drill Stem Test","description":"How a dialogue with the reservoir improved well control, measurement, and analysis.","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/rezConnect.pdf","docCreatedDate":"2015-03-01T22:30:00.000-06:00","modifiedDate":"2015-04-09T23:30:00.000-05:00","docdate":"2015-03-01T22:30:00.000-06:00","docrefNum":"H011684","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,|prodgroups:Reservoir_Testing_&_Analysis_(Reservoir_Testing_&_Sampling):Test_Tools_(Drillstem_Testing),Reservoir_Testing_&_Analysis_(Reservoir_Testing_&_Sampling):Data_Acquisition_&_Sensors,"},{"title":"Improving Well Performance Through Flowback Optimization","description":"CALIBR℠ Engineered Flowback Service - Permian Basin","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/calibr-permian.pdf","docCreatedDate":"2017-07-24T23:30:00.000-05:00","modifiedDate":"2017-07-26T23:30:00.000-05:00","docdate":"2017-07-24T23:30:00.000-05:00","docrefNum":"H012253","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Production_Challenges:Improving_Oil_Recovery,Production_Challenges:Production_Optimization,|locations:Global,|prodgroups:Reservoir_Testing_&_Analysis_(Reservoir_Testing_&_Sampling):Surface_Well_Testing-Reservoir_Testing_&_Sampling,"},{"title":"Engineered Solution Enables Operator to Successfully Drill Reentry Well in Gulf of Mexico","description":"Integrated Drilling Service Achieves Drilling Program Goals\n","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/MarineSentryRCD3000-GOM.pdf","docCreatedDate":"2017-08-07T23:30:00.000-05:00","modifiedDate":"2017-11-20T22:30:00.000-06:00","docdate":"2017-08-07T23:30:00.000-05:00","docrefNum":"H012683","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Optimize_Drilling_Conditions,|locations:Global,|prodgroups:Drilling:Optimized_Pressure_Drilling,"},{"title":"Operator Streamlines Intervention Operations in Deep Water with Dash® Large Bore Subsea Safety System","description":"The electrohydraulic Dash® large bore subsea safety system was specifically tailored for the operation and was deployed for the two-well campaign, providing more real-time data to the operator and giving it the ability to isolate and disconnect from the well faster than traditional systems without compromising safety,","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/dash-gom.pdf","docCreatedDate":"2017-04-17T23:30:00.000-05:00","modifiedDate":"2017-04-28T23:30:00.000-05:00","docdate":"2017-04-17T23:30:00.000-05:00","docrefNum":"H012563","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Subsea:Completion_&_Intervention-Subsea,"},{"title":"MPD and Cementing Operation for Shell Offshore","description":"GEOBALANCE® Applications helps maintain wellbore integrity in narrow margin, avoiding two weeks of NPT","path":"/content/dam/ps/public/ts/contents/Case_Histories/web/mpd-and-mpc-asiapac-shell.pdf","docCreatedDate":"2018-04-26T23:30:00.000-05:00","modifiedDate":"2018-04-26T23:30:00.000-05:00","docdate":"2018-04-26T23:30:00.000-05:00","docrefNum":"H012811","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges,|locations:Global,|prodgroups:Drilling:Optimized_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling:Managed_Pressure_Cementing_Systems,"},{"title":"Deepwater GOM Challenges Span Full Well Process","description":"In the deepwater Gulf of Mexico, the most recent success is frequently followed by the next great challenge.","path":"/content/dam/ps/public/solutions/contents/Deep_Water/related_docs/0509HEP_Halliburton.pdf","docCreatedDate":"2009-05-11T23:30:00.000-05:00","modifiedDate":"2009-05-11T23:30:00.000-05:00","docdate":"2009-05-11T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Deepwater,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,"},{"title":"Geomechanical Analysis of Casing Failure in Deepwater GOM Well Facilitates Effective Completion Design and Trouble Free Drilling","description":"Following a 13 3/8 in. casing collapse in a subsalt well, partners of the deepwater Knotty Head #1 discovery well were looking to better understand the field geomechanics, especially the casing requirements imposed by the salt overhang.","path":"/content/dam/ps/public/solutions/contents/Deep_Water/related_docs/Knotty_Head_Drillworks_CH.pdf","docCreatedDate":"2009-08-27T23:30:00.000-05:00","modifiedDate":"2009-08-27T23:30:00.000-05:00","publishDate":"2018-10-02T13:16:16.340-05:00","docdate":"2009-08-27T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Deepwater,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,"},{"title":"International oil company unlocked new reserves in remote deep water","description":"Major deepwater find in the Philippines\r\nOperator overcame limited infrastructure to hit new reserves in complex play\r\n","path":"/content/dam/ps/public/solutions/contents/Deep_Water/related_docs/Final_XOM_H08638.pdf","docCreatedDate":"2011-06-01T23:30:00.000-05:00","modifiedDate":"2011-10-05T23:30:00.000-05:00","docdate":"2011-06-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,"},{"title":"Intercept® Retrievable Bridge Plug Provides V0 Barrier on Two Batch Wells with Zero NPT","description":"Halliburton retrievable bridge plug helps ensure stability and safety ","path":"/content/dam/ps/public/tttcp/contents/Case_Histories/web/Intercept-Norway-V0-BatchWells-H012927.pdf","docCreatedDate":"2018-04-25T23:30:00.000-05:00","modifiedDate":"2018-04-25T23:30:00.000-05:00","docdate":"2018-04-25T23:30:00.000-05:00","docrefNum":"H012927","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reduce_Nonproductive_Time,Reservoir_Challenges:Mature_Fields,Deepwater,Reducing_Costs,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions:Retrievable_Bridge_Plugs,Wellbore_Service_Tools:Retrievable_Tools,"},{"title":"World's first run with 20-in. RTTS® high-expansion packer takes safety and savings to new heights","description":"In the North Sea, a major operator\u2019s floating\ndrilling rig failed to pull out the wear bushing when running\n13 3/8-in. casing, preventing the pulling tool from passing through\nthe upper annular preventer. They needed to quickly find a solution\nthat would allow them to displace to seawater and disconnect the\nlower marine riser package (LMRP).","path":"/content/dam/ps/public/tttcp/contents/Case_Histories/web/H011275.pdf","docCreatedDate":"2014-09-09T23:30:00.000-05:00","modifiedDate":"2014-09-09T23:30:00.000-05:00","docdate":"2014-09-09T23:30:00.000-05:00","docrefNum":"H011275","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,|prodgroups:Wellbore_Service_Tools:Retrievable_Tools,"},{"title":"Long String Cemented RapidSuite™ System with Plug and Perf Saves Time and Reduces Risk","description":"A major customer in Mid-Continent, USA was looking to reduce risk, time and cost of their multistage,\nextended-reach lateral, horizontal completion campaign in the\nWoodford shale.","path":"/content/dam/ps/public/tttcp/contents/Case_Histories/web/H010903_Woodford.pdf","docCreatedDate":"2016-07-01T23:30:00.000-05:00","modifiedDate":"2016-07-05T23:30:00.000-05:00","docdate":"2016-07-01T23:30:00.000-05:00","docrefNum":"H010903","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Cementing:Cementing_Products_and_Processes:Cementing_Systems_and_Services,"},{"title":"Halliburton PinPoint Injection (PPI) Packer Isolates Multiple Zones in a Single Trip","description":"Record Treatment Length Reduces Operating Cost","path":"/content/dam/ps/public/tttcp/contents/Case_Histories/web/PPI-Packer-GoM.pdf","docCreatedDate":"2018-07-02T23:30:00.000-05:00","modifiedDate":"2018-07-02T23:30:00.000-05:00","docdate":"2018-07-02T23:30:00.000-05:00","docrefNum":"H012988","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Wellbore_Service_Tools:Retrievable_Tools,"},{"title":"Intercept® Retrievable Bridge Plug is Successfully Installed and Then Retrieved After Nine Months in Wellbore ","description":"Halliburton Retrievable Bridge Plug Provides Gas-Tight, V-0 Grade Barrier","path":"/content/dam/ps/public/tttcp/contents/Case_Histories/web/Intercept-RBP-9Months.pdf","docCreatedDate":"2018-08-01T23:30:00.000-05:00","modifiedDate":"2018-08-01T23:30:00.000-05:00","docdate":"2018-08-01T23:30:00.000-05:00","docrefNum":"H013016","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions:Retrievable_Bridge_Plugs,Wellbore_Service_Tools:Retrievable_Tools,"},{"title":"Fas Drill® SVB packer provides isolation for high-volume cement squeeze job","description":"A customer in New Mexico was performing a two-stage, cement job for a\n9 5/8-in. casing string, but, during the first cement stage all returns were\nlost. Whether due to a natural fracture in the formation or just a\nhigh-permeability, low-pressure zone, the operator was now faced with\na difficult cement squeeze job to shut off the thief zone and allow cement\nto reach the surface as per local regulatory requirements.","path":"/content/dam/ps/public/tttcp/contents/Case_Histories/web/H011932-FasDrillSVB.pdf","docCreatedDate":"2015-11-30T22:30:00.000-06:00","modifiedDate":"2015-11-30T22:30:00.000-06:00","docdate":"2015-11-30T22:30:00.000-06:00","docrefNum":"H011932","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Packers-Service_Tools,Completion_Equipment_and_Services:Packers,"},{"title":"Halliburton Retrievable Tools Save Operator $750,000","description":"Engineered Single-Trip Completion Solution Reduces Time and Cost","path":"/content/dam/ps/public/tttcp/contents/Case_Histories/web/Model2-RTTS-Packer-GOM-750K.PDF","docCreatedDate":"2018-07-27T23:30:00.000-05:00","modifiedDate":"2018-07-26T23:30:00.000-05:00","docdate":"2018-07-27T23:30:00.000-05:00","docrefNum":"H012993","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Wellbore_Service_Tools:Retrievable_Tools,"},{"title":"RapidStage® Sleeve Helps Operator Realize a 66% Increase in Completion Efficiency","description":"An operator in South Texas wanted to improve well economics snd lower the cost per barrel of oil equivalent (BOE) for a well in a new part of the Eagle Ford Shale.","path":"/content/dam/ps/public/tttcp/contents/Case_Histories/web/H09898.pdf","docCreatedDate":"2017-05-03T23:30:00.000-05:00","modifiedDate":"2017-05-10T23:30:00.000-05:00","docdate":"2017-05-03T23:30:00.000-05:00","docrefNum":"H09898","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"Halliburton Sets Industry Record for Jack/St. Malo Project","description":"ESTMZ system sets industry record for Jack/St. Malo project in GoM.","path":"/content/dam/ps/public/cps/contents/BD_Mktg/ESTMZ-JackStMalo.pdf","docCreatedDate":"2015-06-18T23:30:00.000-05:00","modifiedDate":"2015-06-18T23:30:00.000-05:00","docdate":"2015-06-18T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Production_Challenges:Sand_Production,Deepwater,|locations:Global,|prodgroups:Sand_Control:Multizone_Sand_Control_Systems,"},{"title":"Advanced Completion Solutions for Multizone Water Injection in Soft Sand","description":"World's First 10,000-PSI Triple-Zone Intelligent Completion for Water Injection","path":"/content/dam/ps/public/cps/contents/Data_Sheets/web/H/Advanced-Completions-Multizone-Water-Injection-H013120.pdf","docCreatedDate":"2019-02-12T14:48:00.000-06:00","modifiedDate":"2019-02-12T15:51:02.152-05:00","docdate":"2019-02-12T14:48:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Sand_Control:Screens:Inflow_Control,"},{"title":"CleanWell® Solutions Help Operator to Effectively Clean Up Challenging Big-Bore ERD Well","description":"Halliburton Delivers Unique Solution with Zero HSE Issues or Non-Productive Time","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/CleanWell-BigBore-ERD-Russia-H013078.pdf","docCreatedDate":"2019-01-08T13:25:00.000-06:00","modifiedDate":"2019-01-08T13:29:33.812-06:00","docdate":"2019-01-08T13:25:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools,"},{"title":"Halliburton Expands Conventional Liner Hanger Deployments to the Middle East","description":"First MatchSet™ system is successfully installed in Oman","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H013082-MatchSet-Oman.pdf","docCreatedDate":"2018-12-06T10:53:00.000-06:00","modifiedDate":"2018-12-26T10:53:28.880-06:00","docdate":"2018-12-06T10:53:00.000-06:00","docrefNum":"H013082","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Middle_East:Oman_Middle_East,|prodgroups:Completion_Equipment_and_Services:Liner_Hangers:Conventional_Liner_Hangers,Completion_Equipment_and_Services,"},{"title":"Why operators are willing to standardize on new Halliburton RapidStart™ Initiator CT sleeves","description":"Seneca Resources can now measure pre-frac prep time in hours\ninstead of days, and has cut casing test costs by 40 percent.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H010814_RSI_Seneca.pdf","docCreatedDate":"2013-10-01T23:30:00.000-05:00","modifiedDate":"2013-10-09T23:30:00.000-05:00","docdate":"2013-10-01T23:30:00.000-05:00","docrefNum":"H010814","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Horizontal_Completions,Production_Challenges:Unconventional_Resources,Production_Challenges:Improve_Wellbore_Integrity,Production_Challenges:Completion_Integrity,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"How Chevron saved an average of 18 days per well on three deepwater GoM wells","description":"New Enhanced Single-Trip Multizone (ESTMZ™) completion system sets industry records and improves economics of ultra-deepwater development.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H010750.pdf","docCreatedDate":"2013-08-22T23:30:00.000-05:00","modifiedDate":"2013-08-22T23:30:00.000-05:00","docdate":"2013-08-22T23:30:00.000-05:00","docrefNum":"H010750","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,Reducing_Costs,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,North_America,|prodgroups:Sand_Control:Multizone_Sand_Control_Systems,"},{"title":"Fas Drill® Ultra Frac Plugs Reduce Time of Millout Operations and Save Operator Significant Cost","description":"Average Millout Time Proves to be Less Than 4 Minutes, and a Small Amount of Debris Allows Millout of All Plugs in Each Well Without Short Trips","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/fas-drill-ultra-plug-saves-cost-argentina.pdf","docCreatedDate":"2019-03-14T10:47:00.000-05:00","modifiedDate":"2019-03-14T11:48:27.443-04:00","docdate":"2019-03-14T10:47:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Plugs-Service_Tools,Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Plugs-Service_Tools:Frac_Plugs,"},{"title":"Illusion® Frac Plug Helps Eliminate High-Risk Millout Operations","description":"A major operator drilling in the Bakken and Three Forks formations in the Williston Basin was concerned about depleted reservoir conditions due to close well spacing. The operator needed a solution that would eliminate the wellbore intervention step required to clean out traditional composite frac plugs.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012203-Illusion-Williston.pdf","docCreatedDate":"2016-05-12T23:30:00.000-05:00","modifiedDate":"2016-05-12T23:30:00.000-05:00","docdate":"2016-05-12T23:30:00.000-05:00","docrefNum":"H012203","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,"},{"title":"First Single-Trip Negative Test and Wellbore Cleanup in Egypt","description":"Inflow Tech test packer displaces fluids in a single-trip solution","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012282-CleanWell-Egypt.pdf","docCreatedDate":"2016-10-19T23:30:00.000-05:00","modifiedDate":"2016-10-19T23:30:00.000-05:00","docdate":"2016-10-19T23:30:00.000-05:00","docrefNum":"H012282","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Riser_Cleanout_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Debris_Extraction_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Specialty_Tools-Wellbore_Cleaning,"},{"title":"RapidStage® frac sleeves and RapidBall™ self-removing balls delivered increased efficiency and cost savings without wellbore intervention","description":"An independent oil and gas operator in Alaska was looking for new ways to help reduce well costs and intervention. The completion design called for a production liner to be run and 11 stages to be stimulated through the target section of a wellbore that was more than 20,000 feet in total measured depth (TMD).","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011803-RapidBall-Alaska.pdf","docCreatedDate":"2015-07-24T23:30:00.000-05:00","modifiedDate":"2015-07-24T23:30:00.000-05:00","docdate":"2015-07-24T23:30:00.000-05:00","docrefNum":"H011803","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Unconventional_Completions:Accessories-Horizontal_Completions,"},{"title":"Swellpacker® Sleeve and Anchor Enables Well Abandonment","description":"An operator in the North\nSea was unable to permanently abandon a well due to the\ninability to access the main wellbore. Halliburton designed\nand manufactured a hold-open sleeve (HOS) to straddle the\nsafety valve with integral no-go and Swellpacker® tool element\ndesigned to swell and anchor the sleeve in place.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H07233.pdf","docCreatedDate":"2018-04-16T23:30:00.000-05:00","modifiedDate":"2018-04-16T23:30:00.000-05:00","docdate":"2018-04-16T23:30:00.000-05:00","docrefNum":"H07233","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Zonal_isolation,|locations:Europe,Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Norway: Two Production Wells in Different Pressured Reservoirs Receive High-Pressure Water Injection from One Multilateral Well","description":"StatoilHydro required a TAML level 5 multilateral junction constructed from a subsea platform with the ability to accommodate high injection pressure and possible large pressure differences between the two lateral branches in two different reservoirs.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H06600_Norway_FlexRite_Case_History.pdf","docCreatedDate":"2009-07-15T23:30:00.000-05:00","modifiedDate":"2016-08-11T23:30:00.000-05:00","docdate":"2009-07-15T23:30:00.000-05:00","docrefNum":"H06600","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Reservoir_Challenges:Improve_Reservoir_Drainage,|locations:Europe:Northern_Europe:Norway_Northern_Europe,Global,|prodgroups:Multilateral,Multilateral:Multilateral_Completion_Systems,Multilateral:Multilateral_Pre-milled_Window_Systems,Drilling,"},{"title":"Single-trip solution to set packer and perform negative test saves operator rig time and $1.8 million","description":"A major operator challenged Halliburton to design and execute a single-trip solution to set an EZ Drill® SVB packer and to also\nperform a negative test from 13 ppg to 9 ppg of mud equivalent with the CleanWell® Inflow Tech® test packer. Additionally,\nHalliburton would need to install a wear bushing insert while running the operation in hole. When pulling out of the hole, the\nwear bushing insert would need to be removed and the setting area jetted. Performing these three applications in one run would\nbe a challenge, but the result would save the customer costly rig time.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011979-GOM-CWT.pdf","docCreatedDate":"2015-10-29T23:30:00.000-05:00","modifiedDate":"2016-04-22T23:30:00.000-05:00","docdate":"2015-10-29T23:30:00.000-05:00","docrefNum":"H011979","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Packers-Service_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Specialty_Tools-Wellbore_Cleaning,"},{"title":"Halliburton Shifts to Success in Eastern European Sea","description":"Since 2008, a major operator has been pursuing a highly specialized solution for stimulating their wells in an Eastern European Sea development project. In completing the final wells of their offshore\nreentry unconventional campaign, the key challenge they faced was finding a viable solution to selectively stimulate multiple independent zones in openhole horizontal applications that were\ndrilled from existing vertical wellbores.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011948.pdf","docCreatedDate":"2015-10-02T23:30:00.000-05:00","modifiedDate":"2015-10-02T23:30:00.000-05:00","docdate":"2015-10-02T23:30:00.000-05:00","docrefNum":"H011948","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Packers:Openhole_Packer,Completion_Equipment_and_Services:Unconventional_Completions:Accessories-Horizontal_Completions,"},{"title":"RapidStart® Initiator CT Sleeve Opens Successfully 32 Months After Installation","description":"Murphy Sees Repeated Reliability in DUC Wells","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012440-RSI-CT-Sleeve-32months.pdf","docCreatedDate":"2017-01-18T22:30:00.000-06:00","modifiedDate":"2017-05-10T23:30:00.000-05:00","docdate":"2017-01-18T22:30:00.000-06:00","docrefNum":"H012440","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"XtremeGrip™ System Offers Metal-to-Metal Solution","description":"High-performance liner hanger solves deepwater well challenges in elevated temperature for GoM operator.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011546-XTremeGrip-GOM.pdf","docCreatedDate":"2017-07-06T23:30:00.000-05:00","modifiedDate":"2017-07-06T23:30:00.000-05:00","docdate":"2017-07-06T23:30:00.000-05:00","docrefNum":"H011546","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,"},{"title":"Swellpacker® Systems Help Save $3 Million by Reducing Rig Time","description":"Halliburton enables greater productivity in development wells, helping to decrease completion time by 10 days","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H06786.pdf","docCreatedDate":"2017-08-22T23:30:00.000-05:00","modifiedDate":"2017-08-22T23:30:00.000-05:00","docdate":"2017-08-22T23:30:00.000-05:00","docrefNum":"H06786","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:South_America:Brazil_Eastern_South_America,|prodgroups:Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,Completion_Equipment_and_Services:Swell_Technology,"},{"title":"RapidStage® 50+ system with AccessFrac® service shines in the Bakken","description":"Dozens of applications using AccessFrac service have been successfully performed throughout the Rockies. In the Williston Basin, over 20 jobs performed with RapidStage 50+ sleeves and AccessFrac stimulation services in the past six months have resulted in a minimum of 30% sustained production improvement.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/RapidStage50-AccessFrac-Bakken.pdf","docCreatedDate":"2016-07-26T23:30:00.000-05:00","modifiedDate":"2016-07-28T23:30:00.000-05:00","docdate":"2016-07-26T23:30:00.000-05:00","docrefNum":"H011802","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Swell_Technology,Completion_Equipment_and_Services:Unconventional_Completions:Accessories-Horizontal_Completions,"},{"title":"Integrated Solution More Than Doubles Reservoir Contact","description":"Halliburton Multilateral Services and Intelligent Completions Optimizes Oil Production Offshore Saudi Arabia","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Saudi-MLT-IC.pdf","docCreatedDate":"2017-11-06T22:30:00.000-06:00","modifiedDate":"2017-11-06T22:30:00.000-06:00","docdate":"2017-11-06T22:30:00.000-06:00","docrefNum":"H07668","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intelligent_Completions:Interval_Control-WellDynamics,Multilateral:Multilateral_Milled_Exit_Systems,"},{"title":"BR0 Modular Straddle increases oil production and decrease GOR","description":"A global operator in Africa had a high gas/oil ratio (GOR) well and needed a mechanical solution to isolate the high gas-producing zone in order to improve oil production performance.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H010788-Angola.pdf","docCreatedDate":"2013-11-12T22:30:00.000-06:00","modifiedDate":"2013-11-12T22:30:00.000-06:00","docdate":"2013-11-12T22:30:00.000-06:00","docrefNum":"H010788","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Horizontal_Completions,Well_Control_Challenges:Gas_Hydrates,Production_Challenges:Control_of_Water_and_Gas_Production,Production_Challenges:Long_Term_Zonal_Isolation,Production_Challenges:Improving_Oil_Recovery,|locations:Global,|prodgroups:Wireline_and_Perforating:Slickline:Mechanical_Intervention,Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions,Wireline_and_Perforating:Slickline,"},{"title":"Cemented VersaFlex® expandable liner hanger provided superior reliability and saved 24 hours of rig time","description":"A major operator in Australia wanted to install a\n4 1/2-in. liner hanger into a 6 1/8-in. openhole wellbore. They knew that\nonce they reached total depth, if the flow rate was unacceptable, the\nliner hanger would need to be run and cemented in place to enable\nfracturing operations.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011210.pdf","docCreatedDate":"2014-09-03T23:30:00.000-05:00","modifiedDate":"2014-09-03T23:30:00.000-05:00","docdate":"2014-09-03T23:30:00.000-05:00","docrefNum":"H011210","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Cementing,Cementing:Cementing_Solutions:Slurries,Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,"},{"title":"Fas Drill® Ultra Frac Plugs Reduce Time and Difficulty of Millout Operations","description":"Average millout time proves to be 4.5 minutes, less than half of a typical composite plug","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/FasDrill-Ultra-Williston-H012640.pdf","docCreatedDate":"2017-09-21T23:30:00.000-05:00","modifiedDate":"2017-09-21T23:30:00.000-05:00","docdate":"2017-09-21T23:30:00.000-05:00","docrefNum":"H012640","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Plugs-Service_Tools:Frac_Plugs,Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Plugs-Service_Tools,Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools,"},{"title":"Versatile Completion Results in 72% GOR Reduction Without Affecting Oil Production","description":"Halliburton Delivers the Most Reliable, Cost-Effective Completion Over the Competition","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Algeria-UC-GOR-Reduction-H012594.pdf","docCreatedDate":"2017-09-13T23:30:00.000-05:00","modifiedDate":"2017-09-13T23:30:00.000-05:00","docdate":"2017-09-13T23:30:00.000-05:00","docrefNum":"H012594","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Production_Optimization,Production_Challenges:Unconventional_Resources,Well_Construction_Challenges:Zonal_isolation,Production_Challenges:Horizontal_Completions,Production_Challenges:Improving_Oil_Recovery,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Swell_Technology,Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,"},{"title":"CleanWell® Technology Saves Operator 18 Hours of Rig Time","description":"Utilizing CleanWell® technology with additional features for high-pressure, high-temperature (HP/HT) environments, Halliburton was able to save the operator 18 hours of rig time with zero safety incidents or NPT raised.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011142-Vietnam.pdf","docCreatedDate":"2014-08-01T23:30:00.000-05:00","modifiedDate":"2018-09-04T23:30:00.000-05:00","docdate":"2014-08-01T23:30:00.000-05:00","docrefNum":"H011142","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Horizontal_Completions,Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Casing_Cleanout_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Riser_Cleanout_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Debris_Extraction_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Specialty_Tools-Wellbore_Cleaning,"},{"title":"Illusion® Frac Plug Helps Operator Save $200,000","description":"All 15 plugs dissolved, removing the need for coiled tubing millout","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012448-Illusion-Argentina.pdf","docCreatedDate":"2017-01-31T22:30:00.000-06:00","modifiedDate":"2017-01-31T22:30:00.000-06:00","docdate":"2017-01-31T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,"},{"title":"North America:Isolate Water Zone in Extreme Dogleg Through Window Without Whipstock","description":"A customer in North America drilled a horizontal well. The horizontal section exposed the well to a 70-ft water bearing interval in the heel. A zonal isolation method capable of entering a window without a whipstock and navigating high severity doglegs was needed for water shut off.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H06055.pdf","docCreatedDate":"2014-06-12T23:30:00.000-05:00","modifiedDate":"2014-06-12T23:30:00.000-05:00","docdate":"2014-06-12T23:30:00.000-05:00","docrefNum":"H06055","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Zonal_isolation,|locations:Global,|prodgroups:Completion_Equipment_and_Services,Completion_Equipment_and_Services:Completion_Solutions,Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Mirage® Plug Turns 3 Hours of Rig Time Into 20 Minutes","description":"A major customer in Malaysia challenged Halliburton to design a single horizontal openhole completion for 18 of their wells.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H09940_Malaysia.pdf","docCreatedDate":"2017-02-02T22:30:00.000-06:00","modifiedDate":"2017-05-10T23:30:00.000-05:00","docdate":"2017-02-02T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Subsurface_Flow_Control_Devices,"},{"title":"Frac Sleeve DUC Well Completed 410 Days After Installation Shatters Local Record","description":"New level of ball-drop efficiency achieved in Bakken shale play","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Williston-DUC-Well.pdf","docCreatedDate":"2017-03-24T23:30:00.000-05:00","modifiedDate":"2017-05-10T23:30:00.000-05:00","docdate":"2017-03-24T23:30:00.000-05:00","docrefNum":"H012504","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Swell_Technology,Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,"},{"title":"Illusion® Frac Plugs Help Eliminate Post-Fracturing Treatment Intervention","description":"Operator Saves an estimated $200,000 in completion costs on plug-and-perf operation ","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Illusion-North-Dakota-NoMillout.pdf","docCreatedDate":"2016-08-17T23:30:00.000-05:00","modifiedDate":"2016-08-17T23:30:00.000-05:00","docdate":"2016-08-17T23:30:00.000-05:00","docrefNum":"H012302","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,"},{"title":"CleanWell® Solutions Enable Operator to Avoid Losses in the Upper Lateral Section","description":"Cost-Effective Cleanup Program Helps Eliminate Non-Productive Time","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/CleanWell-Solutions-Avoid-Losses-Middle-East-H012780.pdf","docCreatedDate":"2018-01-15T22:30:00.000-06:00","modifiedDate":"2018-03-06T22:30:00.000-06:00","docdate":"2018-01-15T22:30:00.000-06:00","docrefNum":"H012780","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Filtration_Services,Fluids_Solids_Control:Displacement_Systems,Wellbore_Service_Tools:Wellbore_Cleaning_Tools,"},{"title":"Norway: Top of Cement Isolation of Gas Zone on Subsea Field","description":"In one of the major subsea\nproducing fields in the North Sea, a hydrocarbon (HC) zone was\nidentified. The operator\u2019s primary challenge was to isolate this\nHC zone without cementing all the way into the previous casing\nshoe, which could potentially cause trapped pressure due to\ntemperature cycling and collapse of the previous casing.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H07995.pdf","docCreatedDate":"2015-06-19T23:30:00.000-05:00","modifiedDate":"2017-12-27T22:30:00.000-06:00","docdate":"2015-06-19T23:30:00.000-05:00","docrefNum":"H07995","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Zonal_isolation,|locations:Europe,Global,|prodgroups:Cementing,Cementing:Cementing_Products_and_Processes,Wireline_and_Perforating:Casing_and_Cement,Completion_Equipment_and_Services:Swell_Technology,Cementing:Cementing_Products_and_Processes:Cementing_Systems_and_Services,Cementing:Cementing_Solutions,"},{"title":"Asia: Swellpacker System and Gravel Pack Enable Zonal Isolation in OH SmartWell Completion","description":"A major oil and gas operator in southeast Asia required good zonal isolation of a multilayered, unconsolidated, stacked reservoir possessing several oil, water, and gas zones. The unique trajectory of the horizontal wellbore made access to\nmechanical flow control devices costly and problematic, therefore making it\nnecessary to remotely control or shut off the production from multiple zones\nin the advent of unwanted gas or water production. The use of gravel packing\ntechniques and sand screens were selected as the preferred method of sand\ncontrol for the single, horizontal section that includes three to five zones. A\nseries of external annular barriers to limit or eliminate zonal crossflow was a\nrequirement while ensuring that the gravel pack of the entire zone was not\nnegatively impacted.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H06427.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2013-11-13T22:30:00.000-06:00","docdate":"2013-11-01T23:30:00.000-05:00","docrefNum":"H06427","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Zonal_isolation,Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Asia,Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,Completion_Equipment_and_Services:Intelligent_Completions:Interval_Control-WellDynamics,"},{"title":"VersaFlex® Expandable Liner Hanger System Overcomes Pre-Salt and Fluid Loss Challenges","description":"Operator Saves $200K in Rig Time with No HSE or NPT","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012191-VersaFlex-Pre-Salt.pdf","docCreatedDate":"2016-04-27T23:30:00.000-05:00","modifiedDate":"2016-04-27T23:30:00.000-05:00","docdate":"2016-04-27T23:30:00.000-05:00","docrefNum":"H012191","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,"},{"title":"RapidStart® Initiator CT Sleeve Helps Seneca Resources Pump an Extra Frac Stage","description":"Single toe sleeve increases return on investment","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Seneca-RapidStart-Initiator-CT-Extra-Stage-H012928.pdf","docCreatedDate":"2018-05-15T23:30:00.000-05:00","modifiedDate":"2018-06-01T23:30:00.000-05:00","docdate":"2018-05-15T23:30:00.000-05:00","docrefNum":"H012928","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"Swellpacker® Systems Change Well Behavior and Increase Production by 2,000 BPD","description":"Cementing alternative helped prevent formation damage and increase production ","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H05769.pdf","docCreatedDate":"2017-07-19T23:30:00.000-05:00","modifiedDate":"2017-07-19T23:30:00.000-05:00","docdate":"2017-07-19T23:30:00.000-05:00","docrefNum":"H05769","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Workflow_Integration:HalComplete:Deepwater_Completions,|locations:South_America,Global,Central_America,|prodgroups:Completion_Equipment_and_Services:Completion_Solutions,Completion_Equipment_and_Services:Swell_Technology,Completion_Equipment_and_Services,"},{"title":"Wireline-set Versa-Trieve VTA packer saves customer","description":"China National Offshore Oil Corp. (CNOOC) China Ltd. Tianjin (CCLT) needed to complete eight wells, which required isolation of production zones\nin 7-in. casing.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H010848.pdf","docCreatedDate":"2014-03-07T22:30:00.000-06:00","modifiedDate":"2014-03-19T23:30:00.000-05:00","docdate":"2014-03-07T22:30:00.000-06:00","docrefNum":"H010848","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Zonal_isolation,|locations:Global,|prodgroups:Sand_Control:Downhole_Tools-Sand_Control:Tool_Systems-Sand_Control,"},{"title":"ZoneGuard® HE Packer Helps Reduce NPT For Operator","description":"SUCCESSFUL INSTALLATION IN DIFFICULT APPLICATION SAVES DAYS OF LOST TIME","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/ZoneGuard-HE-NPT.pdf","docCreatedDate":"2016-07-27T23:30:00.000-05:00","modifiedDate":"2016-07-28T23:30:00.000-05:00","docdate":"2016-07-27T23:30:00.000-05:00","docrefNum":"H012267","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Packers,Completion_Equipment_and_Services:Packers:Openhole_Packer,"},{"title":"Enhanced Solution for Wellbore Cleanup Operations Maximize Asset Value","description":"CleanWell® Solutions Deliver Operator a Direct Savings of 400K","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/CleanWell-Solutions-GOM-400kSavings.pdf","docCreatedDate":"2017-07-14T23:30:00.000-05:00","modifiedDate":"2017-07-14T23:30:00.000-05:00","docdate":"2017-07-14T23:30:00.000-05:00","docrefNum":"H012607","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Displacements_Effective_Displacements,|brandgroups:Baroid,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools,Fluids_Solids_Control:Displacement_Systems,Fluids_Solids_Control:Separation_&_Handling:Filtration_Services,"},{"title":"RapidStart® Initiator Sleeves Open Successfully After 10 Months in the Well","description":"How much is your time and investment worth to you?","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/RSI-10-months-Permian.pdf","docCreatedDate":"2016-10-05T23:30:00.000-05:00","modifiedDate":"2016-10-05T23:30:00.000-05:00","docdate":"2016-10-05T23:30:00.000-05:00","docrefNum":"H012331","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"First successful installation of parking sub and fluid loss isolation barrier valve in multilateral well","description":"Apache Energy had a subsea multilateral field development off Northwest Australia that required a sand control screen as part of their lower completion in order to control sand\nproduction from the targeted reservoirs.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011213_Apache.pdf","docCreatedDate":"2014-07-24T23:30:00.000-05:00","modifiedDate":"2014-07-24T23:30:00.000-05:00","docdate":"2014-07-24T23:30:00.000-05:00","docrefNum":"H011213","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reducing_Costs,Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,Production_Challenges:Completion_Integrity,|locations:Global,|prodgroups:Multilateral,Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions,"},{"title":"Combining Cement and Swell Technology Results in Effective Well Control and Reliable Zonal Isolation Behind Casing","description":"FIRST 13 5/8-IN. SWELLPACKER® SYSTEM INSTALLATION IN ASIA PACIFIC","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Swellpacker-Cement-Behind-Casing-Vietnam.PDF","docCreatedDate":"2016-08-10T23:30:00.000-05:00","modifiedDate":"2016-08-10T23:30:00.000-05:00","docdate":"2016-08-10T23:30:00.000-05:00","docrefNum":"H012223","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Halliburton Installs First VersaFlex Expandable Liner Hanger in Uzbekistan","description":"Gas-tight, liner-top isolation solution solves operator\u2019s gas migration challenges.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H013129-VersaFlexUzbekistan.pdf","docCreatedDate":"2019-02-08T09:51:00.000-06:00","modifiedDate":"2019-02-11T10:54:13.221-05:00","docdate":"2019-02-08T09:51:00.000-06:00","docrefNum":"H013129","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Annulus_Gas_Migration,|locations:Asia:Central_Asia:Uzbekistan_Central_Asia,|prodgroups:Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,Completion_Equipment_and_Services:Liner_Hangers,"},{"title":"Inflow Tech® Packer Enables Operator to Identify Liner-top Leaks in Long and Complex Big-Bore ERD Well","description":"Packer performs successfully in single trip, saving operator millions of dollars in blowout avoidance","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/inflow-tech-packer-enables-operator-to-identify-liner-top-H013064.pdf","docCreatedDate":"2018-10-31T10:25:00.000-05:00","modifiedDate":"2019-01-21T10:27:28.566-06:00","docdate":"2018-10-31T10:25:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Specialty_Tools-Wellbore_Cleaning,"},{"title":"EquiFlow® AICD deployment more than triples oil production for major operator in the Middle East","description":"A major operator in the Middle East had a water control issue in a heterogeneous, highly fractured carbonate reservoir. After it\nwas drilled and completed with electrical submersible pumps (ESPs) in early 2011, the well showed very high water production\nand fracture behavior with an initial water cut of approximately 65% against 880 bopd.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011957-AICD-ME.pdf","docCreatedDate":"2015-10-29T23:30:00.000-05:00","modifiedDate":"2016-09-30T23:30:00.000-05:00","docdate":"2015-10-29T23:30:00.000-05:00","docrefNum":"H011957","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Sand_Control:Screens:Inflow_Control,"},{"title":"CleanWell® Technology Debuts in Ghana, Delivers Several Successes","description":"Over 20 wellbore cleanouts performed without any issues with HSE, service quality, nonproductive time, or cost-of-poor-quality","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/CleanWell-Ghana-H012633.pdf","docCreatedDate":"2017-08-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2017-08-01T23:30:00.000-05:00","docrefNum":"H012633","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:HSEQ,Workflow_Integration:HalComplete:Deepwater_Completions,Environmental_Challenges:Deepwater-Environmental_Challenges,Production_Challenges:Improving_Oil_Recovery,Production_Challenges:Improve_Wellbore_Integrity,Production_Challenges:Completion_Integrity,Production_Challenges:Production_Optimization,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools,"},{"title":"TOTAL Exploration and Production Indonesia breaks the record with the shortest ESTMZ™ system installation time","description":"After months of working with TOTAL E&P Indonesie\u2019s reservoir, business development, and management teams, Halliburton personnel were able to prove the value and benefit \u2013 and low risk \u2013the ESTMZ™ system can provide their well.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H010783.pdf","docCreatedDate":"2013-12-02T22:30:00.000-06:00","modifiedDate":"2013-12-17T22:30:00.000-06:00","docdate":"2013-12-02T22:30:00.000-06:00","docrefNum":"H010783","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Production_Challenges:Improving_Oil_Recovery,Deepwater,Production_Challenges:Sand_Production,Production_Challenges:Production_Optimization,|locations:Global,|prodgroups:Sand_Control:Multizone_Sand_Control_Systems,"},{"title":"Swellpacker® System Enables Complete Zonal Isolation During Well Construction","description":"Isolation Solution Reduces Time and Risk for Operator ","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H09277-Australia-WellConstruction.pdf","docCreatedDate":"2018-12-31T12:59:00.000-06:00","modifiedDate":"2019-03-01T14:07:09.668-05:00","docdate":"2018-12-31T12:59:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,Oceania:Australia_Oceania,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Halliburton Installs First VersaFlex Big Bore System in Angola","description":"Liner hanger saves operator three days of remediation and eliminated NPT related to supplemental casing adaptors","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/VFBB-Angola.pdf","docCreatedDate":"2016-08-11T23:30:00.000-05:00","modifiedDate":"2016-08-16T23:30:00.000-05:00","docdate":"2016-08-11T23:30:00.000-05:00","docrefNum":"H012276","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,"},{"title":"Australia: FlexRite® Multilateral System Delivers Increased Reservoir Exposure with Reduced Capital and Operational Expenditures","description":"Apache Energy Ltd. in Western Australia wanted to increase reservoir exposure in an environmentally sensitive field while keeping the development footprint and disturbance to the seabed minimal.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H07241_Australia_FlexRite.pdf","docCreatedDate":"2009-11-06T22:30:00.000-06:00","modifiedDate":"2016-08-11T23:30:00.000-05:00","docdate":"2009-11-06T22:30:00.000-06:00","docrefNum":"H07241","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Improve_Reservoir_Drainage,|locations:Oceania:Australia_Oceania,Global,|prodgroups:Multilateral,Multilateral:Multilateral_Completion_Systems,Multilateral:Multilateral_Pre-milled_Window_Systems,Drilling,"},{"title":"Gulf of Mexico:Swellpacker® System Provides Isolation of Liner Top","description":"A major operator in the Gulf of Mexico needed\nto set a liner in a parent casing with a very small clearance. Halliburton was able to save the operator over $2 million","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H09488-GOM-CHS.pdf","docCreatedDate":"2016-10-04T23:30:00.000-05:00","modifiedDate":"2016-10-04T23:30:00.000-05:00","docdate":"2016-10-04T23:30:00.000-05:00","docrefNum":"H09488","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Zonal_isolation,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Integrated Operation Saves Operator Five Hours of Rig Time","description":"Single-trip solution brings efficiency","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/integrated-solution-5hr-rigtime-h013049.pdf","docCreatedDate":"2018-10-25T07:47:18.440-05:00","modifiedDate":"2018-10-25T07:47:18.440-05:00","docdate":"2018-10-25T07:47:18.440-05:00","docrefNum":"H013049","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools,"},{"title":"EquiFlow AICD Boosts Oil Production and Reduces Significant Water Production in Mature Oil Field","description":"First EquiFlow AICD completion proves successful in Oman","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/h013176-equiflowaicd.pdf","docCreatedDate":"2019-05-06T13:30:00.000-05:00","modifiedDate":"2019-05-06T14:59:19.066-04:00","docdate":"2019-05-06T13:30:00.000-05:00","docrefNum":"H013176","languageSet":["English"],"accessType":"P","dataSearch":"locations:Middle_East:Oman_Middle_East,|prodgroups:Sand_Control,Sand_Control:Screens,Sand_Control:Screens:Inflow_Control,"},{"title":"Single-Trip Multizone Cased-Hole Frac Packs and Intelligent Completions Improve Recovery in Subsea Gas Field","description":"Advanced Completion solution enables wells to remain fully functional after five years of production.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/h013056-estmz-ic.pdf","docCreatedDate":"2019-03-12T14:34:00.000-05:00","modifiedDate":"2019-03-12T15:39:50.261-04:00","docdate":"2019-03-12T14:34:00.000-05:00","docrefNum":"H013056 ","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Sand_Control:Multizone_Sand_Control_Systems,Reservoir_Testing_&_Analysis_(Reservoir_Testing_&_Sampling):Reservoir_Performance_Monitoring:Permanent_Downhole_Monitoring,Sand_Control:Downhole_Tools-Sand_Control:Tool_Systems-Sand_Control:Single-Trip_Multizone_Systems,Completion_Equipment_and_Services:Intelligent_Completions:Interval_Control-WellDynamics,"},{"title":"Innovative Elect® Frac Sleeve System Proves Successful for Demanding Well Conditions","description":"'First of a Kind' Sleeve System Enables Complex Completions and Minimizes Risk","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Elect-Sleeve-Rockcliff-H013267.pdf","docCreatedDate":"2019-05-15T14:15:00.000-05:00","modifiedDate":"2019-05-15T15:18:06.962-04:00","docdate":"2019-05-15T14:15:00.000-05:00","docrefNum":"H013267","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"Award-Winning Halliburton Technologies Combine to Provide Enhanced Wellbore Insight","description":"Unique Packer and Sleeve Solution Enables Record-Setting Success","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011248.pdf","docCreatedDate":"2018-07-02T23:30:00.000-05:00","modifiedDate":"2018-07-02T23:30:00.000-05:00","docdate":"2018-07-02T23:30:00.000-05:00","docrefNum":"H011248","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"RapidStart® Initiator CT sleeve delivers consistent results for operator","description":"A well operator in Wyoming planned to drill unconventional horizontal wells for multistage fracturing operations averaging approximately\n11,500 ft measured depth (MD) with a 7,000 ft total vertical depth (TVD). The wells were completed with a 4 ½-in. cemented production casing liner to isolate zones and to help ensure wellbore integrity, prior to plug and perf fracturing\noperations.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011821.pdf","docCreatedDate":"2015-06-16T23:30:00.000-05:00","modifiedDate":"2015-06-16T23:30:00.000-05:00","docdate":"2015-06-16T23:30:00.000-05:00","docrefNum":"H011821","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"Halliburton Installs 300th FlexRite® System, Including Over 100 FlexRite MIC Junctions, In North Sea","description":"The development of the FlexRite® MIC system enable more advanced multilateral completions.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/halliburton-installs-flexrite-system-in-north-sea.pdf","docCreatedDate":"2019-01-22T09:04:00.000-06:00","modifiedDate":"2019-01-23T09:12:39.431-06:00","docdate":"2019-01-22T09:04:00.000-06:00","docrefNum":"H013110","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Europe:Northern_Europe:Norway_Northern_Europe,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Multilateral:Multilateral_Completion_Systems,Completion_Equipment_and_Services,"},{"title":"RapidSuite® Multistage Fracturing Completion Systems Activate Almost Two Years after Installation","description":"100% zonal isolation achieved in 17 satges","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012481-Rapid-MiddleEast.pdf","docCreatedDate":"2017-03-06T22:30:00.000-06:00","modifiedDate":"2017-03-06T22:30:00.000-06:00","docdate":"2017-03-06T22:30:00.000-06:00","docrefNum":"H012481","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,Middle_East,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Halliburton provides more interventionless fracturing stages in ERD wells","description":"An independent oil and gas operator in the Bakken turned to Halliburton to provide a fracturing sleeve system suited for their ERD wells, while also allowing\nfor more possible fracturing stages than had\npreviously been possible.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011805-RapidBall-Rockies.pdf","docCreatedDate":"2015-06-03T23:30:00.000-05:00","modifiedDate":"2015-06-03T23:30:00.000-05:00","docdate":"2015-06-03T23:30:00.000-05:00","docrefNum":"H011805","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,Completion_Equipment_and_Services:Unconventional_Completions:Accessories-Horizontal_Completions,Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"CleanWell Systems shave seven hours of rig time for Asia Pacific operator","description":"An operator in the Philippines planned to batch complete two subsea deepwater wells. Due to the well design and remote location of the rigsite, every contingency needed to be\nconsidered.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H010792_CleanWell.pdf","docCreatedDate":"2017-04-19T23:30:00.000-05:00","modifiedDate":"2017-04-19T23:30:00.000-05:00","docdate":"2017-04-19T23:30:00.000-05:00","docrefNum":"H010792","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,Deepwater,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools,"},{"title":"12 Swellpacker® Systems Run Successfully in Long Horizontal Well with Severe Dog Legs","description":"Packers run to 5,700 meters inside the horizontal openhole section without any problems","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/12Swellpacker-dogleg-Norway.pdf","docCreatedDate":"2017-03-06T22:30:00.000-06:00","modifiedDate":"2017-03-06T22:30:00.000-06:00","docdate":"2017-03-06T22:30:00.000-06:00","docrefNum":"H012543","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Halliburton Enters Conventional Liner Hanger Market on Sinclair Well","description":"First MatchSet system is successfully installed in highly deviated horizontal application","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012801-MatchSet.pdf","docCreatedDate":"2018-01-25T22:30:00.000-06:00","modifiedDate":"2018-01-25T22:30:00.000-06:00","docdate":"2018-01-25T22:30:00.000-06:00","docrefNum":"H012801","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States,North_America:United_States:North_Dakota,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Liner_Hangers:Conventional_Liner_Hangers,"},{"title":"Illusion® Frac Plugs Save Time and Reduce Overall Completion Cost","description":"Halliburton mitigated concerns of reaching total depth in an extended-reach application ","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012411-Illusion-ND.pdf","docCreatedDate":"2016-12-21T22:30:00.000-06:00","modifiedDate":"2017-01-11T22:30:00.000-06:00","docdate":"2016-12-21T22:30:00.000-06:00","docrefNum":"H012411","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,"},{"title":"RapidStage® ME Sleeves Help Seneca Increase Efficiency in Extended Reach Laterals","description":"In Elk County Pennsylvania, Seneca\nResources was looking for ways to further improve\ncompletion efficiency, reduce cycle time, and eliminate drill out of their extended reach laterals. They also wanted to improve their average stage count per day.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011839-Seneca.pdf","docCreatedDate":"2016-02-29T22:30:00.000-06:00","modifiedDate":"2016-09-01T23:30:00.000-05:00","docdate":"2016-02-29T22:30:00.000-06:00","docrefNum":"H011839","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Accessories-Horizontal_Completions,Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,"},{"title":"Record-Setting Lateral Completion Achieved with Obsidian® Plugs","description":"Halliburton and Eclipse Resources set 124 frac plugs averaging 5.3 frac stages per day","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Eclipse-Purple-Hayes.pdf","docCreatedDate":"2016-09-27T23:30:00.000-05:00","modifiedDate":"2016-10-03T23:30:00.000-05:00","docdate":"2016-09-27T23:30:00.000-05:00","docrefNum":"h012292","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Plugs-Service_Tools,Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Plugs-Service_Tools:Frac_Plugs,"},{"title":"Illusion® Plug Saves Operator Approximately USD $515,000","description":"Interventionless Solution Allows Multiple Wells to be Placed on Production After Stimulation ","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Argentina-Illusion-515K-H012966.pdf","docCreatedDate":"2018-06-18T23:30:00.000-05:00","modifiedDate":"2018-06-18T23:30:00.000-05:00","docdate":"2018-06-18T23:30:00.000-05:00","docrefNum":"H012966","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,"},{"title":"Illusion® Dissolvable Frac Plugs Enable Extended Laterals ","description":"Extended-Reach Lateral Solution Allows Operator to Gain Greater Access to Reservoir","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/ARG-Illusion-Extended-Reach-H013017.pdf","docCreatedDate":"2018-08-17T23:30:00.000-05:00","modifiedDate":"2018-08-17T23:30:00.000-05:00","docdate":"2018-08-17T23:30:00.000-05:00","docrefNum":"H013017","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,"},{"title":"VersaFlex System Successfully Runs To Depth Without Internal Fluids in a Shallow Extended-Reach Well","description":"First-ever 'floated-in' liner installation in complex wellbore saves operator time and money","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H012397-VersaFlex-Williston.pdf","docCreatedDate":"2017-02-09T22:30:00.000-06:00","modifiedDate":"2017-02-09T22:30:00.000-06:00","docdate":"2017-02-09T22:30:00.000-06:00","docrefNum":"H012397","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Extended_Reach_Drilling_(ERD),|locations:Global,|prodgroups:Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,"},{"title":"Latin America: Use of Swellpacker® Systems Achieves High Production","description":"Effective use of Swellpacker® systems achieves high production, saves time and reduces costs for Mexico operator","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H07608.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2013-11-20T22:30:00.000-06:00","docdate":"2013-11-01T23:30:00.000-05:00","docrefNum":"H07608","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Zonal_isolation,|locations:Central_America,South_America,Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Swellable Packer Solves Casing Challenge, Successfully Sealing and Anchoring Tieback Liner ","description":"Swellpacker® System Seals and Sustains 113 Tons of Force ","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/Swellpacker-System-Anchoring-Tieback-H06750.pdf","docCreatedDate":"2018-08-08T23:30:00.000-05:00","modifiedDate":"2018-08-08T23:30:00.000-05:00","docdate":"2018-08-08T23:30:00.000-05:00","docrefNum":"H06750","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Halliburton successfully performs single-trip post-perforation cleanout and deburr run for water injector well","description":"A major operator in Canada planned to install Halliburton\u2019s intelligent completion technology for a water injector well. Halliburton was also tasked to perform the post-perforation cleanout and deburr run in a single trip.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011986-Canada.pdf","docCreatedDate":"2015-10-29T23:30:00.000-05:00","modifiedDate":"2016-03-02T22:30:00.000-06:00","docdate":"2015-10-29T23:30:00.000-05:00","docrefNum":"H011986","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Riser_Cleanout_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Debris_Extraction_Tools,"},{"title":"RapidStart® Initiator CT Sleeves Achieve 100 Percent Sucess Rate, Saving USD 100,000 Per Well","description":"Permian Operator Completes a Full Casing Pressure Test Prior to the Frac Job and Without Intervention","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/RSI-CT-100K-Permian-Basin-H012648.pdf","docCreatedDate":"2017-09-13T23:30:00.000-05:00","modifiedDate":"2017-09-13T23:30:00.000-05:00","docdate":"2017-09-13T23:30:00.000-05:00","docrefNum":"H012648","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Pressure,Production_Challenges:Production_Optimization,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"Australia: New Multilateral Window Exit Technology from Halliburton Reduces Installation Time and Helps Operator Save an Estimated $3.3 Million","description":"An operator developing a deepwater field off the Australian NW Shelf required a minimal subsea infrastructure with tight lateral spacing in an environmentally sensitive area.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011424-Australia-FlexRite.pdf","docCreatedDate":"2014-12-12T22:30:00.000-06:00","modifiedDate":"2016-08-11T23:30:00.000-05:00","docdate":"2014-12-12T22:30:00.000-06:00","docrefNum":"H011424","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Improve_Reservoir_Drainage,Fluids_Challenges:Heavy_Oil,Production_Challenges:Unconventional_Resources,|locations:Global,Oceania:Australia_Oceania,|prodgroups:Multilateral:Multilateral_Pre-milled_Window_Systems,Multilateral:Multilateral_Completion_Systems,Multilateral,Drilling,"},{"title":"First Single-Trip Multizone (STMZ™) Gravel Pack Installation","description":"Petronas Carigali Vietnam Limited (PCVL) needed to complete four wells with two or three zones per well that required gravel pack and reduce rig time to minimize the time-to-completion of each well for a sand control project in Vietnam.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H010863_STMZ_Gravel_Pack.pdf","docCreatedDate":"2014-01-07T22:30:00.000-06:00","modifiedDate":"2014-01-07T22:30:00.000-06:00","docdate":"2014-01-07T22:30:00.000-06:00","docrefNum":"H010863","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Improving_Oil_Recovery,Reservoir_Challenges:Improve_Reservoir_Productivity,Production_Challenges:Sand_Production,Production_Challenges:Improving_Flood_Sweep_Efficiency,|locations:Global,|prodgroups:Sand_Control:Multizone_Sand_Control_Systems,"},{"title":"Permian Basin Operator Saves Time and Money with Enhanced Plug and Perforate Method","description":"An independent oil and gas operator in the area\nwas using the plug and perforate method to complete their well, but wanted to find a way to improve on the efficiency of the operation. By immediately pressure testing each frac plug prior to perforating the target fracturing stages, the operator could eliminate the risk of the fracturing plug not\nholding pressure and causing a loss of isolation during stimulation.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011708-RapidBall-Permian.pdf","docCreatedDate":"2015-06-03T23:30:00.000-05:00","modifiedDate":"2015-06-03T23:30:00.000-05:00","docdate":"2015-06-03T23:30:00.000-05:00","docrefNum":"H011708","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Drillable_Tools:Dissolvable_Tools,Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,Completion_Equipment_and_Services:Unconventional_Completions:Accessories-Horizontal_Completions,"},{"title":"First RapidStage® completions system deployed in the Eagle Ford Shale saves customer $1 Million","description":"Halliburton customized a unique completion solution for multi-zone interventionless stimulation ","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H07303_rapidstage_eagleford.pdf","docCreatedDate":"2017-01-11T22:30:00.000-06:00","modifiedDate":"2017-05-10T23:30:00.000-05:00","docdate":"2017-01-11T22:30:00.000-06:00","docrefNum":"H07303","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,North_America,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"Single-Trip Cleanout and Displacement for Deepwater Pre-Salt Well","description":"While drilling a pre-salt offshore deepwater appraisal well in Brazil, a major operator found\nthat the well needed a robust and efficient single-trip wellbore cleanout system. Due to\nanticipated well challenges during the completion, they needed to find a system that was\ncapable of drilling cement, shoetrack, and reaming while still providing an effective wellbore\ncleanout trip.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011892-Cleanwell.pdf","docCreatedDate":"2015-08-27T23:30:00.000-05:00","modifiedDate":"2015-08-27T23:30:00.000-05:00","docdate":"2015-08-27T23:30:00.000-05:00","docrefNum":"H011892","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools,"},{"title":"ESTMZ™ System Helps Operator Avoid Fluid Loss in Complex Multizone Completion","description":"Stacked system isolates intervals and increases completion efficiency, saving USD 20 million","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H013342-ESTMZ-Stacked.pdf","docCreatedDate":"2019-08-15T13:01:00.000-05:00","modifiedDate":"2019-08-15T15:04:42.236-04:00","docdate":"2019-08-15T13:01:00.000-05:00","docrefNum":"H013342","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Sand_Control:Multizone_Sand_Control_Systems,Sand_Control:Downhole_Tools-Sand_Control:Tool_Systems-Sand_Control:Single-Trip_Multizone_Systems,Sand_Control:Downhole_Tools-Sand_Control:Tool_Systems-Sand_Control,"},{"title":"FS2 Fluid Loss Isolation Barrier Valves Contribute to Successful Completion on Deepwater Project","description":"Halliburton helps optimize operating efficiency and run reliability","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/FS2-Nigeria-Total-H012686.pdf","docCreatedDate":"2017-10-19T23:30:00.000-05:00","modifiedDate":"2017-10-19T23:30:00.000-05:00","docdate":"2017-10-19T23:30:00.000-05:00","docrefNum":"H012686","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Workflow_Integration:HalComplete:Deepwater_Completions,Production_Challenges:Horizontal_Completions,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Isolation_Barrier_Valves,"},{"title":"Norway: Shallow Gas Isolation - Exploration Well","description":"Shallow gas was\nexperienced during pilot hole drilling of a subsea exploration\nwell in the North Sea. The operator chose to use\nSwell Technology™ systems combined with the conventional\ncementing methods.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H08255.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2013-11-26T22:30:00.000-06:00","docdate":"2013-11-01T23:30:00.000-05:00","docrefNum":"H08255","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Zonal_isolation,|locations:Global,Europe,|prodgroups:Wireline_and_Perforating:Casing_and_Cement,Completion_Equipment_and_Services:Swell_Technology,Cementing:Cementing_Products_and_Processes:Cementing_Systems_and_Services,Cementing:Cementing_Solutions,Cementing:Cementing_Products_and_Processes,"},{"title":"Halliburton Installs World\u2019s First 9 5/8-inch Multibranch Inflow Control System in North Sea","description":"New TAML Level 5 FlexRite MIC system enables more possibilities for advanced multilateral completions","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H013318-FlexRiteMIC.pdf","docCreatedDate":"2019-07-30T12:41:00.000-05:00","modifiedDate":"2019-07-30T13:46:39.326-04:00","docdate":"2019-07-30T12:41:00.000-05:00","docrefNum":"H013318","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Reservoir_Challenges:Mature_Fields,|locations:Oceans_Gulfs_International_Waters:North_Sea,Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Multilateral:Multilateral_Completion_Systems,"},{"title":"PowerMag® magnets recover debris at a ratio greater than 3:1 over competition","description":"For a major operator in the GoM, Halliburton won its first opportunity to perform a deepwater displacement.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011896-PowerMag.pdf","docCreatedDate":"2015-11-05T22:30:00.000-06:00","modifiedDate":"2015-12-01T22:30:00.000-06:00","docdate":"2015-11-05T22:30:00.000-06:00","docrefNum":"H011896","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Debris_Extraction_Tools,"},{"title":"Swellpacker® system is used as an anchor to provide torque for liner hanger running tool","description":"A major customer operating in the Norwegian\nContinental Shelf planned to utilize a traditional\ncompletion method on their well. The method\nrequired 4 ½-in. tubing hanging inside the\n7-in. parent liner with a screen section in the\n6-in. hole.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011860-Emergency-Release.pdf","docCreatedDate":"2015-10-02T23:30:00.000-05:00","modifiedDate":"2015-10-02T23:30:00.000-05:00","docdate":"2015-10-02T23:30:00.000-05:00","docrefNum":"H011860","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Swell_Technology,"},{"title":"Drilling Fluids Helps Save Over Three Days of Rig Time in Mature Field","description":"Igapo Achieves Record Drilling Performance with BOREMAX High-Performance Freshwater Fluid","path":"/content/dam/ps/public/project_management/contents/Case_Histories/H013234-IGAPO-Project-Case-Study-FINAL-NO-BLEED.pdf","docCreatedDate":"2019-09-09T08:56:00.000-05:00","modifiedDate":"2019-09-13T11:27:18.697-04:00","docdate":"2019-09-09T08:56:00.000-05:00","docrefNum":"H013234","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:Global,South_America:Ecuador_Western_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"Successful Drilling of an Exploratory Well 30 Days Ahead of Schedule","description":"Drilled the deepest exploratory well in the basin.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/successful-drilling-of-an-exploratory-well.pdf","docCreatedDate":"2017-12-31T22:30:00.000-06:00","modifiedDate":"2018-01-11T22:30:00.000-06:00","docdate":"2017-12-31T22:30:00.000-06:00","docrefNum":"H012773","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:North_America:Mexico,|prodgroups:Project_Management:Integrated_Projects:Integrated_Well_Construction,"},{"title":"In War Zone, Boots & Coots Fights Infamous Kuwaiti Oilfield Fires of 1991 with Abrasive Jet Cutting System","description":"Innovative Technology Helps Boots & Coots Extinguish Oil Fires in One of the Worst Oilfield Disasters in History","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-coots-extinguish-oil-fires.pdf","docCreatedDate":"2016-09-23T23:30:00.000-05:00","modifiedDate":"2016-10-11T23:30:00.000-05:00","docdate":"2016-09-23T23:30:00.000-05:00","docrefNum":"H012298","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges,|brandgroups:Boots_&_Coots,|locations:Middle_East:Kuwait_Middle_East,|prodgroups:Pressure_Control:Well_Control,Pressure_Control:Prevention,Pressure_Control:Well_Control_Engineering,"},{"title":"Halliburton Team Optimizes Drilling Performance in Ecuador\u2019s MDC and Inchi Fields","description":"Halliburton Project Management (HPM) in Ecuador collaborated with an operator to drill a vertical exploratory well in Ecuador\u2019s Intracampos fields \u2013 specifically in the area\u2019s Inchi and Mauro Davalos Cordero (MDC) fields.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/halliburton-optimizes-drilling-performance-in-ecuador.pdf","docCreatedDate":"2018-01-18T22:30:00.000-06:00","modifiedDate":"2018-03-02T22:30:00.000-06:00","docdate":"2018-01-18T22:30:00.000-06:00","docrefNum":"H012772","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reduce_Nonproductive_Time,|locations:South_America:Ecuador_Western_South_America,|prodgroups:Project_Management:Integrated_Projects:Integrated_Well_Construction,"},{"title":"Integrated Well Intervention Project Successfully Completes First Dual-Annuli Heavy Cement Remediation","description":"In the early 1980s, an operator offshore Brunei had a well drilled and completed with sustained \u201cB\u201d annulus pressure up to","path":"/content/dam/ps/public/project_management/contents/Case_Histories/integrated-well-intervention-successfully-completes.pdf","docCreatedDate":"2019-02-01T13:57:00.000-06:00","modifiedDate":"2019-02-01T14:00:32.509-06:00","docdate":"2019-02-01T13:57:00.000-06:00","docrefNum":"H013106","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Asia:Southeastern_Asia:Brunei_Southeastern_Asia,|prodgroups:Project_Management:Integrated_Service_Levels:Integrated_Project_Management,"},{"title":"Integrated Well Intervention Solution Reduces Offshore P&A Costs By Over 50 Percent","description":"Through close collaboration with the customer, Halliburton took an active part in the development of the overall P&A strategy for the project, analyzing the needs for downhole tool conveyance and focusing on solutions requiring minimum topside equipment. ","path":"/content/dam/ps/public/project_management/contents/Case_Histories/integrated-well-intervention-reduces-offshore-plug-and-abandonment.pdf","docCreatedDate":"2017-12-17T22:30:00.000-06:00","modifiedDate":"2018-03-15T23:30:00.000-05:00","docdate":"2017-12-17T22:30:00.000-06:00","docrefNum":"H012771","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Abandonment,|locations:Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Project_Management:Integrated_Projects:Integrated_Well_Intervention,"},{"title":"Forming an ice barrier to secure access and recover fish from frac stack","description":"Boots & Coots Special Services Team Provides Barriers to Control and Gain Access to Well.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/H011431-TotalArgentinaFreeze.pdf","docCreatedDate":"2015-07-13T23:30:00.000-05:00","modifiedDate":"2015-07-13T23:30:00.000-05:00","docdate":"2015-07-13T23:30:00.000-05:00","docrefNum":"H011431","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Boots_&_Coots,|locations:Global,|prodgroups:Pressure_Control:Well_Special_Services:Freeze_Services,"},{"title":"Boots & Coots Team Controls a Geothermal Well Blowout","description":"Using an innovative method of debris control, the Boots & Coots team successfully regained control of the well, and the customer was able to continue with the drilling operation.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-and-coots-team-controls-geothermal-well-blowout-new-zealand.pdf","docCreatedDate":"2017-06-09T23:30:00.000-05:00","modifiedDate":"2017-06-09T23:30:00.000-05:00","docdate":"2017-06-09T23:30:00.000-05:00","docrefNum":"H012524","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges,|locations:Oceania:New_Zealand_Oceania,|prodgroups:Pressure_Control:Well_Control,Pressure_Control:Well_Control_Engineering,"},{"title":"Boots & Coots Successfully Kills Leaking Well in Remote Field","description":"Team solves challenging logistics to stop gas leak prior to well abandonment","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-coots-successfully-kills-leaking-well.pdf","docCreatedDate":"2016-11-04T23:30:00.000-05:00","modifiedDate":"2016-11-04T23:30:00.000-05:00","docdate":"2016-11-04T23:30:00.000-05:00","docrefNum":"H012378","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges,|locations:South_America:Bolivia_Central_South_America,|prodgroups:Pressure_Control:Well_Control,Pressure_Control:Well_Control_Engineering,"},{"title":"Boots & Coots Regains Control of Well After Blowout Occurs During Workover Operation","description":"The Boots & Coots well control team was mobilized to the location to assess the situation and assist the operator on the response plan and operation. The team initially inspected and assessed the conditions of the barge and well. Gas was flowing into the lake bed and then to the water surface where it had caught fire.","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-and-coots-regains-control-of-well-after-blowout.pdf","docCreatedDate":"2018-02-18T22:30:00.000-06:00","modifiedDate":"2018-03-01T22:30:00.000-06:00","docdate":"2018-02-18T22:30:00.000-06:00","docrefNum":"H012775","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Well_Control_Challenges,|locations:South_America,|prodgroups:Pressure_Control:Well_Control_Engineering,Pressure_Control:Well_Control,"},{"title":"Boots & Coots Drills Relief Well for Shallow Target to Kill Catastrophic Blowout","description":"Multidisciplinary response resolves crisis in first attempt","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-coots-drills-relief-well.pdf","docCreatedDate":"2016-10-24T23:30:00.000-05:00","modifiedDate":"2016-10-24T23:30:00.000-05:00","docdate":"2016-10-24T23:30:00.000-05:00","docrefNum":"H012364","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure,Environmental_Challenges:Pressure,|locations:Asia:Southeastern_Asia:Indonesia_Southeastern_Asia,|prodgroups:Pressure_Control:Well_Control,Pressure_Control:Well_Control_Engineering,"},{"title":"Boots & Coots Safely Kills Six-Well, Single-Pad Blowout","description":"Team Solves Major Well-Control Challenge Never Seen Before in the Industry","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-coots-safely-kills-six-well.pdf","docCreatedDate":"2016-09-23T23:30:00.000-05:00","modifiedDate":"2016-10-11T23:30:00.000-05:00","docdate":"2016-09-23T23:30:00.000-05:00","docrefNum":"H012296","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges,|locations:North_America:United_States:Wyoming,|prodgroups:Pressure_Control:Well_Control,Pressure_Control:Prevention,Pressure_Control:Well_Control_Engineering,"},{"title":"Boots & Coots Mobilizes WELLSURE® Blowout Response Process After Client\u2019s Well Suffers Major Blowout","description":"Well control specialists successfully kill well, saving operator millions of dollars","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-coots-wellsure-blowout-response.pdf","docCreatedDate":"2016-10-27T23:30:00.000-05:00","modifiedDate":"2016-10-27T23:30:00.000-05:00","docdate":"2016-10-27T23:30:00.000-05:00","docrefNum":"H012372","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges,|brandgroups:Boots_&_Coots,|locations:North_America:United_States:Mississippi,|prodgroups:Pressure_Control:Well_Control,"},{"title":"Boots & Coots Rapidly Intercepts Blowout in Argentina","description":"Active Magnetic Ranging Techniques Prevail Over Passive Approach to Accurately Locate Target Well","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-coots-rapidly-intercepts-blowout.pdf","docCreatedDate":"2016-09-23T23:30:00.000-05:00","modifiedDate":"2016-10-11T23:30:00.000-05:00","docdate":"2016-09-23T23:30:00.000-05:00","docrefNum":"H012297","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges,|brandgroups:Boots_&_Coots,|locations:South_America:Argentina_Southern_South_America,|prodgroups:Pressure_Control:Well_Control_Engineering,Pressure_Control:Prevention,Pressure_Control:Well_Control,"},{"title":"Boots & Coots Regains Control of Platform After Five-Well Blowout","description":"Team maintains stability of 30-well platform, contains blowouts, and safety caps wells","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-coots-regains-platform-five-well-blowout.pdf","docCreatedDate":"2016-11-04T23:30:00.000-05:00","modifiedDate":"2016-11-04T23:30:00.000-05:00","docdate":"2016-11-04T23:30:00.000-05:00","docrefNum":"H012377","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges,|locations:Oceans_Gulfs_International_Waters:Caspian_Sea,|prodgroups:Pressure_Control:Well_Control,Pressure_Control:Well_Control_Engineering,"},{"title":"In 1924, Myron Kinley Kick-Starts the Well Control Industry with a Bang","description":"Most well control methods and technologies used\ntoday trace their roots back to one man: Myron Kinley","path":"/content/dam/ps/public/project_management/contents/Case_Histories/myron-kinley-kick-starts-well-control.pdf","docCreatedDate":"2018-06-01T23:30:00.000-05:00","modifiedDate":"2018-07-11T23:30:00.000-05:00","docdate":"2018-06-01T23:30:00.000-05:00","docrefNum":"H012526","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pressure_Control:Well_Control,"},{"title":"Boots & Coots Regains Control of Well After Underground Blowout and Surface Broach","description":"Suite of Logging tools helps determine detailed\nsource control response plan","path":"/content/dam/ps/public/project_management/contents/Case_Histories/boots-coots-regains-control-underground-blowout.pdf","docCreatedDate":"2016-11-04T23:30:00.000-05:00","modifiedDate":"2016-11-04T23:30:00.000-05:00","docdate":"2016-11-04T23:30:00.000-05:00","docrefNum":"H012379","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges,|locations:South_America,|prodgroups:Pressure_Control:Well_Control,Pressure_Control:Well_Control_Engineering,"},{"title":"GOM: Rotary Steerable System and Industry\u2019s Closest At-Bit Reamer Save Operator 48 Hours and USD 2 Million","description":"While drilling on a deepwater rig in the Gulf of Mexico with a water depth of about 8,000 feet (2,438 meters), an operator encountered significant losses in a weak zone due to depleted sands near the bottom of this section of the well.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/GeoPilot-at-bit-reamer-GOM-Rathole.pdf","docCreatedDate":"2017-10-02T03:00:00.000-05:00","modifiedDate":"2017-10-02T23:30:00.000-05:00","docdate":"2017-10-02T03:00:00.000-05:00","docrefNum":"H012605","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,Deepwater,Reduce_Nonproductive_Time,|brandgroups:Drill_Bits_&_Services,Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Directional_Drilling,Drilling,Hole_Enlargement,Directional_Drilling:Rotary_Steerables,"},{"title":"Operator Drills Gulf of Thailand\u2019s Longest Openhole Production Section...","description":"Quasar Trio® M/LWD Triple-Combo Service reduces well time in extreme-temperature well","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/quasar-trio-helps-operator-drill-longest-openhole-production-section-in-thailand.pdf","docCreatedDate":"2018-11-01T10:47:00.000-05:00","modifiedDate":"2018-11-02T10:50:40.008-05:00","docdate":"2018-11-01T10:47:00.000-05:00","docrefNum":"H012985","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia:Thailand_Southeastern_Asia,|prodgroups:MWD,LWD,"},{"title":"Gulf of Mexico Geo-Pilot® Dirigo 11K RSS delivers higher torque capabilities in large hole sections of deepwater well","description":"In this deepwater Gulf of Mexico well, three large hole sections were planned with the secondand third intervals penetrating a massive salt section, which would require excellent torqueand steering management.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/HO11763-gom-geopilot-xl.pdf","docCreatedDate":"2015-05-13T03:00:00.000-05:00","modifiedDate":"2015-05-13T23:30:00.000-05:00","docdate":"2015-05-13T03:00:00.000-05:00","docrefNum":"H011763","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalDrill:Drilling_Performance,Drilling_Challenges:Deepwater_Drilling,Deepwater,Drilling_Challenges:Improving_Drilling_Efficiency,|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Drilling,Directional_Drilling:Rotary_Steerables,"},{"title":"Operator Significantly Enhances Reservoir Insight from 3D Inversion","description":"EarthStar™ ultra-deep resistivity service combined with unique, industry-leading 3D inversion sheds new light on mature reservoir.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/EarthStar-3D-1.pdf","docCreatedDate":"2019-06-19T13:11:00.000-05:00","modifiedDate":"2019-06-19T14:13:34.057-04:00","docdate":"2019-06-19T13:11:00.000-05:00","docrefNum":"H013295","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Sperry_Drilling_Services,|locations:Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:LWD:Resistivity_Logging-LWD,Geosteering,"},{"title":"North Sea: Operator Avoids Drilling Hazards and Maximizes Reservoir Exposure","description":"EarthStar™ ultra-deep resistivity service delivers additional producible reserves.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/EarthStar-Geomapping-NorthSea.pdf","docCreatedDate":"2019-07-26T15:43:00.000-05:00","modifiedDate":"2019-07-26T16:44:29.497-04:00","docdate":"2019-07-26T15:43:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Drilling,LWD:Resistivity_Logging-LWD,"},{"title":"Gulf of Mexico: New Approach Enables Operator to Determine Successful Completion Operation","description":"In a deepwater (water depth over 4,000 ft (1,219 m)) Gulf of Mexico subsalt wellbore, an operator sought to run its completion string in a very challenging environment. The upper borehole section had undesired tortuosity and high dogleg severity that had caused operational difficulties in the past.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/DrillDOC-GOM-CompletionsConfidence.pdf","docCreatedDate":"2017-01-09T02:00:00.000-06:00","modifiedDate":"2017-01-09T22:30:00.000-06:00","docdate":"2017-01-09T02:00:00.000-06:00","docrefNum":"H012433","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Hydraulics_Management,Workflow_Integration:HalComplete:Deepwater_Completions,Drilling_Challenges:Deepwater_Drilling,Deepwater,|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Optimization_Services,Optimization_Services:Drilling_Optimization,Drilling,Optimization_Services:Drilling_Optimization:Drillstring_Integrity,"},{"title":"Congo: First Use of Electromagnetic Telemetry in Offshore Environment Optimizes Drilling Operations and Saves Time","description":"An operator wanted to use an aphron-based mud system to help prevent fluid losses while drilling in a depleted, low-pressure reservoir. Acquiring data using conventional positive or negative mud pulse measurement-while-drilling (MWD) tools would have been difficult or impossible.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H07580_Congo_EM.pdf","docCreatedDate":"2010-04-13T03:00:00.000-05:00","modifiedDate":"2010-04-13T23:30:00.000-05:00","docdate":"2010-04-13T03:00:00.000-05:00","docrefNum":"H07580","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Heavy_Oil,|brandgroups:Sperry_Drilling_Services,|locations:Africa,Africa:Central_Africa,Africa:Central_Africa:Congo_Democratic_Republic_of_the_Central_Africa,|prodgroups:Drilling,Drilling:Telemetry,"},{"title":"Thailand: SOLAR® M/LWD Services Used on Thousands of High-Temperature Wells in the Gulf of Thailand","description":"SOLAR® M/LWD Services Used on Thousands of High-Temperature Wells in the Gulf of Thailand","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H06828.pdf","docCreatedDate":"2009-04-24T23:30:00.000-05:00","modifiedDate":"2009-04-24T23:30:00.000-05:00","docdate":"2009-04-24T23:30:00.000-05:00","docrefNum":"H06828","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Temperature,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia,Asia,Asia:Southeastern_Asia:Thailand_Southeastern_Asia,Asia:Eastern_Asia,Asia:Eastern_Asia:China_Eastern_Asia,|prodgroups:MWD,Drilling,LWD,"},{"title":"Oman: Operator Locates Top of Fish Target with ABI™ Sensor","description":"An operator working in a mature field in Oman attempted to drill a deviated well, but, while drilling the 8½-in. (215.9-mm) buildup section, the bottomhole assembly (BHA) became stuck for approximately a month.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/ABI-Oman-FishTarget.pdf","docCreatedDate":"2015-10-06T03:00:00.000-05:00","modifiedDate":"2015-10-06T23:30:00.000-05:00","docdate":"2015-10-06T03:00:00.000-05:00","docrefNum":"H011951","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Drilling_Challenges:Precise_Well_Placement,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Wellbore_Trajectory,|locations:Middle_East,Middle_East:Oman_Middle_East,|prodgroups:MWD:Wellbore_Surveying-MWD,MWD,Drilling,"},{"title":"Operator Obtains Reliable Reservoir Measurements and Reduces Well Time, Saving USD 1 Million","description":"GeoTap® sensor 10K PSI drawdown capability acquires accurate and precise formation pressure data in real time.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/GeoTap-Azerbaijan.pdf","docCreatedDate":"2019-10-10T14:58:00.000-05:00","modifiedDate":"2019-10-10T16:00:29.769-04:00","docdate":"2019-10-10T14:58:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southwestern_Asia:Azerbaijan_Southwestern_Asia,|prodgroups:LWD:Testing_and_Sampling-LWD,"},{"title":"Kazakhstan: Sperry Geo-Pilot Rotary Steerable System Helps Deliver Customer's Deepest, Fastest Well in Karachaganak","description":"Delivered using the Geo-Pilot system to provide verticality withoutcompromising ROP, both wells set new field records, with well 9822 finishing 14 days ahead of schedule, and well 9828 achieving a field-record depth as well as finishing 15 days ahead of objective.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H08383_Kazakhstan_GP.pdf","docCreatedDate":"2011-04-05T03:00:00.000-05:00","modifiedDate":"2011-04-05T23:30:00.000-05:00","docdate":"2011-04-05T03:00:00.000-05:00","docrefNum":"H08383","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Central_Asia,Asia:Central_Asia:Kazakhstan_Central_Asia,Asia,|prodgroups:Drilling,Directional_Drilling,Directional_Drilling:Rotary_Steerables,"},{"title":"Operator Drills Country's Longest Lateral and Deepest Well in Unconventional Field","description":"iCruise® intelligent rotary steerable system helps reach total depth and place well 100 percent in-zone in Vaca Muerta reservoir.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/iCruise-RSS-Argentina.pdf","docCreatedDate":"2019-03-15T16:43:00.000-05:00","modifiedDate":"2019-06-04T17:44:55.103-04:00","docdate":"2019-03-15T16:43:00.000-05:00","docrefNum":"H013160","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Sperry_Drilling_Services,|locations:South_America:Argentina_Southern_South_America,|prodgroups:Directional_Drilling:Rotary_Steerables,"},{"title":"Operator Identifies Bypassed Pay and Increases Pay Zone by 50% in Water-flooded Reservoir","description":"Earthstar™ Ultra-Deep Resistivity Service Maximizes Asset Value in Mature Carbonate Field","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/earthStar-geosteering.pdf","docCreatedDate":"2018-12-05T13:01:00.000-06:00","modifiedDate":"2018-12-05T13:02:51.050-06:00","docdate":"2018-12-05T13:01:00.000-06:00","docrefNum":"H012961","languageSet":["English"],"accessType":"P","dataSearch":"locations:Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:LWD:Resistivity_Logging-LWD,Formation_Evaluation:Resistivity_Logging,Geosteering,"},{"title":"Brunei: ADT® Optimization Service Helps Ensure Critical Hole Cleaning, Cuts NPT in Long ERD Well","description":"In order to deliver their production requirements for the year, an operator needed to successfully drill and case a 20,000-foot (6,096-meter) extended reach well located offshore Brunei in 108 feet (33 meters) of water. Because hole cleaning is always a challenge in Extended Reach Drilling (ERD) wells, the operator sought risk management support related to hole cleaning and friction factor monitoring that would ensure the well reached planned target depth (TD).","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H011145_Brunei_ADT.pdf","docCreatedDate":"2014-06-04T03:00:00.000-05:00","modifiedDate":"2014-06-04T23:30:00.000-05:00","docdate":"2014-06-04T03:00:00.000-05:00","docrefNum":"H011145","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Extended_Reach_Drilling_(ERD),|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia,Asia:Southeastern_Asia:Brunei_Southeastern_Asia,Asia,|prodgroups:Optimization_Services,Optimization_Services:Drilling_Optimization,Drilling,Drilling:Drilling_Engineering_Solutions,"},{"title":"Oman: GeoForce® Motor Saves Operator 7.5 Drilling Days with Fewest Number of Bit Runs in History of Field","description":"An operator in Oman had been using two different bottomhole assemblies (BHAs) to drill a 12-1/4-inch vertical section for unconventional wells.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/GeoForce-Oman-VerticalDrilling.pdf","docCreatedDate":"2017-01-11T02:00:00.000-06:00","modifiedDate":"2017-01-11T22:30:00.000-06:00","docdate":"2017-01-11T02:00:00.000-06:00","docrefNum":"H012435","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Salt_Challenges:High_Vibration_and_Shock,Production_Challenges:Unconventional_Resources,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Wellbore_Trajectory,Drilling_Challenges:Precise_Well_Placement,Reduce_Nonproductive_Time,|brandgroups:Sperry_Drilling_Services,|locations:Middle_East,Middle_East:Oman_Middle_East,|prodgroups:Directional_Drilling:Downhole_Drilling_Motors,Directional_Drilling,Drilling,Directional_Drilling:Directional_Drilling_Software,"},{"title":"Brazil: Turbopower™ Turbodrill Delivers Field Record ROP in Pre-Salt Carbonates and Saves Three Days of Rig Time","description":"In spite of the poor drillability of the challenging formation, the Sperry Turbopower turbine delivered the fastest ROP in the pre-salt of this field, drilling the 8-1/2-inch hole 348 meters to total depth in 79.55 hours, achieving a field record ROP of 4.4 m/hr and saving the operator three days of rig time.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H09904_Brazil_Turbopower.pdf","docCreatedDate":"2012-12-14T02:00:00.000-06:00","modifiedDate":"2012-12-14T22:30:00.000-06:00","docdate":"2012-12-14T02:00:00.000-06:00","docrefNum":"H09904","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Deepwater,|brandgroups:Sperry_Drilling_Services,|locations:Global,South_America:Brazil_Eastern_South_America,|prodgroups:Directional_Drilling:Turbines:Turbopower_Turbodrilling,Directional_Drilling:Turbines,Directional_Drilling,Drilling,"},{"title":"North Sea: Geo-Pilot® GXT Rotary Steerable System Helps Double ROP","description":"In a gas condensate development well in the UK central North Sea, an operator needed to drill through the hard Upper Cretaceous Chalk Group of formations with the highest rate of penetration (ROP) possible while performing constant directional work.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H08214_UK_Geo-Pilot_GXT.pdf","docCreatedDate":"2014-06-02T23:30:00.000-05:00","modifiedDate":"2011-01-12T22:30:00.000-06:00","docdate":"2014-06-02T23:30:00.000-05:00","docrefNum":"H08214","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Sperry_Drilling_Services,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Directional_Drilling,Drilling,Directional_Drilling:Rotary_Steerables,"},{"title":"Venezuela: Petroindependencia Drills the Longest ERD Well While Staying 100 Percent in Target Zone","description":"Petroindependencia, a Petróleos de Venezuela S.A. (PDVSA) joint venture, operates in the Orinoco oil belt, where the target reservoirs are located in the Morichal member of the Oficina formation, which can be characterized as a shallow, unconsolidated formation.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/GeoPilotDirigo-Venezuela-ShallowSoftERD.pdf","docCreatedDate":"2017-06-30T03:00:00.000-05:00","modifiedDate":"2017-07-05T23:30:00.000-05:00","docdate":"2017-06-30T03:00:00.000-05:00","docrefNum":"H012574","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Drilling_Challenges:Extended_Reach_Drilling_(ERD),Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Planning:Wellbore_Trajectory_Design,Drilling_Challenges:Precise_Well_Placement,Formation_Challenges:Unconsolidated_Formations,|brandgroups:Sperry_Drilling_Services,|locations:South_America,South_America:Venezuela_Northern_South_America,|prodgroups:MWD:Wellbore_Surveying-MWD,Directional_Drilling,MWD,Drilling,Directional_Drilling:Rotary_Steerables,Drilling:Telemetry,"},{"title":"Venezuela: With 107 Percent Increase in ROP, Operator Saves Seven Days with Turbopower™ Drilling","description":"Operating in a well containing highly abrasive sandstone, the operator\u2019s primary objective was to drill vertically through an approximately 1,100-ft (335-m) production section in two runs, with one trip out to surface planned for replacing the bit.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/Turbopower-Venezuela-Abrasive.pdf","docCreatedDate":"2016-05-10T03:00:00.000-05:00","modifiedDate":"2016-05-16T23:30:00.000-05:00","docdate":"2016-05-10T03:00:00.000-05:00","docrefNum":"H012187","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reducing_Costs,Formation_Challenges:Sandstone_Formations,Drilling_Challenges:Increased_ROP,Reduce_Nonproductive_Time,|brandgroups:Sperry_Drilling_Services,|locations:South_America,South_America:Venezuela_Northern_South_America,|prodgroups:Directional_Drilling:Turbines:Turbopower_Turbodrilling,Directional_Drilling:Turbines,Directional_Drilling,Drilling,"},{"title":"United Kingdom: Active Performance Benchmarking with Halliburton's MaxActivity™ Analysis Tool Facilitates Step-Change Performance for Operator and Saves $20 Million","description":"The operator needed to improve well delivery and achieve top quartile (TQ)performance by identifying gaps and driving opportunities.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H08530_UK_MaxActivity.pdf","docCreatedDate":"2011-07-08T03:00:00.000-05:00","modifiedDate":"2011-07-08T23:30:00.000-05:00","docdate":"2011-07-08T03:00:00.000-05:00","docrefNum":"H08530","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Optimize_Drilling_Conditions,|brandgroups:Sperry_Drilling_Services,|locations:Europe,Europe:Western_Europe:United_Kingdom_Western_Europe,Europe:Western_Europe,|prodgroups:Optimization_Services,Optimization_Services:Drilling_Optimization_Software,Optimization_Services:Drilling_Optimization,Directional_Drilling:Directional_Drilling_Software,Drilling,"},{"title":"Papua New Guinea: AFR™ Sensor Helps Major Operator Isolate Problematic Shale Formation, Saving Valuable Rig Time","description":"In the Antelope field, Total needed to accurately pick the 9-5/8-inch casing point in the uppermost portion of a fractured carbonate reservoir above a total loss transition zone, while being able to isolate the reactive and over-pressurized shale above the reservoir.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/AFR-ABR-PNG-Geostopping.pdf","docCreatedDate":"2017-01-06T02:00:00.000-06:00","modifiedDate":"2017-01-06T22:30:00.000-06:00","docdate":"2017-01-06T02:00:00.000-06:00","docrefNum":"H01224","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,Reservoir_Challenges:Mature_Fields,Reservoir_Challenges:Lost_Circulation-Reservoir_Challenges,Environmental_Challenges:Overbalanced,Formation_Challenges:Shale,Well_Control_Challenges:Lost_Circulation,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia:Papua_New_Guinea_Southeastern_Asia,Asia:Southeastern_Asia,Asia,|prodgroups:LWD:Resistivity_Logging-LWD,Geosteering,Drilling,LWD,"},{"title":"South East Asia: Quasar Pulse℠ M/LWD service saves customer approximately USD 1 Million","description":"An operator wanted to reduce costs and achieve logging objectives on high-temperature wells drilled from a jack up rig in 243 feet (74 meters) of water, offshore South East Asia, where bottomhole temperatures are among the highest in the world.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/Quasar-Pulse-Asia-HT.pdf","docCreatedDate":"2015-03-18T03:00:00.000-05:00","modifiedDate":"2015-03-18T23:30:00.000-05:00","docdate":"2015-03-18T03:00:00.000-05:00","docrefNum":"H011277","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Temperature:Ultra_Temperature_(400F),Reservoir_Challenges:High_Temperature,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia,|prodgroups:Drilling,MWD,LWD,"},{"title":"Oklahoma, USA: Geo-Pilot® GXT System and DrillDOC® Tool Help Improve Drilling Performance in Shale Reservoir","description":"An operator in Oklahoma recently saved three days of drilling time by using a drilling solution provided by Sperry Drilling comprised of a Geo-Pilot® GXT rotary steerable system and a DrillDOC® drilling optimization tool.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H010213_USA_GPGXT_DrillDOC.pdf","docCreatedDate":"2013-07-09T03:00:00.000-05:00","modifiedDate":"2013-07-09T23:30:00.000-05:00","docdate":"2013-07-09T03:00:00.000-05:00","docrefNum":"H010213","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Shale,|brandgroups:Sperry_Drilling_Services,|locations:Global,North_America:United_States,|prodgroups:Formation_Evaluation:Vibration_Monitoring-Formation_Evaluation,Optimization_Services,Optimization_Services:Drilling_Optimization,Drilling,Directional_Drilling,Directional_Drilling:Rotary_Steerables,"},{"title":"U.K. Offshore: Operator Saves Significant Rig Time by Gathering Complete Formation Evaluation Data in Real Time","description":"In an offshore U.K. well, an operator needed to obtain a complete formation evaluation (FE) data set to measure reservoir and overburden characteristics in a deviated well.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/MLWD-Penta-Combo-UKOffshore-RT-FE-Data.pdf","docCreatedDate":"2016-11-15T02:00:00.000-06:00","modifiedDate":"2016-11-15T22:30:00.000-06:00","docdate":"2016-11-15T02:00:00.000-06:00","docrefNum":"H012370","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reducing_Costs,Deepwater:Reduce_Uncertainty,Reduce_Nonproductive_Time,|brandgroups:Sperry_Drilling_Services,|locations:Europe,Europe:Western_Europe:United_Kingdom_Western_Europe,Europe:Western_Europe,|prodgroups:LWD:Rock_Mechanics-LWD,Directional_Drilling,MWD,LWD,Directional_Drilling:Rotary_Steerables,LWD:Resistivity_Logging-LWD,LWD:Neutron_Logging-LWD,MWD:Wellbore_Pressure_Monitoring-MWD,LWD:Density_Logging-LWD,LWD:Testing_and_Sampling-LWD,Drilling,LWD:Gamma_Logging-LWD,"},{"title":"Middle East: Operator Validates Real-Time Magnetic Resonance Porosities in Carbonate Reservoir","description":"4-3/4-in MRIL®-WD™ LWD sensor delivers T1 data to enhance reservoir understanding of a mature field.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/mril-wd-middle-east1.pdf","docCreatedDate":"2019-05-08T13:08:00.000-05:00","modifiedDate":"2019-05-08T14:09:58.192-04:00","docdate":"2019-05-08T13:08:00.000-05:00","docrefNum":"H013021","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Sperry_Drilling_Services,|locations:Middle_East,|prodgroups:LWD:Nuclear_Magnetic_Resonance-LWD,"},{"title":"Oman: Operator Proves Cost Savings With LWD High-Resolution Imaging Service","description":"Borehole imaging is one of the most rapidly advancing technologies in wireline logging and logging while drilling (LWD). In an onshore horizontal well in Oman, an operator needed more details of the geology in the reservoir in order to gain a better understanding of the distribution of faults, natural fractures, borehole breakouts, and drilling-induced fractures along the well path.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/AFR-Oman-RealTimeImaging.pdf","docCreatedDate":"2017-03-21T03:00:00.000-05:00","modifiedDate":"2017-03-21T23:30:00.000-05:00","docdate":"2017-03-21T03:00:00.000-05:00","docrefNum":"H012502","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Deepwater:Reduce_Uncertainty,Reducing_Costs,Formation_Challenges:Low_Permeability_Formations,|locations:Middle_East,Middle_East:Oman_Middle_East,|prodgroups:LWD:Rock_Mechanics-LWD,LWD:Borehole_Imaging-LWD,LWD,LWD:Resistivity_Logging-LWD,LWD:Neutron_Logging-LWD,LWD:Density_Logging-LWD,LWD:Gamma_Logging-LWD,Drilling,"},{"title":"North Sea, Norway: Operator Successfully Runs 5 ¾-inch Slim-Hole Drilling Operation with Geo-Pilot® RSS System","description":"In a mature field on the Norwegian Continental Shelf of the North Sea, an operator had attempted twice to drill a new extended-reach drilling (ERD) wellbore with a 2.05 measured depth (MD) to true vertical depth (TVD) ratio that resulted in the bottomhole assembly (BHA) becoming lost in hole above the reservoir.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/GeoPilot-Norway-First575Run.pdf","docCreatedDate":"2017-03-22T03:00:00.000-05:00","modifiedDate":"2017-06-02T23:30:00.000-05:00","docdate":"2017-03-22T03:00:00.000-05:00","docrefNum":"H012515","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Drilling_Challenges:Extended_Reach_Drilling_(ERD),|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters,Oceans_Gulfs_International_Waters:North_Sea,Europe,Europe:Northern_Europe,Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Directional_Drilling:Rotary_Steerables,LWD:Neutron_Logging-LWD,LWD:Gamma_Logging-LWD,Geosteering,Directional_Drilling,MWD,LWD,LWD:Resistivity_Logging-LWD,MWD:Wellbore_Pressure_Monitoring-MWD,LWD:Density_Logging-LWD,LWD:Testing_and_Sampling-LWD,Drilling,Drilling:Drilling_Engineering_Solutions,"},{"title":"3D Geosteering Enhances Reservoir Understanding in Complex Stratigraphic Environment","description":"The Sperry Drilling \u201cdrill-to-produce\u201d solution enabled the operator to accurately placethe well in the sweet spot and extend the lateral section for maximum reservoir contact.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/3D-GeoSteering-Solution-Ecuador.pdf","docCreatedDate":"2018-05-15T23:30:00.000-05:00","modifiedDate":"2018-02-26T22:30:00.000-06:00","docdate":"2018-05-15T23:30:00.000-05:00","docrefNum":"H012646","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Sperry_Drilling_Services,|locations:South_America:Ecuador_Western_South_America,|prodgroups:Geosteering,Drilling:Drilling_Engineering_Solutions,LWD,Directional_Drilling:Rotary_Steerables,"},{"title":"World's First Extreme-High-Temperature LWD Triple-Combo Run","description":"With extreme bottomhole static temperatures approaching 392°F (200°C), some of the wells in the Gulf of Thailand are among the hottest in the world \u2013 far beyond the reach of conventional measurement-while-drilling/logging-while-drilling(M/LWD) tools.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/quasar-trio-triple-combo-run-thailand.pdf","docCreatedDate":"2016-05-17T23:30:00.000-05:00","modifiedDate":"2018-02-08T22:30:00.000-06:00","docdate":"2016-05-17T23:30:00.000-05:00","docrefNum":"H012188","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Temperature:Ultra_Temperature_(400F),Reservoir_Challenges:High_Temperature,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia:Thailand_Southeastern_Asia,Asia:Southeastern_Asia,Asia,|prodgroups:LWD,MWD:Wellbore_Pressure_Monitoring-MWD,LWD:Neutron_Logging-LWD,LWD:High_Pressure_High_Temperature-LWD,LWD:Gamma_Logging-LWD,LWD:Density_Logging-LWD,Drilling,MWD,"},{"title":"Operator Maximizes Lateral Well Contact in Complex Mid-Continent Reservoir","description":"iCruise® intelligent rotary steerable system places well accurately in zone.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/icruise.pdf","docCreatedDate":"2019-02-12T07:54:00.000-06:00","modifiedDate":"2019-02-25T08:57:53.936-05:00","docdate":"2019-02-12T07:54:00.000-06:00","docrefNum":"H013079","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Sperry_Drilling_Services,|locations:North_America:United_States:Oklahoma,|prodgroups:Directional_Drilling,"},{"title":"USA, Oklahoma: Turbopower™ Turbodrills Deliver High Build-Rate Curve and Lateral through Abrasive Grante Wash","description":"In this well, the operator challenged Sperry Drilling services to provide a solution that would achieve the necessary build rate in the curve to land the well at proper depth, and drill the lateral section with minimal directional corrections \u2013 drilling both sections as fast as possible while delivering good hole quality.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H011515-USA-Turbopower.pdf","docCreatedDate":"2014-11-27T02:00:00.000-06:00","modifiedDate":"2014-11-27T22:30:00.000-06:00","docdate":"2014-11-27T02:00:00.000-06:00","docrefNum":"H011515","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Sperry_Drilling_Services,|locations:North_America:United_States:Oklahoma,North_America,North_America:United_States,|prodgroups:Directional_Drilling:Turbines,Drilling,Directional_Drilling,"},{"title":"Engineered Solution Maximizes Drilling in Pre-Salt Carbonate Formation, Saving USD 833,000","description":"The Turbopower turbodrill used in conjunction with the TurboForce diamond-impregnated bit drilled 948 feet (289 meters) in just 93.2 drilling hours, achieving an ROP of 10.2 feet/hour (3.1 meters/hour).","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/TurboPower-TurboForce-Brazil.pdf","docCreatedDate":"2018-05-15T23:30:00.000-05:00","modifiedDate":"2018-02-27T22:30:00.000-06:00","docdate":"2018-05-15T23:30:00.000-05:00","docrefNum":"H012698","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Sperry_Drilling_Services,|locations:South_America:Brazil_Eastern_South_America,|prodgroups:Directional_Drilling:Turbines,Drill_Bits,"},{"title":"Middle East: Operator Uses Real-Time Magnetic Resonance to Assess Rock Quality in Clastic Formations","description":"43\u20444-IN. MRIL®-WD™ LWD sensor delivers T1 data to enhance reservoir understanding of a mature field.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/mril-wd-middle-east3.pdf","docCreatedDate":"2019-05-08T13:15:00.000-05:00","modifiedDate":"2019-05-08T14:17:15.051-04:00","docdate":"2019-05-08T13:15:00.000-05:00","docrefNum":"H013020","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Sperry_Drilling_Services,|locations:Middle_East,|prodgroups:LWD:Nuclear_Magnetic_Resonance-LWD,"},{"title":"Alaska, USA: Pioneer Natural Resources Uses Active Magnetic Ranging to Avoid Risk ofWellbore Collision","description":"The Oooguruk project, three miles off the coast of Alaska\u2019s North Slope, is a six-acre island built by Pioneer Natural Resources Co. to enable drilling operations in the Arctic Ocean.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H06436.pdf","docCreatedDate":"2008-09-01T03:00:00.000-05:00","modifiedDate":"2008-10-06T23:30:00.000-05:00","docdate":"2008-09-01T03:00:00.000-05:00","docrefNum":"H06436","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,|brandgroups:Sperry_Drilling_Services,|locations:North_America,North_America:United_States:Alaska,North_America:United_States,|prodgroups:Drilling:Magnetic_Ranging,Drilling:Magnetic_Ranging:Active_Ranging,Drilling,Drilling:Telemetry,"},{"title":"Azerbaijan: Operator Achieves Record-Breaking Telemetry Rates Despite Challenging Environment","description":"JetPulse™ high-data-rate (HDR) telemetry enables operator to anticipate and react to potential problems before significant nonproductive time (NPT) can occur","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/JetPulse-Azerbaijan-FastRTData.pdf","docCreatedDate":"2017-01-17T02:00:00.000-06:00","modifiedDate":"2017-03-01T22:30:00.000-06:00","docdate":"2017-01-17T02:00:00.000-06:00","docrefNum":"H012458","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Deepwater:Reduce_Uncertainty,Production_Challenges:Unconventional_Resources,Deepwater:Increase_Reliability,Borehole_Challenges:Borehole_Stability,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southwestern_Asia:Azerbaijan_Southwestern_Asia,Asia:Southwestern_Asia,Asia,|prodgroups:Drilling:Telemetry,"},{"title":"Brazil: Operator Saves USD 3.4 Million in Presalt Drilling","description":"In Brazil\u2019s presalt deepwater reservoirs, being able to accurately drill to the well plan at water depths of over 7,000 feet (2,134 meters) is difficult because of the long and complex salt sections present before reaching the hydrocarbons.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/Geo-Pilot-Duro-Brazil-PreSaltDrilling.pdf","docCreatedDate":"2017-08-21T03:00:00.000-05:00","modifiedDate":"2017-09-19T23:30:00.000-05:00","docdate":"2017-08-21T03:00:00.000-05:00","docrefNum":"H012661","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Salt_Challenges,Deepwater:Increase_Reliability,Drilling_Challenges:Stuck_Pipe,Deepwater:Reduce_Uncertainty,Salt_Challenges:High_Vibration_and_Shock,Salt_Challenges:Drilling_Optimization_through_salt,Drilling_Challenges:Drill_String_Torque_Drag_Reduction,Reduce_Nonproductive_Time,|brandgroups:Sperry_Drilling_Services,|locations:South_America,South_America:Brazil_Eastern_South_America,|prodgroups:Optimization_Services,Optimization_Services:Drilling_Optimization,Drilling,Directional_Drilling,Directional_Drilling:Rotary_Steerables,"},{"title":"USA, North Dakota: Planning, Collaboration and an Optimized Drilling Performance Deliver Record-Breaking Extended Reach Unconventionals Wells in Bakken/Three Forks","description":"An operator's objective was to drill two extended reach wells, followed by drilling three more wells with 50 percent longer laterals","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H011715-DrillDoc-NorthBakken-DD.pdf","docCreatedDate":"2015-04-16T03:00:00.000-05:00","modifiedDate":"2015-04-16T23:30:00.000-05:00","docdate":"2015-04-16T03:00:00.000-05:00","docrefNum":"H011715","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Drilling_Challenges:Extended_Reach_Drilling_(ERD),|brandgroups:Sperry_Drilling_Services,|locations:North_America:United_States:North_Dakota,North_America:United_States,North_America,|prodgroups:Formation_Evaluation:Vibration_Monitoring-Formation_Evaluation,Drilling,Optimization_Services:Drilling_Optimization,"},{"title":"ONGC Reaches TD in Hard and Abrasive Formation 32 Days Ahead of Plan","description":"Sperry Drilling sets new drilling record with Turbopwer™ Turbodrills and matched custom bit engineered solution. ","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/Turbopower-ONGC-India.pdf","docCreatedDate":"2018-05-15T23:30:00.000-05:00","modifiedDate":"2018-03-30T23:30:00.000-05:00","docdate":"2018-05-15T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southern_Asia:India_Southern_Asia,|prodgroups:Directional_Drilling:Turbines,"},{"title":"North Sea: Successful Dual Drilling Operations Saves Aker BP USD 1.2 Million with Zero HSE Issues","description":"Three simultaneous dual drilling operations ","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/AkerBP-Dual-Drilling-Norway.pdf","docCreatedDate":"2019-09-04T16:22:00.000-05:00","modifiedDate":"2019-09-04T17:24:27.805-04:00","docdate":"2019-09-04T16:22:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:LWD,"},{"title":"Marcellus Shale, USA: SperryDrill® XL Motor Drills First Single-Run 8 ½-Inch Hole Sections in Marcellus Shale Wells","description":"In this unconventional shale gas play, the operator wanted to minimize Authorization for Expenditure (AFE) and drive better economics by eliminating costly trips and additional equipment associated with multiple runs. In order to accomplish this, the operator challenged Sperry Drilling services to deliver a new well architecture, featuring a lengthy low-angle tangent to create displacement without sacrificing valuable lateral in zone.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H011135_MarcellusShale_SperryDrillXL.pdf","docCreatedDate":"2014-06-10T03:00:00.000-05:00","modifiedDate":"2014-06-10T23:30:00.000-05:00","docdate":"2014-06-10T03:00:00.000-05:00","docrefNum":"H011135","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Sperry_Drilling_Services,|locations:Global,North_America:United_States,|prodgroups:Drilling,Directional_Drilling,Directional_Drilling:Downhole_Drilling_Motors,"},{"title":"British Columbia, Canada: LaserStrat® Service Helps Double Production","description":"Devon Canada was drilling shallow horizontal gas wells and needed a cost-effective solution that could reliably geosteer in the limestone reservoir interval. ","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H05816_Canada_LaserStrat.pdf","docCreatedDate":"2009-10-05T03:00:00.000-05:00","modifiedDate":"2012-07-19T23:30:00.000-05:00","docdate":"2009-10-05T03:00:00.000-05:00","docrefNum":"H05816","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,|brandgroups:Sperry_Drilling_Services,|locations:North_America:Canada:British_Columbia,North_America:Canada,North_America,|prodgroups:Surface_Data_Logging,Drilling,Surface_Data_Logging:Elemental_Analysis-Surface_Data_Logging,"},{"title":"Malaysia / GOM / Norway: GeoTap®/Geo-Pilot® Malaysia/GOM/Norway Solution Profile","description":"Three case histories: 1. GeoTap Formation Tester Allows TorqueReduction While Dramatically Improving ROP2. GeoTap® Slimhole LWD Formation Tester and Geo-Pilot® Rotary SteerableSystem Get Pressure Answers In High-Risk Sidetrack3. GeoTap® Tester Increases Reservoir Section and Adds $13 Million of New Oil Production","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H05813_Malaysia_GOM_Norway_GT_GP.pdf","docCreatedDate":"2007-10-01T03:00:00.000-05:00","modifiedDate":"2012-07-19T23:30:00.000-05:00","docdate":"2007-10-01T03:00:00.000-05:00","docrefNum":"H05813","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Formation_Pore_Pressure,|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters,Asia,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,Europe:Northern_Europe:Norway_Northern_Europe,Asia:Southeastern_Asia,Europe,Europe:Northern_Europe,Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,|prodgroups:Optimization_Services:Drilling_Optimization:Matched_System,Directional_Drilling,LWD:Borehole_Imaging-LWD,LWD,Directional_Drilling:Rotary_Steerables,LWD:Density_Logging-LWD,LWD:Testing_and_Sampling-LWD,Drilling,"},{"title":"Innovative Magnetic Ranging Solution Saves Over USD 200,000 on Complex P&A Project","description":"Sperry Drilling was selected to accurately steer a sidetrack well, providing precisemeasurement of distance and direction to the casing of the target well.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/WellSpot-PMR-Paris.pdf","docCreatedDate":"2018-05-15T23:30:00.000-05:00","modifiedDate":"2018-02-27T22:30:00.000-06:00","docdate":"2018-05-15T23:30:00.000-05:00","docrefNum":"H012682","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Sperry_Drilling_Services,|locations:Europe:Western_Europe:France_Western_Europe,|prodgroups:Drilling:Magnetic_Ranging:Passive_Ranging,Drilling:Magnetic_Ranging,"},{"title":"Gulf of Mexico: New LWD Density Service Saves Operator USD 1 Million","description":"During a subsalt deepwater project (water depth of over 5,200 ft (1,585 m)) in the Gulf of Mexico, an operator faced significant uncertainties in the geological model below a salt section. In this area, it is often difficult to acquire good-quality seismic images due to attenuation of seismic signals by the overlying salt formations.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/ALD-GOM-LargeHoleSaltImages.pdf","docCreatedDate":"2017-01-09T02:00:00.000-06:00","modifiedDate":"2017-01-09T22:30:00.000-06:00","docdate":"2017-01-09T02:00:00.000-06:00","docrefNum":"H012341","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater:Reduce_Uncertainty,Deepwater:Reduce_Uncertainty:Reservoir_Characterization,Salt_Challenges,Exploration_&_Seismic_Challenges,|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Geosteering,LWD:Density_Logging-LWD,Drilling,LWD,"},{"title":"TOTAL S.A. Drills to Record Depths in HP/HT Well and Saves USD 5 Million","description":"Engineered MWD/LWD solution delivers reliable measurements in extreme temperature environment","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/QuasarTripTOTAL.pdf","docCreatedDate":"2018-05-15T23:30:00.000-05:00","modifiedDate":"2018-03-19T23:30:00.000-05:00","docdate":"2018-05-15T23:30:00.000-05:00","docrefNum":"H012826","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure,Reservoir_Challenges:High_Temperature,|brandgroups:Sperry_Drilling_Services,|locations:Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:MWD,LWD,"},{"title":"USA, Alaska: Geo-Pilot® Rotary Steerable Systems Help Deliver Extended Reach Well 8.3 Days Ahead of Schedule","description":"Drill an extended reach well targeting a section of reservoir originally designed to be reached from a drilling pad yet to be constructed.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H07593_Alaska_GP_ERD.pdf","docCreatedDate":"2010-04-02T03:00:00.000-05:00","modifiedDate":"2010-04-13T23:30:00.000-05:00","docdate":"2010-04-02T03:00:00.000-05:00","docrefNum":"H07593","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Extended_Reach_Drilling_(ERD),|brandgroups:Sperry_Drilling_Services,|locations:North_America,North_America:United_States:Alaska,North_America:United_States,|prodgroups:Directional_Drilling,LWD,Directional_Drilling:Rotary_Steerables,Optimization_Services,Optimization_Services:Drilling_Optimization,LWD:Testing_and_Sampling-LWD,Drilling,"},{"title":"Indonesia: Operator saves 61 hours and USD $500,000 with Geo-Pilot® XL RSS Combined with Underreamer","description":"In a wellbore section that was notoriously difficult to drill, anoperator needed a solution to drill the 4,921-foot (1,500-meter) 12½-inch section of an offshore Indonesia well in one run while building up to a 50° inclination.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/Geo-Pilot-UnderReamer-Indonesia-DrillingPerformance.pdf","docCreatedDate":"2017-08-21T03:00:00.000-05:00","modifiedDate":"2017-08-21T23:30:00.000-05:00","docdate":"2017-08-21T03:00:00.000-05:00","docrefNum":"H012606","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,Drilling_Challenges:Increased_ROP,Fluids_Challenges:ROP_Enhancement,Reduce_Nonproductive_Time,|locations:Asia:Southeastern_Asia,Asia:Southeastern_Asia:Indonesia_Southeastern_Asia,Asia,|prodgroups:Directional_Drilling,Drilling,Directional_Drilling:Rotary_Steerables,"},{"title":"Mexico: Operator Saves Time USD 7.5 Million in Deepwater Rig Time by Acquiring Crucial Formation Evaluation Data in Real Time","description":"An operator on a deepwater well had recently issued an internal mandate seeking opportunities to reduce the authorizations for expenditure (AFEs) associated with drilling its oil and gas exploration and development projects.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/GeoTap-IDS-MRIL-WD-Mexico-FullFE.pdf","docCreatedDate":"2016-11-01T03:00:00.000-05:00","modifiedDate":"2016-11-01T23:30:00.000-05:00","docdate":"2016-11-01T03:00:00.000-05:00","docrefNum":"H012369","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater:Reduce_Uncertainty,Reducing_Costs,Reserve-Resource_Calculation_and_Formation_Evaluation,Drilling_Challenges:Deepwater_Drilling,Deepwater,Reduce_Nonproductive_Time,|brandgroups:Sperry_Drilling_Services,|locations:North_America,North_America:Mexico,|prodgroups:LWD:Rock_Mechanics-LWD,LWD,LWD:Nuclear_Magnetic_Resonance-LWD,LWD:Resistivity_Logging-LWD,LWD:Neutron_Logging-LWD,LWD:Density_Logging-LWD,LWD:Testing_and_Sampling-LWD,Drilling,LWD:Gamma_Logging-LWD,"},{"title":"Middle East: T1 Data Helps Operator Resolve Pore Size Variation in Complex Carbonate Formation","description":"43\u20444-IN. MRIL®-WD™ LWD senspr delivers T1 data for optimum well placement in a mature field.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/mril-wd-middle-east2.pdf","docCreatedDate":"2019-05-08T13:12:00.000-05:00","modifiedDate":"2019-05-08T14:13:37.901-04:00","docdate":"2019-05-08T13:12:00.000-05:00","docrefNum":"H013022","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Sperry_Drilling_Services,|locations:Middle_East,|prodgroups:LWD:Nuclear_Magnetic_Resonance-LWD,"},{"title":"Malaysia: Optimized Drilling Solution Key in Guiding Record-Length Horizontal Hole to Difficult Target","description":"The primary challenge in this well was drilling a transition zone while remaining eight meters (26 feet) above the oil/water contact (OWC) and five meters (16.5 feet) below OWC.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/H07990_Malaysia_ADR.pdf","docCreatedDate":"2010-10-19T03:00:00.000-05:00","modifiedDate":"2010-10-19T23:30:00.000-05:00","docdate":"2010-10-19T03:00:00.000-05:00","docrefNum":"H07990","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia,Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,Asia,|prodgroups:Optimization_Services:Drilling_Optimization:Matched_System,Geosteering,Directional_Drilling,LWD:Borehole_Imaging-LWD,LWD,Directional_Drilling:Rotary_Steerables,LWD:Resistivity_Logging-LWD,Drilling,"},{"title":"Petroboscan Obtains Real-Time Formation Pressure Data and Extends Production in a Mature Field","description":"Sperry Drilling collaborated with the operator and providedreservoir insight and LWD expertise on reliable formationpressure measurement capabilities using its GeoTap® LWD formation tester service.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/GeoTap-Venezuela.pdf","docCreatedDate":"2018-05-15T23:30:00.000-05:00","modifiedDate":"2018-02-27T22:30:00.000-06:00","docdate":"2018-05-15T23:30:00.000-05:00","docrefNum":"H012694","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|brandgroups:Sperry_Drilling_Services,|locations:South_America:Venezuela_Northern_South_America,|prodgroups:LWD,"},{"title":"Operator Maximizes Asset Value in Extreme-High-Temperature Wells","description":"Quasar Trio® M/LWD Triple-Combo service reduces well time in 24-slot platform operation.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/Quasar-Trio-Thailand.pdf","docCreatedDate":"2018-08-13T23:30:00.000-05:00","modifiedDate":"2018-08-13T23:30:00.000-05:00","docdate":"2018-08-13T23:30:00.000-05:00","docrefNum":"H012952","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Reservoir_Challenges:High_Temperature:High_Temperature_(300F),|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia:Thailand_Southeastern_Asia,|prodgroups:MWD,LWD,"},{"title":"USA, North Dakota Bakken: Operator Achieves More Accurate Wellbore Placement Using a New Azimuthal Gamma Ray Service","description":"An operator in North Dakota\u2019s Middle Bakken shale formation sought a solution that would enable effective drilling and geosteering in a formation with little gamma ray variation, while minimizing drilling costs.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/Radian-NDBakken-StratigraphyInsight.pdf","docCreatedDate":"2017-01-26T02:00:00.000-06:00","modifiedDate":"2018-06-05T23:30:00.000-05:00","docdate":"2017-01-26T02:00:00.000-06:00","docrefNum":"H012434","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Deepwater:Reduce_Uncertainty,Drilling_Challenges:Precise_Well_Placement,|brandgroups:Sperry_Drilling_Services,|locations:North_America:United_States:North_Dakota,North_America,North_America:United_States,|prodgroups:Geosteering,MWD:Wellbore_Surveying-MWD,MWD,Drilling,LWD:Gamma_Logging-LWD,LWD,"},{"title":"USA, Southern: Operator Reduces Wellbore Position Uncertainty and Avoids Potential Costly Sidetracks for a Blowout Relief Well","description":"While conducting operations on an unconventional relief well fora blowout in a field in the southern part of the USA, an operator observed a discrepancy in the well position after analyzing the data from two separate surveys in the same wellbore.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/SurveyManagement-USA-SagCorrection.pdf","docCreatedDate":"2017-07-25T03:00:00.000-05:00","modifiedDate":"2017-07-25T23:30:00.000-05:00","docdate":"2017-07-25T03:00:00.000-05:00","docrefNum":"H012581","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater:Reduce_Uncertainty,Drilling_Challenges:Precise_Well_Placement,|brandgroups:Sperry_Drilling_Services,|locations:North_America,North_America:United_States,|prodgroups:Drilling:Magnetic_Ranging,Drilling:Magnetic_Ranging:Active_Ranging,Directional_Drilling,MWD,Directional_Drilling:Directional_Drilling_Software,Optimization_Services:Drilling_Optimization:Directional_Survey_Management,MWD:Wellbore_Surveying-MWD,Drilling,"},{"title":"Valve Saves Twelve Hours of Rig Time in First Subsea Operation","description":"The Halliburton eRED® intelligent downhole equalizing device had been previously used successfully in several platform operations for BP in the UK and Norwegian sectors. This particular operation, however, was the first in a subsea application.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H010520.pdf","docCreatedDate":"2016-01-19T22:30:00.000-06:00","modifiedDate":"2016-02-10T22:30:00.000-06:00","docdate":"2016-01-19T22:30:00.000-06:00","docrefNum":"H010520","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"Auto-Gas Lift: SmartWell® System Collaboration Driving Success in Indonesia","description":"Collaboration was the key to success for a recent project in Jakarta, Indonesia, when two key Halliburton technologies helped a customer successfully complete its well and prompted significant interest in SmartWell® completion systems throughout Indonesia and the Asia Pacific Region. \n","path":"/content/dam/ps/public/wd/contents/Case_Histories/H07913.pdf","docCreatedDate":"2015-10-13T23:30:00.000-05:00","modifiedDate":"2015-10-13T23:30:00.000-05:00","publishDate":"2018-10-02T11:28:10.513-05:00","docdate":"2015-10-13T23:30:00.000-05:00","docrefNum":"H07913","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intelligent_Completions:Interval_Control-WellDynamics,"},{"title":"Flexibility of eRED® Valve Aids Success of Acid Stimulation Operation","description":"An operator was looking for a reliable method of selectively perforating and acid stimulating two independent zones.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H010516.pdf","docCreatedDate":"2017-08-30T23:30:00.000-05:00","modifiedDate":"2017-08-30T23:30:00.000-05:00","docdate":"2017-08-30T23:30:00.000-05:00","docrefNum":"H010516","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"eRED® Valve Saves Six Hours Rig-Time for BP","description":"eRED® Valve Saves 6 hours Rig-time for BP","path":"/content/dam/ps/public/wd/contents/Case_Histories/H010438_eRED-Case-History.pdf","docCreatedDate":"2016-02-10T22:30:00.000-06:00","modifiedDate":"2016-02-10T22:30:00.000-06:00","docdate":"2016-02-10T22:30:00.000-06:00","docrefNum":"H010438","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"Intelligent Completion in System Provides Operator Solutions in the Remote Niger Delta","description":"The Nigerian subsidiary of an international oil company wanted to pilot test intelligent completion technology in one of the largest fields in the western swamp area. However, the\nremoteness and the peculiar operating environment in the Niger Delta made installation of surface equipment required to operate/communicate with the downhole intelligent\ncompletion equipment a challenge.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011882.pdf","docCreatedDate":"2015-10-02T23:30:00.000-05:00","modifiedDate":"2015-10-02T23:30:00.000-05:00","publishDate":"2018-10-02T11:28:15.585-05:00","docdate":"2015-10-02T23:30:00.000-05:00","docrefNum":"H011882","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intelligent_Completions:Surface_Control_and_Monitoring_Systems-WellDynamics,Completion_Equipment_and_Services:Intelligent_Completions:Zonal_Isolation-WellDynamics,Completion_Equipment_and_Services:Intelligent_Completions:Interval_Control-WellDynamics,Completion_Equipment_and_Services:Permanent_Monitoring-WellDynamics,"},{"title":"eRED® Valve Replaces Ball-Drop Method to Set Hydraulic Packer","description":"Chevron had previously experienced some\nchallenges when dropping a ball to set a hydraulic packer on another well. Faced with a\nsimilar situation on a highly deviated well with a long horizontal section, Chevron recognized\nthe potential for issues when they needed to set the packer.","path":"/content/dam/ps/public/wd/contents/Case_Histories/eRED-Valve-Replaces-Ball-Drop-H012642.PDF","docCreatedDate":"2017-09-28T23:30:00.000-05:00","modifiedDate":"2017-09-28T23:30:00.000-05:00","docdate":"2017-09-28T23:30:00.000-05:00","docrefNum":"H012642","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"Intelligent Completion Technology Enables Selective Injection and Production in Mature Field Offshore China","description":"One operator in the South China Sea\nwas operating in a mature field that had been producing for approximately seven years, and had experienced a relatively steep production decline. The legacy single-string completions installed in the water injector wells prevented the operator from distributing injection rates across the heterogeneous reservoir. This affected the pressure maintenance of the field, resulting in a decline of the reservoir pressure at a higher rate than desired.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011940-Vietnam.pdf","docCreatedDate":"2015-10-02T23:30:00.000-05:00","modifiedDate":"2015-10-02T23:30:00.000-05:00","publishDate":"2018-10-02T11:28:16.681-05:00","docdate":"2015-10-02T23:30:00.000-05:00","docrefNum":"H011940","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Workflow_Integration:HalComplete:Deepwater_Completions,Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intelligent_Completions:Interval_Control-WellDynamics,"},{"title":"eRED® Valves Save 10 Wireline Runs from Subsea Completion","description":"The Eastern Trough Area Project (ETAP) is an integrated development of seven different reservoirs. Four separate fields are operated by BP: Marnock, Mungo, Monan and Machar.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H010517.pdf","docCreatedDate":"2016-02-09T22:30:00.000-06:00","modifiedDate":"2016-02-09T22:30:00.000-06:00","docdate":"2016-02-09T22:30:00.000-06:00","docrefNum":"H010517","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"eRED® Valve Provides Efficiencies and Time Savings in Downhole Operations","description":"Valve Operates Remotely After 23 Months Down Hole","path":"/content/dam/ps/public/wd/contents/Case_Histories/eRED-Opened-After-23-Months-H012809.pdf","docCreatedDate":"2018-07-25T23:30:00.000-05:00","modifiedDate":"2018-07-25T23:30:00.000-05:00","publishDate":"2018-10-02T11:28:19.975-05:00","docdate":"2018-07-25T23:30:00.000-05:00","docrefNum":"H012809","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"eMotion®-LV Remotely Operated Barrier Valve Allows Interventionless Completion Installation","description":"Offshore Newfoundland and Labrador, a major operator was looking to increase the efficiency of their deepwater completion deployment by removing all intervention\noperations.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011930-eRED-LV.pdf","docCreatedDate":"2017-04-28T23:30:00.000-05:00","modifiedDate":"2017-05-10T23:30:00.000-05:00","docdate":"2017-04-28T23:30:00.000-05:00","docrefNum":"H011930","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"eMotion®-LV Barrier Valve Saves 29 Hours Rig Time","description":"Interventions eliminated during packer-setting operations - saving time and removing risk","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011341.pdf","docCreatedDate":"2017-05-26T23:30:00.000-05:00","modifiedDate":"2017-05-26T23:30:00.000-05:00","docdate":"2017-05-26T23:30:00.000-05:00","docrefNum":"H011341","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"Successful Auto Gas-Lift Using Intelligent Completion Boosted Oil Production","description":"A major customer operating in a mature field in Oman\nhad a few wells that were shut-in due to insufficient\nreservoir pressure to sustain natural flow. This was\nadversely impacting field production and eroding\nproject value.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011885.pdf","docCreatedDate":"2015-10-01T23:30:00.000-05:00","modifiedDate":"2015-10-01T23:30:00.000-05:00","docdate":"2015-10-01T23:30:00.000-05:00","docrefNum":"H011885","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intelligent_Completions:Interval_Control-WellDynamics,Completion_Equipment_and_Services:Permanent_Monitoring-WellDynamics,"},{"title":"eRED® Valves Maximize Efficiency During Upper Completion Deployment","description":"In this operation two eRED® valves were used to successfully deploy the upper completion on the Shell Norge Draugen E-4 well while maintaining the highest level of safety.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011283.pdf","docCreatedDate":"2014-09-18T23:30:00.000-05:00","modifiedDate":"2014-09-18T23:30:00.000-05:00","docdate":"2014-09-18T23:30:00.000-05:00","docrefNum":"H011283","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"Equalizing Tools Combine to Deliver Time Savings","description":"BP had successfully used the Red Spider hRED™ valve (hydraulic remote equalization device) as a shallow set barrier in several platform operations, but the sidetrack well would be their first use of the tool in a subsea application.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H010521.pdf","docCreatedDate":"2016-02-08T22:30:00.000-06:00","modifiedDate":"2016-02-10T22:30:00.000-06:00","docdate":"2016-02-08T22:30:00.000-06:00","docrefNum":"H010521","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions:Flow_Control_Equipment,Completion_Equipment_and_Services:Remote_Open_Close_Technology,Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions,"},{"title":"Use of Remotely Operated Technology Saves 45 Hours Rig Time","description":"In the UK North Sea, Chevron wanted to eliminate interventions during completion installation to reduce the rig time associated with these operations. Halliburton proposed the use of eMotion®-LV remotely operated barrier valve and the Evo-RED® bridge plug to help eliminate a number of intervention runs while increasing the efficiency of the operation.","path":"/content/dam/ps/public/wd/contents/Case_Histories/eRED-LV-UK-North-Sea-45HRS.pdf","docCreatedDate":"2017-04-20T23:30:00.000-05:00","modifiedDate":"2017-05-10T23:30:00.000-05:00","docdate":"2017-04-20T23:30:00.000-05:00","docrefNum":"H012230","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"eRED® Valves Yield Multimillion Dollar Savings ","description":"Five wells completed without wireline intervention in Vietnam","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011430.pdf","docCreatedDate":"2016-11-08T22:30:00.000-06:00","modifiedDate":"2016-11-08T22:30:00.000-06:00","publishDate":"2018-10-02T11:28:13.664-05:00","docdate":"2016-11-08T22:30:00.000-06:00","docrefNum":"H011430","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reducing_Costs,HSEQ,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"First intelligent completion in UAE field maximizes production and alleviates infrastructure constraints","description":"This was the first intelligent completion in\nthe United Arab Emirates (UAE) offshore field. The client was evaluating the technology and its economic benefits and how it could alleviate some of the infrastructure constraints, like limitation of well slots that it faced with offshore platforms.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011893-UAE.pdf","docCreatedDate":"2015-10-01T23:30:00.000-05:00","modifiedDate":"2015-10-01T23:30:00.000-05:00","docdate":"2015-10-01T23:30:00.000-05:00","docrefNum":"H011893","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intelligent_Completions:Zonal_Isolation-WellDynamics,Completion_Equipment_and_Services:Intelligent_Completions:Downhole_Control_Systems-WellDynamics,Completion_Equipment_and_Services:Intelligent_Completions:Interval_Control-WellDynamics,"},{"title":"eRED® Valves Save 88 Hours of Rig Time for Upper Completion Project","description":"Remotely Operated Valves Eliminate Requirement of Costly Intervention","path":"/content/dam/ps/public/wd/contents/Case_Histories/Shell-Malikai-eRED-Valve.pdf","docCreatedDate":"2018-06-28T23:30:00.000-05:00","modifiedDate":"2018-06-28T23:30:00.000-05:00","docdate":"2018-06-28T23:30:00.000-05:00","docrefNum":"H012987","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"Surveillance Solution Provides Reliable Real-Time Data ","description":"Increases Hydrocarbon Recovery in High-Temperature Conditions","path":"/content/dam/ps/public/wd/contents/Case_Histories/ERD-North-America-CH.pdf","docCreatedDate":"2019-08-14T10:21:00.000-05:00","modifiedDate":"2019-08-14T11:23:06.006-04:00","docdate":"2019-08-14T10:21:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Completion_Equipment_and_Services:Permanent_Monitoring-WellDynamics,"},{"title":"Remotely operated Evo-RED® bridge plugs achieve new run record","description":"A major operator in Norway was looking for a way to efficiently carry out a plug and abandonment operation on its well. However, the operation proved to be a challenge due to gas buildup in the annular\nregion.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H012010-Evo-RED.pdf","docCreatedDate":"2015-12-10T22:30:00.000-06:00","modifiedDate":"2015-12-10T22:30:00.000-06:00","publishDate":"2018-10-02T11:28:17.805-05:00","docdate":"2015-12-10T22:30:00.000-06:00","docrefNum":"H012010","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions:Retrievable_Bridge_Plugs,Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"eRED® Valve Used as a Remotely Operated Shut-In Barrier","description":"The eRED valve functioned\n(opened then closed) as per the designed program for the flow and pressure build-up periods on the York East well.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H010518.pdf","docCreatedDate":"2016-02-09T22:30:00.000-06:00","modifiedDate":"2016-02-09T22:30:00.000-06:00","docdate":"2016-02-09T22:30:00.000-06:00","docrefNum":"H010518","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"Remote Open Close Technology Reduces Abandonment Costs and Increases Operational Efficiency","description":"Evo-RED bridge plug saves 30 hours of rig time","path":"/content/dam/ps/public/wd/contents/Case_Histories/Evo-RED-Australia-H012425.pdf","docCreatedDate":"2017-07-10T23:30:00.000-05:00","modifiedDate":"2017-07-10T23:30:00.000-05:00","docdate":"2017-07-10T23:30:00.000-05:00","docrefNum":"H012425","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Maintenance_Challenges:Live_Well_Intervention,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions,Completion_Equipment_and_Services:Remote_Open_Close_Technology,Completion_Equipment_and_Services:Intervention_Solutions-Well_Completions:Retrievable_Bridge_Plugs,"},{"title":"eRED® Valve Mitigates HSE Exposure During Completion Deployment","description":"In this injector well operation, standard tubing hangers and production packer plugs were replaced with an eRED valve, removing the need for wireline, helping to reduce risk and overall cost of the operation.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H010519.pdf","docCreatedDate":"2016-02-10T22:30:00.000-06:00","modifiedDate":"2016-02-10T22:30:00.000-06:00","docdate":"2016-02-10T22:30:00.000-06:00","docrefNum":"H010519","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Remote_Open_Close_Technology,"},{"title":"Successful execution of the deepest and highest pressure producing wells in the world for client","description":"Not only was this complex project successfully\nexecuted, a record was set for the operator,\nmaking these wells their deepest and highest\npressure producing worldwide.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011859-GoM-IC.pdf","docCreatedDate":"2015-10-01T23:30:00.000-05:00","modifiedDate":"2015-10-01T23:30:00.000-05:00","docdate":"2015-10-01T23:30:00.000-05:00","docrefNum":"H011859","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intelligent_Completions:Chemical_Injection,Completion_Equipment_and_Services:Permanent_Monitoring-WellDynamics,"},{"title":"BaraMesh® Shaker Screens Outperform Competitor, Saving USD 10,000 Per Well","description":"An operator in south Oman was faced with several issues related to solids control efficiency. Utilizing BaraMesh® shale shaker screens proved to be the optimal solution for the operator to increase performance and reduce costs.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraMesh-Shaker-Screens.pdf","docCreatedDate":"2017-07-06T23:30:00.000-05:00","modifiedDate":"2017-07-06T23:30:00.000-05:00","docdate":"2017-07-06T23:30:00.000-05:00","docrefNum":"H012614","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:Oman_Middle_East,|prodgroups:Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,"},{"title":"Custom LCM blend stops total losses in fractured limestone","description":"BaraBlend®-665 LCM and BaraLock®-666 LCM halt total losses in fractured limestone, saving 4.8 days of drilling and US$556,000","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/A_through_M/BaraBlend-665-BaraLock-666.pdf","docCreatedDate":"2015-08-01T23:30:00.000-05:00","modifiedDate":"2015-12-03T22:30:00.000-06:00","docdate":"2015-08-01T23:30:00.000-05:00","docrefNum":"H011878","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:North_America:United_States:North_Dakota,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"WellSET® treatment helps operator avoid losses while drilling severely depleted sands","description":"WellSET® treatment helps operator avoid losses while drilling severely depleted sands","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/WellSET-Angola.pdf","docCreatedDate":"2016-02-03T22:30:00.000-06:00","modifiedDate":"2016-02-03T22:30:00.000-06:00","docdate":"2016-02-03T22:30:00.000-06:00","docrefNum":"H012049","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,"},{"title":"Baroid Successfully Executes LMP/DBP Operations for Offshore Oilfield Project","description":"Enable fast mobilizations of large\nvolumes of oil-based mud","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012785.pdf","docCreatedDate":"2017-12-11T22:30:00.000-06:00","modifiedDate":"2017-12-11T22:30:00.000-06:00","docdate":"2017-12-11T22:30:00.000-06:00","docrefNum":"H012785","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges,Extending_Economic_Life,|brandgroups:Baroid,|locations:Asia:Southwestern_Asia:Azerbaijan_Southwestern_Asia,Global,|prodgroups:Fluids_Solids_Control:Liquid_Mud_Plant_Engineering,"},{"title":"BARADRIL-N® Reservoir Drilling Fluid Delivers Zero NPT on Field's Longest Lateral","description":"The 7,074-foot (2,156-meter) lateral was drilled successfully with zero NPT, extending 58 percent farther than offset wellbores, with high ROP.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BARADRIL-N-Oman.pdf","docCreatedDate":"2016-09-27T23:30:00.000-05:00","modifiedDate":"2016-09-27T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:56.603-05:00","docdate":"2016-09-27T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:North_America:United_States,"},{"title":"BaraSolve™ Engineering Services Save Offshore Operator 16 Hours and USD 570,000","description":"Optimize waste management services for offshore operation, where cuttings handling inefficiencies and limited space for cuttings boxes were causing drilling disruptions","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012828.pdf","docCreatedDate":"2018-01-23T22:30:00.000-06:00","modifiedDate":"2018-01-23T22:30:00.000-06:00","docdate":"2018-01-23T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Cuttings_Handling_and_Disposal,Reduce_Nonproductive_Time,|brandgroups:Baroid,|locations:Global,South_America:Venezuela_Northern_South_America,|prodgroups:Fluids_Solids_Control:Solids_Control:Engineering_Services,Fluids_Solids_Control:Separation_&_Handling:Waste_Handling_&_Transport,"},{"title":"BARO-LUBE NS Lubricant Saves 7-10 Days of Rig Time","description":"BARO-LUBE NS™ Lubricant lowers torque by 27 percent to stop high torque, drilling resumes in reservoir","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BARO-LUBE-NS-UK.pdf","docCreatedDate":"2016-02-24T22:30:00.000-06:00","modifiedDate":"2016-02-24T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:34.238-05:00","docdate":"2016-02-24T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:North_Sea,Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lubricants-Baroid,"},{"title":"Azerbaijan: LMP Shearing Unit Doubles Procces Rate, Delivers In-Spec OBM, Saving Over USD 400,000","description":"BP Exploration Ltd. wanted to improve fluid shearing services for its Caspian Sea operations in Azerbaijan.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/LMPShearUnit-CaspianSea.pdf","docCreatedDate":"2016-10-24T23:30:00.000-05:00","modifiedDate":"2016-10-24T23:30:00.000-05:00","docdate":"2016-10-24T23:30:00.000-05:00","docrefNum":"H012363","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Caspian_Sea,Asia:Southwestern_Asia:Azerbaijan_Southwestern_Asia,|prodgroups:Fluids_Solids_Control:Surface_Solutions,Fluids_Solids_Control:Solids_Control,"},{"title":"Chile: WellSET® Treatment Services Isolated Perforations & Helped Eliminate Fluid Losses","description":"During a completion job for a well with total depth of 3,072 m, the operator wanted to maximize well production by isolating the secondary pay zone of the Terciario Superior formation.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011530.pdf","docCreatedDate":"2014-12-12T22:30:00.000-06:00","modifiedDate":"2014-12-12T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:45.906-05:00","docdate":"2014-12-12T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,|brandgroups:Baroid,|locations:South_America:Chile_Southern_South_America,Global,|prodgroups:Fluids_Solids_Control:Fluids_Software_Solutions,Fluids_Solids_Control:Fluids_Engineering,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,Real_Time_Services:Real-Time_&_Automation_Services,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Engineering_Design_Software,"},{"title":"Customized Fluid and Right-Size Shaker Screen Solution Saves Rig 17 Hours","description":"Saturated-Salt Fluid and Right-Size Screens Safely Deliver Gauge\nHole, Saving Time on Exploration Well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CustomizedFluidScreenSolution.pdf","docCreatedDate":"2015-10-12T23:30:00.000-05:00","modifiedDate":"2015-10-12T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:15.274-05:00","docdate":"2015-10-12T23:30:00.000-05:00","docrefNum":"H011975","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Middle_East:Oman_Middle_East,|prodgroups:Fluids_Solids_Control:Solids_Control:Solids_Control_Equipment_and_Screens,Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control,Wireline_and_Perforating:Borehole_Seismic_Analysis:Water_Based_Mud,"},{"title":"BaraSolve™ Services and BaraStream™ Solutions Save Rig Time and Cost","description":"Halliburton was awarded key offshore and onshore waste\nmanagement contracts for BP\u2019s drilling campaign in\nEgypt. For offshore, the customer contracted a drillship\nwith a screw conveyor as the primary, and only, means of\ntransporting cuttings from the shakers to a zero-discharge\ncuttings handling system.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012512.pdf","docCreatedDate":"2017-04-06T23:30:00.000-05:00","modifiedDate":"2017-04-06T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:07.707-05:00","docdate":"2017-04-06T23:30:00.000-05:00","docrefNum":"H012512","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Cuttings_Handling_and_Disposal,Reduce_Nonproductive_Time,Remote_Locations,|brandgroups:Baroid,|locations:Africa:Northern_Africa:Egypt_Northern_Africa,Global,|prodgroups:Fluids_Solids_Control:Solids_Control:Engineering_Services,Fluids_Solids_Control:Separation_&_Handling:Waste_Handling_&_Transport,"},{"title":"N-FLOW™ 325 Delayed-Reaction Breaker System Freed Differentially Stuck Pipe","description":"N-FLOW™ 325 Delayed-Reaction\nBreaker System Frees Differentially\nStuck Pipe","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/NFLOW-Oman.pdf","docCreatedDate":"2016-05-09T23:30:00.000-05:00","modifiedDate":"2016-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:43.984-05:00","docdate":"2016-05-09T23:30:00.000-05:00","docrefNum":"H012208","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Global,Middle_East:Oman_Middle_East,|prodgroups:Fluids_Solids_Control:Breaker_Systems,"},{"title":"Customized NAF, Optimized Solids Control, and STOPPIT® LCM Help Save over USD 1 Million in One Year","description":"Provide effective cure for severe losses in large fractures","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012882.pdf","docCreatedDate":"2018-03-15T23:30:00.000-05:00","modifiedDate":"2018-05-11T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:31.424-05:00","docdate":"2018-03-15T23:30:00.000-05:00","docrefNum":"H012882","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges,|brandgroups:Baroid,|locations:Middle_East:Oman_Middle_East,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Separation_&_Handling:Waste_Handling_&_Transport,"},{"title":"Qatar: Engineered PERFORMADRIL® Fluid System with BARACARB® Bridging Agents Helped Save 3 Days of Rig Time and $4M ","description":"Qatar Shell Services Company (QSSC ) was planning to drill and core an 8½\u201d reservoir section in an exploration well in the Pre-Khuff formation. The primary target was the Jauf Reservoir, and the Unayzah Reservoir was the secondary target. QSSC was seeking an environmentally-friendly fluid system that could help minimize formation damage and provide optimum shale inhibition for increased wellbore stability over an extended period of time during well logging. As an added challenge, the expected temperature in the reservoir section was expected to be 300°F.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011533.pdf","docCreatedDate":"2014-12-15T22:30:00.000-06:00","modifiedDate":"2014-12-15T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:47.490-05:00","docdate":"2014-12-15T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Borehole_Challenges:Borehole_Stability,Formation_Challenges:Damaged_Formations,Reservoir_Challenges:High_Temperature,|brandgroups:Baroid,|locations:Global,Middle_East:Qatar_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Africa: HYDRO-GUARD® water-based fluid system solves shale challenge and nets operator significant savings in remote exploration well","description":"The customer utilized Baroid's HYDRO-GUARD water-based drilling fluid system to deliver the rate of penetration and gauge hole necessary to successfully drill an exploratory well in Offshore Namibia","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010320.pdf","docCreatedDate":"2013-06-01T23:30:00.000-05:00","modifiedDate":"2013-07-16T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:31.786-05:00","docdate":"2013-06-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Management:Water_Based-Waste_Management,Fluids_Challenges:Waste_Minimization:Water_Based-Waste_Minimization,Drilling_Challenges:Increased_ROP,Formation_Challenges:Shale,Environmental_Challenges,|brandgroups:Baroid,|locations:Global,Africa:Eastern_Africa,Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Halliburton Drilling Solution Helps Operator Maximize Reservoir Contact","description":"Rotary Steerable System and High-Performance Fluid and Bit Systems Optimize Drilling in Super Lateral","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013324.pdf","docCreatedDate":"2019-08-15T09:28:09.681-04:00","modifiedDate":"2019-08-15T09:28:09.681-04:00","docdate":"2019-08-15T09:28:09.681-04:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Drilling_Operational_Efficiency,Drilling_Challenges:Improving_Drilling_Efficiency,|brandgroups:Baroid,|locations:Global,North_America:United_States:New_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids_Solutions,"},{"title":"CLAY GRABBER® improves efficiency and dilution rate, saving US$35,000","description":"CLAY GRABBER® clay encapsulator injection at centrifuges reduces water demand, improves drilling performance and saves US$35,000","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CLAY-GRABBER-Eduador.pdf","docCreatedDate":"2015-12-14T22:30:00.000-06:00","modifiedDate":"2015-12-14T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:23.108-05:00","docdate":"2015-12-14T22:30:00.000-06:00","docrefNum":"H011993","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,South_America:Ecuador_Western_South_America,|prodgroups:Fluids_Solids_Control,"},{"title":"BaraG-Force™ VacVCD System Significantly Reduces ROC Levels, Saving Costs on 16-Well Program","description":"Baroid Solution reduces ROC to 4 percent, saving USD 18,350 per well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012823.pdf","docCreatedDate":"2018-02-14T22:30:00.000-06:00","modifiedDate":"2018-02-14T22:30:00.000-06:00","docdate":"2018-02-14T22:30:00.000-06:00","docrefNum":"H012823","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Cuttings_Handling_and_Disposal,Reduce_Nonproductive_Time,|brandgroups:Baroid,|locations:Global,North_America:United_States,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Waste_Handling_&_Transport,"},{"title":"INNOVERT® fluid demonstrates stability and resilience","description":"INNOVERT® fluid demonstrates stability and resilience in challenging\ndeepwater Angola project","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/INNOVERT-WellboreIntegrity.pdf","docCreatedDate":"2015-09-21T23:30:00.000-05:00","modifiedDate":"2015-09-21T23:30:00.000-05:00","docdate":"2015-09-21T23:30:00.000-05:00","docrefNum":"H011849","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"North Sea: INNOVERT® oil-based fluid success on North Sea horizontal well for 16-in, 12 1/4-in, and 8 1/2-in. sections","description":"The challenge was to drill an 18,000 ft (5,486 m) well into a chalk reservoir at a 90 degree inclination where high losses had been experienced on previous wells in the field.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09152.pdf","docCreatedDate":"2012-10-01T23:30:00.000-05:00","modifiedDate":"2012-12-12T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:25.526-05:00","docdate":"2012-10-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,Fluids_Challenges:Barite_Sag,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Europe:Western_Europe:United_Kingdom_Western_Europe,Oceans_Gulfs_International_Waters:North_Sea,Europe,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraSure™ W-674 Shale Stabilizer Stops Clay Swelling and High Torque in Oil Sand Lateral","description":"High risk of swelling clays. Excessive torque leading to\nstuck pipe. Oil sand accretion on the BHA","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012703.pdf","docCreatedDate":"2017-10-11T23:30:00.000-05:00","modifiedDate":"2017-10-11T23:30:00.000-05:00","docdate":"2017-10-11T23:30:00.000-05:00","docrefNum":"H012703","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Shale,|brandgroups:Baroid,|locations:South_America,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives,"},{"title":"BaraCRI™ Unit Solves Operator\u2019s Challenge for Real-Time Cuttings Reinjection","description":"Dispose of drilling waste economically, safely, and compliantly","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010969.pdf","docCreatedDate":"2014-02-01T22:30:00.000-06:00","modifiedDate":"2017-10-25T23:30:00.000-05:00","docdate":"2014-02-01T22:30:00.000-06:00","docrefNum":"H010969","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Solids_Control,Fluids_Challenges:Cuttings_Handling_and_Disposal,|brandgroups:Baroid,|locations:Asia:Northern_Asia:Russia_Northern_Asia,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Cuttings_Reinjection,Fluids_Solids_Control:Cuttings_Injection,"},{"title":"Iraq: STOPPIT®-BAROFIBRE® LCM Sweeps Eliminate Severe Losses, NPT in Carbonate Formations","description":"Pumping a STOPPIT®-BAROFIBRE® LCM sweep every 1\u20132 stands provided the multi-modal, variable-size solution for sealing and bridging the loss zones while drilling.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STOPPIT-BAROFIBRE-Iraq.pdf","docCreatedDate":"2016-11-08T22:30:00.000-06:00","modifiedDate":"2016-11-08T22:30:00.000-06:00","docdate":"2016-11-08T22:30:00.000-06:00","docrefNum":"H012357","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Middle_East:Iraq_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"BaraECD® NAF Helps Deepwater Operator Achieve Record Drilling Performance","description":"HIGH-PERFORMANCE NAF HELPS REDUCE DRILLING DAYS BY HALF AND ENABLES PRODUCTION CASING TO BE SET AND CEMENTED WITH NEAR-ZERO LOSSES","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013377-BaraECD-GOM.pdf","docCreatedDate":"2019-10-18T08:10:00.000-05:00","modifiedDate":"2019-10-29T14:35:33.850-04:00","docdate":"2019-10-18T08:10:00.000-05:00","docrefNum":"H013409","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,"},{"title":"BaraMesh® Shaker Screens Help Occidental Petroleum Save Time and Money","description":"BaraMesh® shaker screens help reduce cost and operating time for\nOccidental Petroleum in Oman","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HO12002BarameshScreensOman.pdf","docCreatedDate":"2016-01-27T22:30:00.000-06:00","modifiedDate":"2016-01-27T22:30:00.000-06:00","docdate":"2016-01-27T22:30:00.000-06:00","docrefNum":"HO12002","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Solids_Control,|brandgroups:Baroid,|locations:Middle_East:Oman_Middle_East,|prodgroups:Fluids_Solids_Control:Solids_Control:Solids_Control_Equipment_and_Screens,Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,"},{"title":"Drill-in fluid and delayed breaker deliver 104% return permeability","description":"BARADRIL-N® drill-in fluid and N-FLOW™ 408 filter cake breaker help\noperator maximize productivity in a mature field","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BARADRILN-NFLOWMalaysia.pdf","docCreatedDate":"2016-01-28T22:30:00.000-06:00","modifiedDate":"2016-01-28T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:29.629-05:00","docdate":"2016-01-28T22:30:00.000-06:00","docrefNum":"H012051","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,Global,|prodgroups:Fluids_Solids_Control:Breaker_Systems,Fluids_Solids_Control:Reservoir_Drilling_Fluids,"},{"title":"Mobile VCD Saves Operator over $300K in OBM Recovery and Waste Volume Reduction","description":"Mobile VCD Saves Operator over $300K in OBM Recovery and Waste Volume Reduction","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/MVD-WasteManagement.pdf","docCreatedDate":"2015-03-31T23:30:00.000-05:00","modifiedDate":"2015-10-02T23:30:00.000-05:00","docdate":"2015-03-31T23:30:00.000-05:00","docrefNum":"H101687","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,North_America:United_States,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Cuttings_Dryers,Fluids_Solids_Control:Waste_Management,"},{"title":"Argentina: Optimized Bridging Package Helps Reduce Total Operational Time and Obtain a Nominal Borehole Diameter","description":"The operator was looking for a solution that would help increase wellbore stability and maximize efficiency in order to reduce the number of days spent completing the well. Prior wells drilled in the field experienced excessive dragging during tripping operations, instability issues, and irregular borehole diameters.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STEELSEAL-Wellbore-Stability-Argentina.pdf","docCreatedDate":"2015-01-30T22:30:00.000-06:00","modifiedDate":"2015-01-30T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:48.501-05:00","docdate":"2015-01-30T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:South_America:Argentina_Southern_South_America,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,"},{"title":"CLAYSEAL® PLUS Shale Stabilizer Helps Operator Save Helps Operator Save Four Days of Rig Time and Almost USD 200,000","description":"The first horizontal well in Argentina\u2019s Diadema field targeted the Upper Garnet Zone (UGZ) formation, a highly permeable sandstone with interbedded clay stringers. A water-based mud (WBM) formulated with potassium formate brine was selected to drill this reservoir. The potassium formate concentration was approximately 10 l/m3, which was expected to help inhibit reactive clays while minimizing formation damage. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CLAYSEAL-PLUS-Argentina.pdf","docCreatedDate":"2016-08-09T23:30:00.000-05:00","modifiedDate":"2016-08-09T23:30:00.000-05:00","docdate":"2016-08-09T23:30:00.000-05:00","docrefNum":"H012270","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:South_America:Argentina_Southern_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,"},{"title":"BaraShield®-663 LCM Cuts Seepage Losses by 75 Percent in Unconventional Well","description":"LCM Solution saves operator approximately USD 25,700","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012730.pdf","docCreatedDate":"2017-11-08T22:30:00.000-06:00","modifiedDate":"2017-11-08T22:30:00.000-06:00","docdate":"2017-11-08T22:30:00.000-06:00","docrefNum":"H012730","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Global,South_America:Argentina_Southern_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,"},{"title":"North Sea: PERFORMADRIL® Solution Maintains Integrity of Deviated, Large-Diameter Hole through Unstable, Reactive Claystone","description":"Baroid successfully used PERFORMADRIL wtaer-based drilling fluid system to drill through a highly unstable and reactive claystone","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010422.pdf","docCreatedDate":"2013-07-01T23:30:00.000-05:00","modifiedDate":"2013-07-16T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:30.353-05:00","docdate":"2013-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Minimization:Water_Based-Waste_Minimization,Fluids_Challenges:Waste_Management:Water_Based-Waste_Management,Environmental_Challenges,Formation_Challenges:Shale,Drilling_Challenges:Increased_ROP,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:Netherlands_Western_Europe,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Russia: Baroid Drilling Fluids Graphics (DFG™) Software and LCM Strategy Help Provide Successful Drilling Operations and Cement Job","description":"An operator in the North Caucasus Region of Russia was drilling an ultra deep (5,800 meters) High-Pressure/High-Temperature vertical exploratory well. During the fifth interval at 4,811m, the operator experienced lost circulation.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011522.pdf","docCreatedDate":"2016-07-07T23:30:00.000-05:00","modifiedDate":"2016-07-07T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:45.906-05:00","docdate":"2016-07-07T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,|brandgroups:Baroid,|locations:Asia:Northern_Asia:Russia_Northern_Asia,Global,|prodgroups:Fluids_Solids_Control:Fluids_Software_Solutions,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"UAE Operator Lowers Well Completion Cost with Novel Filter Cake Breaker Technology","description":"CUSTOMIZED, DELAYED-REACTION N-FLOW™ 408 FILTER CAKE","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013236-n-flow-cs.pdf","docCreatedDate":"2019-04-19T13:51:00.000-05:00","modifiedDate":"2019-05-22T16:08:43.957-04:00","docdate":"2019-04-19T13:51:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,Formation_Challenges:Shale,|brandgroups:Baroid,|locations:Global,Middle_East:United_Arab_Emirates_Middle_East,"},{"title":"Inhibitive HYDRO-GUARD® WBM and DFG™ Modeling Software Deliver Trouble-free Drilling, Saving US$ 360K","description":"Offset wells experienced multiple downhole issues:\n» High torque\n» Lost circulation\n» Reactive clays\n» Gas and water flows\n» Differential sticking","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012670.pdf","docCreatedDate":"2017-10-17T23:30:00.000-05:00","modifiedDate":"2017-10-17T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:18.495-05:00","docdate":"2017-10-17T23:30:00.000-05:00","docrefNum":"H012670","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Stuck_Pipe,Drilling_Challenges:Drill_String_Torque_Drag_Reduction,Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Global,Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"CLAYSEAL® PLUS™ Shale Stabilizer Saves Operator US$150,000","description":"Solution helps minimize swelling clay, shorten trip time.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CLAYSEALPLUS.pdf","docCreatedDate":"2016-07-20T23:30:00.000-05:00","modifiedDate":"2016-07-20T23:30:00.000-05:00","docdate":"2016-07-20T23:30:00.000-05:00","docrefNum":"H011734","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Global,South_America:Colombia_Northern_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,"},{"title":"DFG™ software helps Husky Oil avoid lost circulation events and save US$24,500","description":"Drilling Fluids Graphics (DFG™) Software Helps Prevent\nLost Circulation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/DFG-LostCirculation.pdf","docCreatedDate":"2015-08-28T23:30:00.000-05:00","modifiedDate":"2015-09-11T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:07.239-05:00","docdate":"2015-08-28T23:30:00.000-05:00","docrefNum":"H011920","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:North_America:Canada,|prodgroups:Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"Venezuela: EZ-PLUG® LCM reduces losses in high permeability, low fracture gradient sections of allochthonous zone","description":"Lost circulation is common in the allochthonous zone because of low fracture gradients and high permeability. The zone is composed of multiple formation types adding to the complexity of maintaining an appropriate fluid density.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09939.pdf","docCreatedDate":"2012-07-01T23:30:00.000-05:00","modifiedDate":"2012-12-14T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:25.526-05:00","docdate":"2012-07-01T23:30:00.000-05:00","docrefNum":"H09939","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:South_America,South_America:Venezuela_Northern_South_America,|prodgroups:Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,"},{"title":"Angola: LCM Pill Seals loss Zone in Deepwater Angola","description":"By Using HYDRO-PLUG as a Cement Support in the open hole before setting a kick off plug, the cement remained in place and did not allow for any channeling inside the large rat hole that held the junk from centralizers left in the hole.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010968.pdf","docCreatedDate":"2014-02-01T22:30:00.000-06:00","modifiedDate":"2014-02-27T22:30:00.000-06:00","docdate":"2014-02-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,"},{"title":"Enhanced BaraShale™ Lite Fluid System Enables Operator to Avoid Lost Circulation and Drill Faster","description":"Using the updated BaraShale Lite direct emulsion fluid system, the operator achieved better drilling with less time and expense needed to maintain optimal fluid properties. The operator compared these programs to the direct emulsion fluid system and, in total cost of ownership (TCO), recognized savings of approximately USD 100,000 per well.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/enhanced-barashale-lite-fluid-case-study.pdf","docCreatedDate":"2019-05-01T09:43:00.000-05:00","modifiedDate":"2019-06-07T15:38:08.649-04:00","docdate":"2019-05-01T09:43:00.000-05:00","docrefNum":"H013273","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:North_America:United_States:New_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"BaraBlend®-665/BaraLock®-666 LCM Pills Help Stop Losses in Deep Fractured Carbonate, Save USD 600K","description":"Stop severe losses in highly fractured carbonate formation:\n» High volumes of non-aqueous fluid lost at 5,900 meters (19,357 feet)\n» Cement plugs cause delay and\nincrease well control risks","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012668.pdf","docCreatedDate":"2017-10-17T23:30:00.000-05:00","modifiedDate":"2017-10-17T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:18.495-05:00","docdate":"2017-10-17T23:30:00.000-05:00","docrefNum":"H012668","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Carbonate_Formations,Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Global,South_America:Brazil_Eastern_South_America,"},{"title":"Static loss rate drops 87% after use of DUO-SQUEEZE® R LCM pills","description":"Plugging Perforations with Engineered LCM Pills Saves Operator US$500,000 in Rig Time and Eliminates Cement Plug Operation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/DUO-SQUEEZE-2-Qatar.pdf","docCreatedDate":"2015-12-02T22:30:00.000-06:00","modifiedDate":"2015-12-02T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:20.091-05:00","docdate":"2015-12-02T22:30:00.000-06:00","docrefNum":"H012016","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Global,Middle_East:Qatar_Middle_East,|prodgroups:Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,"},{"title":"BaraDrilN™ X Fluid Helps Customer Achieve Well Testing Operation in HPHT Environment","description":"In India, Oil and Natural Gas Corporation Ltd.\n(ONGC) was involved in the development of a\nhigh-pressure/high-temperature (HPHT) field in the\nwestern Mumbai Offshore Basin. Many of these\nwells could not be tested to their full potential due\nto lack of an appropriate and cost-effective HPHT\ncompletion fluid. Downhole temperatures were as\nhigh as 400ºF (204°C), and densities as high as 17.5 lb/gal (2.1 SG) were required.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012511.pdf","docCreatedDate":"2017-04-06T23:30:00.000-05:00","modifiedDate":"2017-04-06T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:07.707-05:00","docdate":"2017-04-06T23:30:00.000-05:00","docrefNum":"H012511","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure:High_Pressure_(10K),Reservoir_Challenges:High_Temperature:High_Temperature_(300F),Environmental_Challenges:Deepwater-Environmental_Challenges,Reducing_Costs,Environmental_Challenges:Corrosion,Fluids_Challenges:Mud_Weight_Management,Environmental_Challenges:Pressure,Fluids_Challenges:Rheology_Control,Reservoir_Challenges:Improve_Reservoir_Productivity,|locations:Asia:Southern_Asia:India_Southern_Asia,Global,|prodgroups:Fluids_Solids_Control:Specialty_Systems,Fluids_Solids_Control:Reservoir_Drilling_Fluids,Fluids_Solids_Control:Reservoir_Fluids_Solutions,Fluids_Solids_Control:High_Impact_Technology_Services,"},{"title":"Innovative Sag-Resistant Fluid Provides Cost-Effective Drilling Solution for High-Angle Wellbore","description":"Months of development and collaboration with the GOM operator yielded an enhanced fluid system that could meet each of the challenges presented by this extremely difficult wellbore.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09055.pdf","docCreatedDate":"2012-08-01T23:30:00.000-05:00","modifiedDate":"2017-12-04T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:43.903-05:00","docdate":"2012-08-01T23:30:00.000-05:00","docrefNum":"H09055","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,Deepwater,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"SHALEDRIL® F Water-Based Fluid Proves Successful on Troublesome Fayetteville Shale","description":"The Marrowian shale that\nlies above the Fayetteville Shale in Arkansas is highly reactive\nand prone to fracturing and delamination. It is typically drilled\nwith an Invert Emulsion fluid, which reduces the chance of swelling of this formation.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H07902.pdf","docCreatedDate":"2010-08-01T23:30:00.000-05:00","modifiedDate":"2017-10-03T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:12.466-05:00","docdate":"2010-08-01T23:30:00.000-05:00","docrefNum":"H07902","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Wellbore_Integrity,Formation_Challenges:Shale,|brandgroups:Baroid,|locations:North_America,North_America:United_States:Arkansas,North_America:United_States,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Specialty_Systems,Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,Fluids_Solids_Control,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"BaraPhase™ TCC and BaraStream™ HCB™ Tanks Eliminate Skip-and-Ship Issues","description":"Baroid Solutions enable operator to finish project six months ahead of schedule","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012731.pdf","docCreatedDate":"2017-11-08T22:30:00.000-06:00","modifiedDate":"2017-11-08T22:30:00.000-06:00","docdate":"2017-11-08T22:30:00.000-06:00","docrefNum":"H012731","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Management,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Fluids_Solids_Control:Waste_Management:Waste_Treatment_&_Disposal,Fluids_Solids_Control:Separation_&_Handling:Thermal_Treatment,"},{"title":"Saudi Arabia: Reservoir Drill-In Fluid Minimizes Fluid Invasion and Mitigates Differential Stuck Pipe","description":"Operator faced production challenges on freshly drilled sandstone reservoirs due to plugged sand screens on production, which put the well on workover operations in less than a year. Investigations showed that the water based drill-in fluids previously used in the well allowed fluids and fines to invade the formation and plug the sand screen during production. \n","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010811.pdf","docCreatedDate":"2013-10-01T23:30:00.000-05:00","modifiedDate":"2013-10-08T23:30:00.000-05:00","docdate":"2013-10-01T23:30:00.000-05:00","docrefNum":"H010811","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Damaged_Formations,Drilling_Challenges:Stuck_Pipe,Fluids_Challenges:Fluid_Loss,|brandgroups:Baroid,|locations:Middle_East,Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Fluids_Solids_Control:DRIL-N_Fluids,Fluids_Solids_Control:Reservoir_Fluids_Solutions,Fluids_Solids_Control:Reservoir_Drilling_Fluids,Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"US Oklahoma: Efficient ECD Control to Aid in Extended Laterals in Frank Field","description":"A major operator in Oklahoma began drilling horizontal wells in the Mississippi and Woodford formations in 2011. In 2013, their newest project began by attempting an Extended Reach Drilling (ERD) lateral in the Woodford formation, hoping to improve production numbers and lower overall drilling costs. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010793.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2013-11-12T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:35.312-05:00","docdate":"2013-11-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,Drilling_Challenges:Drill_String_Torque_Drag_Reduction,|brandgroups:Baroid,|locations:North_America,Global,North_America:United_States:Oklahoma,|prodgroups:Real_Time_Services:Real-Time_&_Automation_Services,Fluids_Solids_Control:Fluids_Engineering,"},{"title":"BaraShield®-664 & BaraLock®-666 LCMs Help Cure Total Losses & Improve Cement Job in Known Thief Zone","description":"Engineered BaraShield®-664 and\nBaraLock®-666 sweeps and LCM\nsqueeze pills were used throughout\nthe interval to seal and heal the\nwellbore.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraShield664BaraLock666.pdf","docCreatedDate":"2017-06-16T23:30:00.000-05:00","modifiedDate":"2017-06-16T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:11.945-05:00","docdate":"2017-06-16T23:30:00.000-05:00","docrefNum":"H012590","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:North_America:United_States,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,"},{"title":"Inhibitive WBM Offers \u2018Green\u2019 Option for Drilling Reactive Shales","description":"CUSTOMIZED WBM INHIBITS SHALES AND ELIMINATES NEED FOR CUTTINGS TRANSPORT AND ONSHORE DISPOSAL","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013289-BaraHib-Eco-Case- Study.pdf","docCreatedDate":"2019-06-01T07:51:00.000-05:00","modifiedDate":"2019-07-01T09:02:21.781-04:00","docdate":"2019-06-01T07:51:00.000-05:00","docrefNum":"H013289","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Minimization:Water_Based-Waste_Minimization,|brandgroups:Baroid,|locations:Europe:Northern_Europe:Norway_Northern_Europe,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"INNOVERT® OBM helps operator successfully drill 2,800-m salt sequence","description":"Clay-free INNOVERT® OBM system helps operator drill deepwater\nwildcat well with 2,800-m salt sequence","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/INNOVERT-Angola.pdf","docCreatedDate":"2016-02-03T22:30:00.000-06:00","modifiedDate":"2016-02-03T22:30:00.000-06:00","docdate":"2016-02-03T22:30:00.000-06:00","docrefNum":"H012049","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraXcel™ HP NAF System Eliminates Two Intervals and Cuts Rig Time in Half","description":"BaraXcel™ HP NAF System Eliminates Two Intervals and Cuts Rig Time in Half","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012401.pdf","docCreatedDate":"2018-08-09T23:30:00.000-05:00","modifiedDate":"2018-08-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:33.965-05:00","docdate":"2018-08-09T23:30:00.000-05:00","docrefNum":"H012401","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Deepwater,|brandgroups:Baroid,|locations:North_America:Mexico,Global,|prodgroups:Fluids_Solids_Control:Conventional_Invert_Emulsion_Systems,"},{"title":"US Colorado: COREDRIL-N™ System Helps Successfully Drill an Exploratory Well in the Piceance Basin ","description":"A customer operating in the Piceance Basin of Rio Blanco County, Colorado was attempting to drill an exploratory well located in the Meeker field. The challenge faced by the operator was finding a drilling fluid that would be non-damaging to the reservoir and would be ideal for securing native-state coring samples. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010832.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2013-11-15T22:30:00.000-06:00","docdate":"2013-11-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Damaged_Formations,|brandgroups:Baroid,|locations:North_America:United_States:Colorado,Global,North_America,|prodgroups:Fluids_Solids_Control:DRIL-N_Fluids:Oil_Base_Dril-N_Fluids,Fluids_Solids_Control:Reservoir_Fluids_Solutions,Fluids_Solids_Control:Reservoir_Drilling_Fluids,Fluids_Solids_Control:DRIL-N_Fluids,"},{"title":"Combo LCM pills save operator US$50,000 and prevent hole collapse","description":"Pills built with STOPPIT® and HYDRO-PLUG® lost circulation materials can cure total losses and prevent wellbore collapse","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STOPPIT-HYDRO-PLUG-LostCirculation.pdf","docCreatedDate":"2015-09-11T23:30:00.000-05:00","modifiedDate":"2015-09-11T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:07.239-05:00","docdate":"2015-09-11T23:30:00.000-05:00","docrefNum":"H011935","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,"},{"title":"BaraXcel™-N HP NAF and BARACARB® LCM Enable Operator to Avoid Sticking Issues in Depleted Sands","description":"BaraXcel™-N HP NAF and BARACARB® LCM Enable Operator to Avoid Sticking Issues in Depleted Sands","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011995.pdf","docCreatedDate":"2018-08-09T23:30:00.000-05:00","modifiedDate":"2018-08-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:32.238-05:00","docdate":"2018-08-09T23:30:00.000-05:00","docrefNum":"H011995","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Conventional_Invert_Emulsion_Systems,"},{"title":"DRIL-N-SLIDE™ lubricant eliminates bit balling and accretion in a shale field in Iraq","description":"DRIL-N-SLIDE™ lubricant eliminates bit balling and more than\ndoubles rate of penetration","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/DRIL-N-SLIDE-KurdistanIraq.pdf","docCreatedDate":"2016-01-06T22:30:00.000-06:00","modifiedDate":"2016-02-10T22:30:00.000-06:00","docdate":"2016-01-06T22:30:00.000-06:00","docrefNum":"H011610","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Baroid,|locations:Global,Middle_East:Iraq_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lubricants-Baroid,"},{"title":"BaraXcel™ HP NAF System Enables Operator to Drill Wolfcamp Well in Record Time","description":"BaraXcel™ HP NAF System Enables Operator to Drill Wolfcamp Well in Record Time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012003.pdf","docCreatedDate":"2018-08-09T23:30:00.000-05:00","modifiedDate":"2018-08-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:32.238-05:00","docdate":"2018-08-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|locations:Global,North_America:United_States,|prodgroups:Fluids_Solids_Control:Conventional_Invert_Emulsion_Systems,"},{"title":"BaraXcel™ HP NAF System Helps Drill Reactive Shales and Abrasive Sandstones with Improved ROP","description":"The wells in northwest Saudi Arabia encounter highly reactive sloughing shales that are followed by abrasive sandstones. These reactive shales pose serious wellbore stability issues and if not managed appropriately can lead to wellbore collapse, hole cleaning issues, stuck pipe incidents, and even lost circulation due to high ECDs (Equivalent Circulating Densities). ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010552.pdf","docCreatedDate":"2013-08-01T23:30:00.000-05:00","modifiedDate":"2018-08-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:31.424-05:00","docdate":"2013-08-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Increased_ROP,Formation_Challenges:Shale,|brandgroups:Baroid,|locations:Middle_East:Saudi_Arabia_Middle_East,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids_Solutions,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"Customized BaraXcel™ Fluid System","description":"Customized BaraXcel™ Fluid System Saves Operator More Than USD 4M in Rig Time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012166.pdf","docCreatedDate":"2018-08-09T23:30:00.000-05:00","modifiedDate":"2018-08-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:33.103-05:00","docdate":"2018-08-09T23:30:00.000-05:00","docrefNum":"H012166","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:North_America:Mexico,Global,|prodgroups:Fluids_Solids_Control:Conventional_Invert_Emulsion_Systems,"},{"title":"N-FLOW™ 325 breaker boosts production in 2,867-m lateral","description":"Customized delayed-reaction N-FLOW™ 325 breaker system helps\nensure effective filter cake removal throughout longest lateral in the\nAl-Khalij field","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/N-FLOW-Breaker-Carbonate.pdf","docCreatedDate":"2015-11-24T22:30:00.000-06:00","modifiedDate":"2015-11-24T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:17.330-05:00","docdate":"2015-11-24T22:30:00.000-06:00","docrefNum":"H012018","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Middle_East:Qatar_Middle_East,|prodgroups:Fluids_Solids_Control:Breaker_Systems,"},{"title":"Customized BARADRIL-N® System Helps Save Days of Rig Time on Ultra-Deepwater GOM Well","description":"FLUID SYSTEM ENABLES OPERATOR TO DRILL AND COMPLETE CHALLENGING RESERVOIR WITH ZERO ISSUES ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013288-BARADRIL-N.pdf","docCreatedDate":"2019-06-01T09:01:00.000-05:00","modifiedDate":"2019-07-01T10:08:36.211-04:00","docdate":"2019-06-01T09:01:00.000-05:00","docrefNum":"H013288","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Sandstone_Formations,Formation_Challenges:Shale,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids_Solutions,"},{"title":"STOPPIT® LCM Pills Cure Loss Rate for Oman Operator","description":"STOPPIT® LCM Pills Cure Severe Losses, Eliminating Need for\nCement Plug","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STOPPIT-LostCirculation.pdf","docCreatedDate":"2015-10-12T23:30:00.000-05:00","modifiedDate":"2015-10-12T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:15.274-05:00","docdate":"2015-10-12T23:30:00.000-05:00","docrefNum":"H011978","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Middle_East:Oman_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,"},{"title":"Cleanup solutions saves operator US$150,000","description":"Direct Displacement Using BARAKLEAN® GOLD Casing Cleaner\nand CFS™ Modeling Saves 10 Hours on Deepwater Operation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BARAKLEAN-GOLD-WellboreCleanup.pdf","docCreatedDate":"2015-04-15T23:30:00.000-05:00","modifiedDate":"2016-09-08T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:18.536-05:00","docdate":"2015-04-15T23:30:00.000-05:00","docrefNum":"H011731","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:South_America:Brazil_Eastern_South_America,Global,|prodgroups:Fluids_Solids_Control:Displacement_Systems,"},{"title":"North Sea: PERFORMADRIL® Drilling Fluid Solution Facilitates Successful Sidetrack through Overpressured Shale","description":"Baroid utilized a customized PERFORMADRIL water-based fluid system to successfully drill a sidetrack through overpressurized shale","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010423.pdf","docCreatedDate":"2013-07-01T23:30:00.000-05:00","modifiedDate":"2013-07-16T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:30.353-05:00","docdate":"2013-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Minimization:Water_Based-Waste_Minimization,Fluids_Challenges:Waste_Management:Water_Based-Waste_Management,Drilling_Challenges:Increased_ROP,Formation_Challenges:Shale,Environmental_Challenges,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Continental Resources Recovers 500+ bbl OBM, Saves $70K with Mobile Vertical Cuttings Dryer","description":"Continental Resources Recovers 500+ bbl OBM,\nSaves $70K with Mobile Vertical Cuttings Dryer","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/MVCD-MidCon-Enervest.pdf","docCreatedDate":"2015-03-25T23:30:00.000-05:00","modifiedDate":"2015-03-25T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:59.770-05:00","docdate":"2015-03-25T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Minimization:Oil_Based-Waste_Minimization,Fluids_Challenges:Cuttings_Handling_and_Disposal,Environmental_Challenges:Water_Management-Environmental_Challenge,Fluids_Challenges:Waste_Management:Oil_Based-Waste_Management,Fluids_Challenges:Solids_Control,|brandgroups:Baroid,|locations:Global,"},{"title":"Switch to BaraMesh® High-Performance Shaker Screens Saves Operator USD 23,000 per Well","description":"Switch to BaraMesh® High-Performance Shaker Screens\nSaves Operator USD 23,000 per Well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraMeshScreensSUSPermianBasin2.pdf","docCreatedDate":"2015-06-09T23:30:00.000-05:00","modifiedDate":"2015-06-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:01.078-05:00","docdate":"2015-06-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Solids_Control,Fluids_Challenges:Fluid_Loss,Fluids_Challenges:Cuttings_Handling_and_Disposal,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,Fluids_Solids_Control:Solids_Control:Solids_Control_Equipment_and_Screens,"},{"title":"STOPPIT® LCM Pills Cure Losses in Fractured Carbonate","description":"SUCCESSFUL APPLICATION OF COMPOSITE LCM SAVES","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013237-stoppit-cs.pdf","docCreatedDate":"2019-04-19T13:55:00.000-05:00","modifiedDate":"2019-05-22T16:08:44.037-04:00","docdate":"2019-04-19T13:55:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,Formation_Challenges:Shale,|brandgroups:Baroid,|locations:Global,Middle_East:Oman_Middle_East,"},{"title":"Organoclay-Free Fluids Enable Operator to Drill and Complete Slim-Profile Well in Record Time","description":"Baroid Fluid Systems and AFO Service help narrow ECD window in mature well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012770.pdf","docCreatedDate":"2017-11-29T22:30:00.000-06:00","modifiedDate":"2017-11-29T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:23.366-05:00","docdate":"2017-11-29T22:30:00.000-06:00","docrefNum":"H012770","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Global,Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Optimization_Services:Fluids_Optimization,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"HYDRO-GUARD® Water-Based Drilling Fluid System Stabilizes Problem Salt/Shale Formation","description":"Saturated-salt HYDRO-GUARD® WBM replaced OBM in a trial well, providing the same drilling performance.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HYDRO-GUARD-Algeria.pdf","docCreatedDate":"2016-08-17T23:30:00.000-05:00","modifiedDate":"2016-08-17T23:30:00.000-05:00","docdate":"2016-08-17T23:30:00.000-05:00","docrefNum":"H012280","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Africa:Northern_Africa:Algeria_Northern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Operator reaches total depth, using 3% concentration by volume of DRIL-N-SLIDE™ lubricant","description":"DRIL-N-SLIDE™ lubricant eliminates excessive torque and improves rate of penetration in S-shaped well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/DRIL-N-SLIDE-SouthIraq.pdf","docCreatedDate":"2016-01-06T22:30:00.000-06:00","modifiedDate":"2016-01-06T22:30:00.000-06:00","docdate":"2016-01-06T22:30:00.000-06:00","docrefNum":"H011609","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Global,Middle_East:Iraq_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lubricants-Baroid,"},{"title":"Gulf of Mexico: Applied Fluids Optimization (AFO) service helps to avoid costly NPT in deviated GOM deepwater well","description":"Baroid\u2019s Applied Fluids Optimization (AFO) services allows AFO specialists to use Drilling Fluids Graphics \u2013 Real Time (DFG RT™) software to interpret the situation in real time, enabling the operators to respond quickly and appropriately.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010868.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2014-02-26T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:37.669-05:00","docdate":"2013-11-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"BaraH<sub>2<\/sub>O™ Slop Treatment Unit Delivers Cost Reduction and Safer Operations","description":"A major operator in the UK North Sea was generating large volumes of slop fluids, which were sent to shore for processing and disposal. The goal was to reduce the volume\nof slop fluids and the associated costs.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraH2O-SlopUnitTreatment.pdf","docCreatedDate":"2017-05-10T23:30:00.000-05:00","modifiedDate":"2017-05-10T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:09.831-05:00","docdate":"2017-05-10T23:30:00.000-05:00","docrefNum":"H012555","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Europe:Western_Europe:United_Kingdom_Western_Europe,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Fluids_Solids_Control:Waste_Management:Waste_Treatment_&_Disposal,Fluids_Solids_Control:Separation_&_Handling:Water_Treatment,"},{"title":"BaraXcel™ Fluid and Optimized SCE Systems Help Set Records in Marcellus Extended Laterals","description":"The Baroid team designed an integrated fluids and separation solution that would significantly increase ROP, reduce the LGS concentration to less than 8 percent, and also result in much dryer cuttings \u2013 thereby lowering disposal costs. Baroid recommended its BaraXcel™ high-performance NAF system, which contains no organophilic clay.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/baraxcel-fluid-set-records-in-marcellus-extended-laterals-case-study.pdf","docCreatedDate":"2019-06-05T13:25:00.000-05:00","modifiedDate":"2019-06-07T15:38:08.553-04:00","docdate":"2019-06-05T13:25:00.000-05:00","docrefNum":"H013271","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:North_America:United_States:West_Virginia,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"LCM Blend Stops Severe Losses in One Treatment","description":"Losses Cured with Blended BaraBlend®-665 and BaraLock®-666 LCM Pill, Resulting in Casing Run with 100 Percent Returns","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraBlend-665BaraLock-666Russia.pdf","docCreatedDate":"2016-04-20T23:30:00.000-05:00","modifiedDate":"2016-04-20T23:30:00.000-05:00","docdate":"2016-04-20T23:30:00.000-05:00","docrefNum":"H012129","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Asia:Northern_Asia:Russia_Northern_Asia,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"Integrated Reservoir Fluids and Sand Control Cut Costs for North Sea Operator","description":"Engineered solution enables well to be drilled in record time and under budget.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013211-baraxcel-rdif-sand-screen-cs.pdf","docCreatedDate":"2019-05-22T10:13:00.000-05:00","modifiedDate":"2019-05-22T16:08:44.095-04:00","docdate":"2019-05-22T10:13:00.000-05:00","docrefNum":"H013211","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Drilling_Operational_Efficiency,Fluids_Challenges:Solids_Control,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,"},{"title":"Operator Recovers 500+ bbl OBM, Saves $70K with Mobile Vertical","description":"An Operator Recovers 500+ bbl OBM, Saves $70K with Mobile Vertical Cuttings Dryer","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/MVCD-WasteManagement.pdf","docCreatedDate":"2015-03-31T23:30:00.000-05:00","modifiedDate":"2015-10-05T23:30:00.000-05:00","docdate":"2015-03-31T23:30:00.000-05:00","docrefNum":"H011973","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,North_America:United_States,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Cuttings_Dryers,Fluids_Solids_Control:Waste_Management,"},{"title":"Oman: HYDRO-GUARD® WBM Saves Six Days on Long 12-1/4-Inch Section with Reactive Clays, Potential Loss Zones","description":"The 12-1/4-inch section was the longest interval of the well, with a planned casing setting depth of approximately 3,600 meters (11,811 feet). Three reactive clay formations would be encountered while drilling this section: the Natih D, Nahr Umr, and Gharif shales. On previous wells, these formations had destabilized, resulting in excessive backreaming during trips and hole pack-off conditions.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HYDROGUARDOman.pdf","docCreatedDate":"2016-12-09T22:30:00.000-06:00","modifiedDate":"2016-12-09T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:02.587-05:00","docdate":"2016-12-09T22:30:00.000-06:00","docrefNum":"H012393","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:Oman_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Custom Baroid Solids Control Strategy Helps Operator Save $1+ Million per Extended Reach Well","description":"Customized Baroid system solves drilling challenges and delivers higher levels of performance","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012521.pdf","docCreatedDate":"2017-10-22T23:30:00.000-05:00","modifiedDate":"2017-10-31T23:30:00.000-05:00","docdate":"2017-10-22T23:30:00.000-05:00","docrefNum":"H012521","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Solids_Control,|brandgroups:Baroid,|locations:South_America:Brazil_Eastern_South_America,Global,|prodgroups:Fluids_Solids_Control:Solids_Control:Engineering_Services,Fluids_Solids_Control:Surface_Solutions,Fluids_Solids_Control:Solids_Control,"},{"title":"Canada: Optimized Brine and ENVIROMUL™ Fluids Help Cut Drilling Days of Pacesetter Shale Well By 32 Percent","description":"Through careful collaboration and the use of optimized drilling systems, the operator was able to drill the well in 9.2 days, saving 4.4 days valued at approximately USD 639,000.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/ENVIROMUL-Canada.pdf","docCreatedDate":"2016-11-08T22:30:00.000-06:00","modifiedDate":"2016-11-08T22:30:00.000-06:00","docdate":"2016-11-08T22:30:00.000-06:00","docrefNum":"H012355","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Baroid,|locations:North_America:Canada,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"Optimized displacement using CFS™-648 casing cleaner delivers","description":"Optimized displacement using CFS™-648 casing cleaner delivers\nsuccessful wellbore cleanout with restricted pipe movement.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HO11857CFS648CasingCleanerFINAL.pdf","docCreatedDate":"2015-07-15T23:30:00.000-05:00","modifiedDate":"2015-07-15T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:04.156-05:00","docdate":"2015-07-15T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Displacements_Effective_Displacements,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Displacement_Systems,"},{"title":"Mexico: BOREMAX® High-Performance Water-Based Fluid Helped Reduce Operational Cost & Non-Productive Time","description":"To reach the Upper Pliocene formation, Industrias Costa Mesa needed to drill through the Paraje Solo formation \u2013 which consisted of sands and sedimented clay in a shallow water environment. This section was to be drilled vertical with a 26\u201d bit and conventional bottom hole assembly up to 3,280 ft. mud depth.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011542.pdf","docCreatedDate":"2014-12-01T22:30:00.000-06:00","modifiedDate":"2014-12-30T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:48.501-05:00","docdate":"2014-12-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Drill_String_Torque_Drag_Reduction,|brandgroups:Baroid,|locations:North_America:Mexico,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Optimized ENVIROMUL™ Fluid and WellSET® Treatments Help Save Costs on Horizontal Monobore Well","description":"In a horizontal well profile, a monobore design is drilled as a single-diameter hole from the\nsurface casing to total depth (TD).","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012723.pdf","docCreatedDate":"2017-11-13T22:30:00.000-06:00","modifiedDate":"2017-11-13T22:30:00.000-06:00","docdate":"2017-11-13T22:30:00.000-06:00","docrefNum":"H012723","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges,Fluids_Challenges,Borehole_Challenges,Reducing_Costs,|brandgroups:Baroid,|locations:Global,North_America:Canada,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraECD® NAF Delivers Consistent Wellbore Stability in Deepwater Well, Saving 24 Days of Rig Time","description":"High-Performance Fluid System Optimizes Drilling Operation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012869.pdf","docCreatedDate":"2018-02-06T22:30:00.000-06:00","modifiedDate":"2018-03-07T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:28.978-05:00","docdate":"2018-02-06T22:30:00.000-06:00","docrefNum":"H012869","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraMesh® Shaker Screens Outlast Competitor\u2019s Screens and Cut Costs by $7.5k per Well","description":"BaraMesh® Shaker Screens Outlast Competitor\u2019s\nScreens and Cut Costs by $7.5k per Well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraMeshScreensSUSSouthTexas.pdf","docCreatedDate":"2015-06-09T23:30:00.000-05:00","modifiedDate":"2015-06-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:01.078-05:00","docdate":"2015-06-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Cuttings_Handling_and_Disposal,Fluids_Challenges:Fluid_Loss,Fluids_Challenges:Solids_Control,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,Fluids_Solids_Control:Solids_Control:Solids_Control_Equipment_and_Screens,"},{"title":"LSNAF System Increases Productivity in HPHT Wells","description":"Åsgardfield in the Norwegian Sea is characterized as having high-temperature, high-pressure field with low permeability sandstone.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H08340.pdf","docCreatedDate":"2011-03-01T22:30:00.000-06:00","modifiedDate":"2017-11-10T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:15.663-05:00","docdate":"2011-03-01T22:30:00.000-06:00","docrefNum":"H08340","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Barite_Sag,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),Reservoir_Challenges:High_Temperature,Reservoir_Challenges:High_Pressure,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Wellbore_Integrity,Formation_Challenges:Damaged_Formations,Well_Control_Challenges:Lost_Circulation,Deepwater,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:North_Sea,Europe,Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Fluids_Solids_Control:Completion_Fluids_and_Filtration:Completion_Fluid_Additives,Fluids_Solids_Control:Completion_Fluids_and_Filtration,Fluids_Solids_Control,"},{"title":"BARADRIL-N® system delivers reservoir, replaces formate system","description":"BARADRIL-N® reservoir drill-in fluid (RDF-615) helps operator achieve\nsuccessful screen installation and save five days of rig time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BARADRIL-N-RDF-615.pdf","docCreatedDate":"2016-01-13T22:30:00.000-06:00","modifiedDate":"2016-01-13T22:30:00.000-06:00","docdate":"2016-01-13T22:30:00.000-06:00","docrefNum":"H012052","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Fluids_Solids_Control:Reservoir_Drilling_Fluids,"},{"title":"CLAYSEAL® PLUS™ Shale Stabilizer and BARACOR® 95™ Corrosion Inhibitor Save Four Days of Rig Time","description":"Solution helps minimize wellbore instability.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CLAYSEALPLUS-BARACOR95.pdf","docCreatedDate":"2016-07-20T23:30:00.000-05:00","modifiedDate":"2016-07-20T23:30:00.000-05:00","docdate":"2016-07-20T23:30:00.000-05:00","docrefNum":"H011733","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Global,South_America:Colombia_Northern_South_America,"},{"title":"UK: BaraKlean® Solutions and CFG™ Modeling Remediate Prior Issues, Enabling Successful Completion","description":"An effective displacement and wellbore cleanup are typically achieved with a combination of\nchemistry, engineering, and best field practices. Failure to address any of these aspects can\nquickly consume additional fluids, logistics, and rig resources. When planning cleanup and\ndisplacement operations, the designer should anticipate issues such as cleaning efficiency, and\nshould address equipment limitations and mitigate potential problems such as surface volumes.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraKlean648CFG-UK.pdf","docCreatedDate":"2016-12-14T22:30:00.000-06:00","modifiedDate":"2016-12-14T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:02.587-05:00","docdate":"2016-12-14T22:30:00.000-06:00","docrefNum":"H012409","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Europe:Western_Europe:United_Kingdom_Western_Europe,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Real_Time_Services,Fluids_Solids_Control:Displacement_Systems,"},{"title":"US Texas: STOPPIT® LCM enables recovery from total losses","description":"After landing the curve at 90° in an 8 ¾-inch Granite Wash well, the operator experienced complete lost returns. An 8.1 lb/gal INVERMUL™ invert emulsion system was being used while drilling with a 6 ½-inch turbine assembly down hole.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09684.pdf","docCreatedDate":"2012-09-01T23:30:00.000-05:00","modifiedDate":"2014-07-03T23:30:00.000-05:00","docdate":"2012-09-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:North_America,North_America:United_States,North_America:United_States:Texas,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"Integrated Approach to Fluid Performance Reduces Days on Well by 30 Percent","description":"Real-time Monitoring and Optimized Fluid Properties Eliminate Stuck Pipe and High NPT Costs","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraLogix-BaraXcel-BSS-Marcellus.pdf","docCreatedDate":"2019-09-23T11:06:22.731-04:00","modifiedDate":"2019-09-23T11:06:22.731-04:00","docdate":"2019-09-23T11:06:22.731-04:00","docrefNum":"H013332","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Stuck_Pipe,Drilling_Challenges:Complex_Well_Trajectories,Drilling_Challenges:Improving_Drilling_Efficiency,|brandgroups:Baroid,|locations:Global,North_America:United_States:Pennsylvania,"},{"title":"Applied Fluids Optimization (AFO) Service Enables Cross-Discipline Collaboration in Operator\u2019s RTOC","description":"Applied Fluids Optimization Service Expands and Integrates RTOC Wellsite Data Analysis Functions for More Accurate Modeling of Downhole Conditions","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h07901.pdf","docCreatedDate":"2010-09-01T23:30:00.000-05:00","modifiedDate":"2017-07-10T23:30:00.000-05:00","docdate":"2010-09-01T23:30:00.000-05:00","docrefNum":"H07901","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Real_Time_Decisions,|brandgroups:Baroid,|locations:Europe,Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Fluids_Solids_Control,Real_Time_Services,Fluids_Solids_Control:Fluids_Support_Services:Fluids_Technical_Support,Real_Time_Services:Real_Time_Applications,Optimization_Services:Drilling_Optimization:Hydraulics_Management,Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"Colombia: Customized Shale Control Sweeps Prevent Instability in Reservoir, Saves $80K in Rig Time","description":"Most horizontal oil wells in the Castilla field are drilled using a geo-navigational technique that improves hydrocarbon recovery, but also brings wellbore stability challenges. The operator had experienced pack off incidents with both the bottomhole assembly (BHA) and the liner due to exposure to reactive shale. To avoid damaging the reservoir, the proposed treatment had to be applied very precisely.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STEELSEAL-25-Wellbore-Stability-Colombia.pdf","docCreatedDate":"2015-01-30T22:30:00.000-06:00","modifiedDate":"2015-01-30T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:49.688-05:00","docdate":"2015-01-30T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Global,South_America:Colombia_Northern_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,"},{"title":"Saudi Arabia: Inhibitive HYDRO-GUARD® System and Engineered Lost Circulation Blend Save 5 Days in Complex Wellbore","description":"Multiple severe loss zones were encountered on offset wells, ranging in depth from 5,100 ft to near total depth at approximately 9,500 ft total vertical depth (TVD). Heavy lost circulation material (LCM) treatments and cement plugs were only partially effective in reducing losses. The complex wellbore also presented potential issues with swelling shale, gas/salt water influxes and differential sticking, all of which had been observed on offsets. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011535.pdf","docCreatedDate":"2014-12-01T22:30:00.000-06:00","modifiedDate":"2015-01-09T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:47.490-05:00","docdate":"2014-12-01T22:30:00.000-06:00","docrefNum":"H011535","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,|brandgroups:Baroid,|locations:Global,Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"PERFORMADRIL Maintains Wellbore Stability & Eliminates Cutting Costs on Challenging Deepwater Angola Project","description":"PERFORMADRIL® System Helps Maintain Wellbore Stability and Eliminate Cuttings Costs\non Challenging Deepwater Angola Project","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/PERFORMADRIL-Angola.pdf","docCreatedDate":"2016-08-01T23:30:00.000-05:00","modifiedDate":"2016-08-01T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:50.834-05:00","docdate":"2016-08-01T23:30:00.000-05:00","docrefNum":"H012260","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Africa:Southern_Africa:Angola_Southern_Africa,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"BaraKlean®-926 Casing Cleaner Delivers Fast, Effective Results","description":"Saving USD 30000 per well in costs and rig time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013339.pdf","docCreatedDate":"2019-08-15T09:28:09.766-04:00","modifiedDate":"2019-08-15T09:28:09.766-04:00","docdate":"2019-08-15T09:28:09.766-04:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Extended_Reach_Drilling_(ERD),Drilling_Challenges:Improving_Drilling_Efficiency,Drilling_Challenges:Optimize_Drilling_Conditions,|locations:Global,Middle_East:United_Arab_Emirates_Middle_East,"},{"title":"BaraShale™ Lite Fluid System Helps Achieve Superior Cost Control in Unconventional Wells","description":"The BaraShale Lite fluid system achieved the primary objective of reducing cost in all aspects of the drilling process. Aggregate cost savings of approximately USD 854,000 were realized for the first seven wells. This was mainly due to a 70 percent reduction in waste haul-offs, as well as savings from reduced washouts and lower cement volumes.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/barashale-lite-fluid-system-case-study.pdf","docCreatedDate":"2019-05-01T09:43:00.000-05:00","modifiedDate":"2019-06-07T15:38:08.707-04:00","docdate":"2019-05-01T09:43:00.000-05:00","docrefNum":"H013272","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:North_America:United_States:Texas,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Baroid Slurry Handling System Provides Cost-Effective Waste Disposal Solution","description":"System enables operator to achieve zero discharge while drilling in environmentally sensitive area","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012783.pdf","docCreatedDate":"2017-12-15T22:30:00.000-06:00","modifiedDate":"2017-12-17T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:24.274-05:00","docdate":"2017-12-15T22:30:00.000-06:00","docrefNum":"H012783","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Management,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Waste_Management,Fluids_Solids_Control:Surface_Solutions,Fluids_Solids_Control:Waste_Management:Waste_Treatment_&_Disposal,"},{"title":"US Colorado: Dual HH-5500 Centrifuge Dewatering Units Successfully Maintain Mud Weights while Drilling through Surface and Intermediate Sections","description":"Halliburton Baroid implemented dual HH-5500 centrifuge dewatering units with an updated Enviro-Floc® unit which provided the customer with the ability to process fluids at a much higher rate.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010967.pdf","docCreatedDate":"2014-02-01T22:30:00.000-06:00","modifiedDate":"2014-02-27T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:39.145-05:00","docdate":"2014-02-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Mud_Weight_Management,|brandgroups:Baroid,|locations:North_America:United_States:Colorado,|prodgroups:Fluids_Solids_Control:Solids_Control:Dewatering_Systems,"},{"title":"HYDRO-GUARD® System Enables Operator to Achieve Drilling Record in Horizontal Well","description":"System delivers significant cost savings and operational efficiencies","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012790.pdf","docCreatedDate":"2018-01-12T22:30:00.000-06:00","modifiedDate":"2018-01-12T22:30:00.000-06:00","docdate":"2018-01-12T22:30:00.000-06:00","docrefNum":"H012790","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges,|brandgroups:Baroid,|locations:Global,Asia:Southern_Asia:Pakistan_Southern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"HYDRO-GUARD® system and STEELSEAL® LCM help eliminate casing run","description":"HYDRO-GUARD® system and STEELSEAL® LCM bridging treatment\nhelp eliminate casing run in depleted zones","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HYDROGUARD-STEELSEAL-Saudi.pdf","docCreatedDate":"2016-02-02T22:30:00.000-06:00","modifiedDate":"2016-07-22T23:30:00.000-05:00","docdate":"2016-02-02T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,"},{"title":"BaraPure® Salt-Free NAF System Improves Performance in Canada","description":"BaraPure® Salt-Free NAF System\nSuccessfully Drills 8,900 Meters in Unconventional Field","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraPureCanada.pdf","docCreatedDate":"2016-08-05T23:30:00.000-05:00","modifiedDate":"2017-09-26T23:30:00.000-05:00","docdate":"2016-08-05T23:30:00.000-05:00","docrefNum":"H012238","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Baroid,|locations:North_America:Canada,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraXcel™ NAF and DFG™ Modeling Software Help Operator Eliminate Casing String on Permian Basin Wells","description":"BaraXcel™ NAF and DFG™ Modeling Software Help Operator Eliminate Casing String on Permian Basin Wells","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011685.pdf","docCreatedDate":"2018-08-09T23:30:00.000-05:00","modifiedDate":"2018-08-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:32.238-05:00","docdate":"2018-08-09T23:30:00.000-05:00","docrefNum":"H011685","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,North_America:United_States,|prodgroups:Real_Time_Services:Real-Time_&_Automation_Services,Fluids_Solids_Control:Conventional_Invert_Emulsion_Systems,"},{"title":"Combo LCM Pill Stems Losses in Deeply Fractured Carbonate Formation","description":"LCM treatment saves operator approximately USD 600,000","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraBlend-657-BaraLock-666.pdf","docCreatedDate":"2017-11-08T22:30:00.000-06:00","modifiedDate":"2017-11-08T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:20.911-05:00","docdate":"2017-11-08T22:30:00.000-06:00","docrefNum":"H012762","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:South_America:Brazil_Eastern_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,"},{"title":"Canada: Drilling Fluids Graphics (DFG™) software allows Operator to save rig time and successfully drill challenging HPHT well in Western Canada","description":"Drilling Fluids Graphics (DFG™) with DrillAhead® Hydraulics Modeling Software was utilized during planning and execution of the well. Baroid personnel were able to accurately model multiple characteristics for four different sections of the well, and the operator followed these models to reduce non-productive time (NPT).","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010869.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2015-09-14T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:37.669-05:00","docdate":"2013-11-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Temperature:High_Temperature_(300F),Reservoir_Challenges:High_Pressure:High_Pressure_(10K),|brandgroups:Baroid,|locations:North_America:Canada,|prodgroups:Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"Static loss rate drops to zero after use of DUO-SQUEEZE® R LCM pills","description":"Plugging Perforations with Engineered DUO-SQUEEZE® R LCM Pills Saves Operator US$200,000 on Sidetrack Operation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/DUO-SQUEEZE-R-1-Qatar.pdf","docCreatedDate":"2015-12-02T22:30:00.000-06:00","modifiedDate":"2015-12-02T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:20.091-05:00","docdate":"2015-12-02T22:30:00.000-06:00","docrefNum":"H012015","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Global,Middle_East:Qatar_Middle_East,|prodgroups:Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,"},{"title":"EZ SPOT® Pill Assists in Freeing Differentially Stuck Pipe While Reaming in Section","description":"While drilling a horizontal well in the Vankor Field of Eastern Siberia, Russia, an operator was challenged to overcome the following difficult well profile when drilling into the Nizhnekhetsk formations","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010745.pdf","docCreatedDate":"2013-08-01T23:30:00.000-05:00","modifiedDate":"2017-09-25T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:31.786-05:00","docdate":"2013-08-01T23:30:00.000-05:00","docrefNum":"H010745","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Stuck_Pipe,|brandgroups:Baroid,|locations:Global,Asia:Northern_Asia:Russia_Northern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,"},{"title":"BARAFLAKE® acid-soluble lost circulation material pill cures losses","description":"BARAFLAKE® acid-soluble lost circulation material (LCM) pill cures\nlosses in deepwater carbonate reservoir","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HO11814BARAFLAKECaseStudy.pdf","docCreatedDate":"2015-07-15T23:30:00.000-05:00","modifiedDate":"2015-07-15T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:04.156-05:00","docdate":"2015-07-15T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Lost_Circulation-Reservoir_Challenges,Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Global,|prodgroups:Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,"},{"title":"BARO-LUBE GOLD SEAL™ Lubricant Reduces Metal-on-Metal Friction Between Coiled-Tubing and Drillstring","description":"After experiencing stuck pipe, the operator was unable to run wireline past 11,900 feet through the drill string to achieve a free point log. Coil tubing was then used to cleanout the interior of the drill string to run logs. However, the coil tubing unit was not able to get below 11,800 feet because of high friction in the 47 degree wellbore","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09817.pdf","docCreatedDate":"2012-09-01T23:30:00.000-05:00","modifiedDate":"2018-01-12T22:30:00.000-06:00","docdate":"2012-09-01T23:30:00.000-05:00","docrefNum":"H09817","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Stuck_Pipe,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lubricants-Baroid,"},{"title":"N-FLOW™ 325 Breaker System Frees Differentially Stuck Pipe in Depleted Sand, Saving USD 1.1M","description":"Successful breaker treatment saves operator several days of rig time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/N-FLOW325BreakerOman.pdf","docCreatedDate":"2017-02-17T22:30:00.000-06:00","modifiedDate":"2017-09-19T23:30:00.000-05:00","docdate":"2017-02-17T22:30:00.000-06:00","docrefNum":"H012465","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:Oman_Middle_East,|prodgroups:Fluids_Solids_Control:Breaker_Systems,"},{"title":"Customized Fluid System Cuts Intermediate Casing Costs in Mississippi Lime Field","description":"In the Mississippi Lime field, the curve section of the wells entail drilling through a reactive shale where swelling and caving can cause hole stability problems. in previous wells, the 7\" casing has always been set in the top of the lime through the curve to provide sufficient stability for running a 4 ½-inch production liner. In this case, the operator requested a solution that would enable the Mississippi Lime to be drilled without setting the 7-inch intermediate casing.\n","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010285.pdf","docCreatedDate":"2013-06-01T23:30:00.000-05:00","modifiedDate":"2017-07-10T23:30:00.000-05:00","docdate":"2013-06-01T23:30:00.000-05:00","docrefNum":"H010285","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,Fluids_Challenges:Fluid_Loss,Well_Control_Challenges:Ensure_Well_Integrity,|brandgroups:Baroid,|locations:North_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,"},{"title":"UK North Sea: BaraKlean®-648 Casing Cleaner Provides Client with Optimized Displacement, Superior Environmental Performance","description":"When a client needed an optimal casing cleanout that would minimize the volume of waste\nand be environmentally safe, Halliburton Baroid provided its BaraKlean®-648 casing cleaner\nand Completion Fluids Graphics (CFG™) displacement modeling software, thus saving the\nclient hours on the displacement and thousands of dollars in cleanout costs.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraKlean648NorthSea.pdf","docCreatedDate":"2016-10-11T23:30:00.000-05:00","modifiedDate":"2016-10-11T23:30:00.000-05:00","docdate":"2016-10-11T23:30:00.000-05:00","docrefNum":"H012300","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Europe:Western_Europe:United_Kingdom_Western_Europe,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Fluids_Solids_Control:Displacement_Systems,"},{"title":"Perfect displacement achieved despite restricted pump rate","description":"Displacement optimized with BaraKlean-648 casing cleaner delivers successful wellbore cleanout with restricted pump rate","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CFS-648Displacement.pdf","docCreatedDate":"2016-01-13T22:30:00.000-06:00","modifiedDate":"2016-04-14T23:30:00.000-05:00","docdate":"2016-01-13T22:30:00.000-06:00","docrefNum":"H012054","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Europe:Western_Europe:United_Kingdom_Western_Europe,Global,|prodgroups:Fluids_Solids_Control:Displacement_Systems,"},{"title":"Production quadruples after N-FLOW™ 325 treatment","description":"Delayed-reaction N-FLOW™ 325 breaker system helps increase\nproduction from 1,000 bbl/day to 4,000 bbl/day","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/N-FLOW-Production.pdf","docCreatedDate":"2015-11-24T22:30:00.000-06:00","modifiedDate":"2015-11-24T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:18.536-05:00","docdate":"2015-11-24T22:30:00.000-06:00","docrefNum":"H012019","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Middle_East:Qatar_Middle_East,Global,|prodgroups:Fluids_Solids_Control:Breaker_Systems,"},{"title":"N-FLOW™ 325 treatment boosts production from 100 bpd to 600 bpd","description":"Delayed-reaction N-FLOW™ 325 breaker system helps increase production\nfrom 100 bbl/day to 600 bbl/day, saving US$500,000 in rig time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/N-FLOW-NPT.pdf","docCreatedDate":"2015-11-24T22:30:00.000-06:00","modifiedDate":"2015-11-24T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:17.330-05:00","docdate":"2015-11-24T22:30:00.000-06:00","docrefNum":"H012021","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,Middle_East:Qatar_Middle_East,|prodgroups:Fluids_Solids_Control:Breaker_Systems,"},{"title":"Russia: BOREMAX® fresh-Water System reduces costs and enables drilling of interval in one-third of expected time","description":"An operator working in Russia\u2019s Kharyaga Field wished to improve penetration rate and reduce non productive time (NPT), caused by overloading of the solids control equipment and flowline plugging.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09302.pdf","docCreatedDate":"2012-07-01T23:30:00.000-05:00","modifiedDate":"2012-07-11T23:30:00.000-05:00","docdate":"2012-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Minimization:Water_Based-Waste_Minimization,Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,|brandgroups:Baroid,|locations:Asia:Northern_Asia:Russia_Northern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Inhibitive_Water_Based_Systems,"},{"title":"Engineered HYDRO-PLUG® Pill Dramatically Cuts Loss Rate in Fractured Limestone","description":"Upon spotting the pill, drilling resumed from 1,858 meters (6,096 feet) to 2,060 meters (6,758\nfeet), but the average loss rate was 180 bbl/hr. Bapetco was unable to continue drilling to the\nplanned interval total depth (TD).","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HYDROPLUG-FracturedLimestone.pdf","docCreatedDate":"2017-09-26T23:30:00.000-05:00","modifiedDate":"2017-09-26T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:16.564-05:00","docdate":"2017-09-26T23:30:00.000-05:00","docrefNum":"H012665","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,|brandgroups:Baroid,|locations:Africa:Northern_Africa:Egypt_Northern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"Inhibitive Seawater-Based Fluid Saves US$130k on Offshore Well","description":"36 hours saved in rig time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/EZMud-CLAYSEALPLUS.pdf","docCreatedDate":"2016-05-16T23:30:00.000-05:00","modifiedDate":"2016-05-16T23:30:00.000-05:00","docdate":"2016-05-16T23:30:00.000-05:00","docrefNum":"H012158","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:North_America:Mexico,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,"},{"title":"BaraGel™ W-602 Cross-Linked Gel System Delivers Deepwater","description":"After pumping an 8-bbl pill, losses stopped completely, saving operator over $400,000","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CFS-602-LostCirculation.pdf","docCreatedDate":"2016-10-31T23:30:00.000-05:00","modifiedDate":"2016-10-31T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:12.414-05:00","docdate":"2016-10-31T23:30:00.000-05:00","docrefNum":"H011749","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Completion_Fluids_and_Filtration,Fluids_Solids_Control:Drilling_Fluid_Additives:Filtrate_Control_Agents-Baroid,"},{"title":"US Colorado: Use of SHALEDRIL® Water-Based Drilling Fluid Successfully Mitigates Intermediate Casing Run, Saving Operator Approximately $250,000","description":"In the DJ Basin of Weld County, Colorado, Baroid recommended SHALEDRIL®, its inhibitive water-based system specifically formulated to help combat swelling and sloughing of shale while drilling. The customized fluid system enabled the operator to successfully drill to TD without the time and expense of running 7-inch intermediate casing, saving approximately $250,000.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010121.pdf","docCreatedDate":"2013-04-01T23:30:00.000-05:00","modifiedDate":"2013-05-31T23:30:00.000-05:00","docdate":"2013-04-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Improve_Wellbore_Integrity,|brandgroups:Baroid,|locations:North_America:United_States:Colorado,Global,North_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids_Solutions,"},{"title":"Qatar: N-FLOW™ 325 Filter Cake Breaker Applied in Long Reservoir Helps Increase Production 75%","description":"The operator wanted to stimulate the entire 3,741 m length of the reservoir by placing N-FLOW™ 325 filter cake breaker 325 inside the 8-1/2-in. open hole from 6,041 m to 4,923 m and inside the 6-5/8-in. perforated liner back to 2,300 m. Based on the Baroid global database, this would be the largest N-FLOW application performed to date. The calculated required volume was 159 m3 (1,000 bbl), including 10% excess, to stimulate 3,741 m of hole.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/N-FLOW-Delay-Time-Qatar.pdf","docCreatedDate":"2015-01-01T22:30:00.000-06:00","modifiedDate":"2015-02-02T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:49.688-05:00","docdate":"2015-01-01T22:30:00.000-06:00","docrefNum":"H011600","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Filter_Cake_Removal,|brandgroups:Baroid,|locations:Global,Middle_East:Qatar_Middle_East,|prodgroups:Fluids_Solids_Control:Wallcake_Breaker,Fluids_Solids_Control:Reservoir_Fluids_Solutions,Fluids_Solids_Control:Reservoir_Drilling_Fluids,Fluids_Solids_Control:Breaker_Systems,"},{"title":"High-Performance Fluid System Enables Low-Pressure Circulation During Challenging Scab-Liner Run","description":"Major operator recently attempted to run and cement a 12,000-ft scab liner in a well located in the Gulf of Mexico (GOM).","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010752.pdf","docCreatedDate":"2013-08-01T23:30:00.000-05:00","modifiedDate":"2017-09-25T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:32.993-05:00","docdate":"2013-08-01T23:30:00.000-05:00","docrefNum":"H010752","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:North_America:United_States:Louisiana,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids_Solutions,"},{"title":"BaraFLC®-903 Additive Stops Wellbore Instability and Reduces Treatment Cost by 30 Percent","description":"ENGINEERED WBM FORMULATION BRIDGES MICRO-FRACTURES TO PREVENT SHALE HYDRATION AND DECREASE HP/HT FLUID LOSS","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013212-barablc-903-oman-cs.pdf","docCreatedDate":"2019-04-19T14:00:00.000-05:00","modifiedDate":"2019-05-22T16:08:43.803-04:00","docdate":"2019-04-19T14:00:00.000-05:00","docrefNum":"H013212","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,Formation_Challenges:Shale,|brandgroups:Baroid,|locations:Global,Middle_East:Oman_Middle_East,"},{"title":"GOM: Customized Solids-Free Displacement Spacer Delivers Clean Fluid and Saves Filtration","description":"Baroid was requested to conduct a displacement in a deviated\nwell in a water depth of more than 8,000 feet (2,438 meters).\nThis followed a poor experience with a competitor\u2019s system, and\nincluded a request to avoid the use of solid weighting agents.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraKlean-GOM.pdf","docCreatedDate":"2017-01-12T22:30:00.000-06:00","modifiedDate":"2017-01-12T22:30:00.000-06:00","docdate":"2017-01-12T22:30:00.000-06:00","docrefNum":"H012390","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Displacement_Systems,"},{"title":"STICK-LESS 20® lubricant beads smooth the path for whipstock","description":"STICK-LESS 20® Lubricant Beads Reduce Drag 85\u201390% and Enable Whipstock to Reach Target Depth","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STICK-LESS-20-Qatar.pdf","docCreatedDate":"2015-12-02T22:30:00.000-06:00","modifiedDate":"2015-12-02T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:20.091-05:00","docdate":"2015-12-02T22:30:00.000-06:00","docrefNum":"H012017","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:Qatar_Middle_East,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lubricants-Baroid,"},{"title":"BaraECD® NAF Enables Operator to Use One Fluid for All Drilling Intervals","description":"Baroid Fluid Solution optimizes drilling operations","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012777.pdf","docCreatedDate":"2018-01-12T22:30:00.000-06:00","modifiedDate":"2018-01-12T22:30:00.000-06:00","docdate":"2018-01-12T22:30:00.000-06:00","docrefNum":"H012777","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges,|brandgroups:Baroid,|locations:Global,Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"DFG™ software helps formulate proper weighted pill density to improve wellbore stability","description":"Drilling Fluids Graphics (DFG™) software helps formulate proper weighted pill density to improve wellbore stability","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/DFG-WellboreStability.pdf","docCreatedDate":"2015-04-30T23:30:00.000-05:00","modifiedDate":"2015-10-02T23:30:00.000-05:00","docdate":"2015-04-30T23:30:00.000-05:00","docrefNum":"H011746","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,North_America:United_States,|prodgroups:Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"BaraPhase™ TCC Proves Key for Zero-Discharge Waste Management","description":"Baroid Solution efficiently transfers, processes, and stores drilling waste for offshore operations","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012797.pdf","docCreatedDate":"2018-01-10T22:30:00.000-06:00","modifiedDate":"2018-01-11T22:30:00.000-06:00","docdate":"2018-01-10T22:30:00.000-06:00","docrefNum":"H012797","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges,|brandgroups:Baroid,|locations:Global,Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Thermal_Treatment,Fluids_Solids_Control:Solids_Control:Engineering_Services,"},{"title":"HYDRO-GUARD® WBM Outdrills Conventional OBM in Reactive Shales","description":"HIGH-PERFORMANCE FLUID SOLUTION STABILIZES DRILLING IN COMPLEX SHALE FORMATION","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013243-hydroguard-cs.pdf","docCreatedDate":"2019-05-22T15:26:00.000-05:00","modifiedDate":"2019-05-22T16:37:42.750-04:00","docdate":"2019-05-22T15:26:00.000-05:00","docrefNum":"H013243","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Shale,Fluids_Challenges:ROP_Enhancement,|brandgroups:Baroid,|locations:Global,Middle_East:Kuwait_Middle_East,"},{"title":"Successful Indirect Displacement and Wellbore Cleanout in High-Angle Deepwater Well Saves 24 Hours of Rig Time ","description":"An operator in the Gulf of Mexico planned an indirect displacement to seawater on its Auger platform while holding constant backpressure in a high-angle well (63° maximum deviation). ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/cleanwell-solutions-gom-shell.pdf","docCreatedDate":"2019-02-01T13:34:00.000-06:00","modifiedDate":"2019-04-17T15:24:03.954-04:00","docdate":"2019-02-01T13:34:00.000-06:00","docrefNum":"H012976","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools,Fluids_Solids_Control:Displacement_Systems,"},{"title":"Custom Water-Based Fluid Achieves New Drilling Record in Iraq\u2019s Rumaila Field","description":"Customized Fluid Systems saves 6.4 days of operation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012747.pdf","docCreatedDate":"2017-11-10T22:30:00.000-06:00","modifiedDate":"2017-11-10T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:21.680-05:00","docdate":"2017-11-10T22:30:00.000-06:00","docrefNum":"H012747","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Shale,|brandgroups:Baroid,|locations:Middle_East:Iraq_Middle_East,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,"},{"title":"BaraKlean-648 cleaner strips heavy wax from completion assembly","description":"BaraKlean-648 casing cleaner helps remove wax in wellbore cleanout limited by low pit and pump rate capacities","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CFS-648WaxRemoval.pdf","docCreatedDate":"2016-01-13T22:30:00.000-06:00","modifiedDate":"2016-04-14T23:30:00.000-05:00","docdate":"2016-01-13T22:30:00.000-06:00","docrefNum":"H012053","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Fluids_Solids_Control:Displacement_Systems,"},{"title":"Customized Kill Mud Enables Operator to Abandon Well Ahead of Time, Saving USD 1 Million","description":"» Minimize ECD while working with collapsed tubing\n» Develop a low-solids/low-rheology kill-weight mud within a tight time frame","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012666.pdf","docCreatedDate":"2017-10-16T23:30:00.000-05:00","modifiedDate":"2017-10-16T23:30:00.000-05:00","docdate":"2017-10-16T23:30:00.000-05:00","docrefNum":"H012666","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges:Abandonment,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Fluids_Solids_Control:Drilling_Fluids_Solutions,Fluids_Solids_Control:Fluids_Engineering,"},{"title":"Optimized LCM Treatment Save Three Drilling Days","description":"NARROW MARGIN CALLS FOR BARAXCEL™ FLUID AND PROACTIVE LOSS TREATMENT","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013246-baralcm.pdf","docCreatedDate":"2019-04-19T15:03:00.000-05:00","modifiedDate":"2019-05-22T16:08:44.176-04:00","docdate":"2019-04-19T15:03:00.000-05:00","docrefNum":"H013246","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,Drilling_Challenges:Improving_Drilling_Efficiency,Deepwater:Increase_Reliability,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Global,"},{"title":"Optimized Fluids Help Operator Save $2.96 Million","description":"Solution saves 37 days of drilling time, achieving field record","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BOREMAX-INVERMUL.pdf","docCreatedDate":"2016-04-27T23:30:00.000-05:00","modifiedDate":"2016-04-27T23:30:00.000-05:00","docdate":"2016-04-27T23:30:00.000-05:00","docrefNum":"H012130","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|locations:North_America:Mexico,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Netherlands: Hollow-Glass Spheres allow Drilling Fluid Densities as Low as 0.8 SG","description":"An operator intended to develop a low pressure gas reservoir in a sandstone formation and the reservoir had been depleted by previous production. The fracture gradient, already low in the virgin reservoir, was anticipated to be significantly reduced. Lost circulation and formation damage were recognized as significant drilling hazards. A low density drilling fluid was required to drill and complete the low pressure environment.\n","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010280.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2013-11-12T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:35.312-05:00","docdate":"2013-11-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,Formation_Challenges:Damaged_Formations,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:Netherlands_Western_Europe,|prodgroups:Fluids_Solids_Control:Reservoir_Fluids_Solutions,Fluids_Solids_Control:Drilling_Fluids_Solutions,Fluids_Solids_Control:Drilling_Fluid_Additives,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"GOM: BARADRIL-N CT fluid yields effective deepwater coiled-tubing cleanout in one circulation","description":"Versatile drill-in fluid replaces high-viscosity sweeps, saving operator time and money","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/US-GOM-BARADRILNCT.pdf","docCreatedDate":"2016-10-07T23:30:00.000-05:00","modifiedDate":"2016-10-07T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:58.062-05:00","docdate":"2016-10-07T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:DRIL-N_Fluids,"},{"title":"ENVIROMUL™ system helps operator drill wells in record time","description":"Well Drilled in 29 Days with ENVIROMUL™ Oil-Based Fluid,\n31% Faster than Previous Record Well in Field","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/ENVIROMUL-WellboreStability.pdf","docCreatedDate":"2015-09-15T23:30:00.000-05:00","modifiedDate":"2015-09-15T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:08.407-05:00","docdate":"2015-09-15T23:30:00.000-05:00","docrefNum":"H011938","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Asia:Southwestern_Asia:Azerbaijan_Southwestern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"Inhibitive HYDRO-GUARD® WBM Helps Set New Field Record, Saving USD 3 Million","description":"Baroid Solution stabilizes wellbore in reactive clays","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012744.pdf","docCreatedDate":"2017-11-08T22:30:00.000-06:00","modifiedDate":"2017-11-08T22:30:00.000-06:00","docdate":"2017-11-08T22:30:00.000-06:00","docrefNum":"H012744","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges,|brandgroups:Baroid,|locations:Global,Asia:Southern_Asia:Pakistan_Southern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Operator Gains Twice the Screen Life for Half the Cost, Using BaraMesh® Shaker Screens ","description":"Operator significantly cuts costs per well by replacing OEM screens with high-performance option.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/baramesh-screen.pdf","docCreatedDate":"2019-03-01T13:21:00.000-06:00","modifiedDate":"2019-04-17T15:31:17.030-04:00","docdate":"2019-03-01T13:21:00.000-06:00","docrefNum":"H013179","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,"},{"title":"Operator Overcomes Lost Circulation Problems","description":"BaraECD® High-Performance Non-Aqueous Fluid helps complete trouble-free cementing operation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012761.pdf","docCreatedDate":"2017-11-13T22:30:00.000-06:00","modifiedDate":"2017-11-13T22:30:00.000-06:00","docdate":"2017-11-13T22:30:00.000-06:00","docrefNum":"H012761","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"XLR-RATE™ ROP Enhancer Saves Two Days of Rig Time and US$250,000","description":"Solution helps prevent bit balling in reactive clay, displacing competitor.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/XLR-RATE.pdf","docCreatedDate":"2016-07-20T23:30:00.000-05:00","modifiedDate":"2016-07-20T23:30:00.000-05:00","docdate":"2016-07-20T23:30:00.000-05:00","docrefNum":"H011735","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:South_America:Colombia_Northern_South_America,"},{"title":"BDF™-610 Filtration Control Additive Enables Operator to Improve Well Performance","description":"Enable operator to decrease HPHT fluid losses and HSE risks, while improving wellbore stability and overall well performance","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012628.pdf","docCreatedDate":"2017-07-21T23:30:00.000-05:00","modifiedDate":"2017-07-21T23:30:00.000-05:00","docdate":"2017-07-21T23:30:00.000-05:00","docrefNum":"H012628","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,|brandgroups:Baroid,|locations:Europe:Northern_Europe:Norway_Northern_Europe,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Filtrate_Control_Agents-Baroid,"},{"title":"BaraShield®-664 lost circulation material (LCM) helps operator drill through severe loss zone, saves USD 227,000 and 2 1/2 days","description":"The Baroid team recommended treating the active mud system with 10 ppb of BaraShield®-664 LCM, prior to drilling into the Rival formation.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraShield-664-Lost-Circulation-US.pdf","docCreatedDate":"2015-12-03T22:30:00.000-06:00","modifiedDate":"2015-12-03T22:30:00.000-06:00","docdate":"2015-12-03T22:30:00.000-06:00","docrefNum":"H011611","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Baroid,|locations:North_America:United_States,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,"},{"title":"In Less Circulating Time, BaraKlean-648 Casing Cleaner Delivers Brine with less than 2% Solids","description":"BaraKlean-648 cleaner proved to be more powerful than\navailable alternatives and was ideally suited to the technical\nconstraints presented by this application.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CFS-648CFS-687GOM.pdf","docCreatedDate":"2016-02-12T22:30:00.000-06:00","modifiedDate":"2016-09-08T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:32.697-05:00","docdate":"2016-02-12T22:30:00.000-06:00","docrefNum":"H012041","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Displacement_Systems,"},{"title":"Malaysia: Designed ENVIROMUL HT Invert Emulsion Fluid Provides Effective Solution for Controlling ECD on Well with Narrow Drilling Window","description":"Baroid Fluid Services personnel engineered ENVIROMUL HT IEF, a customized invert emulsion fluid system that used fine grind 4.4 SG Barite as the weighting agent. The fluid was specifically engineered to provide ECD control in narrow margin wells while maintaining a low Sag Factor.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011328.pdf","docCreatedDate":"2014-09-02T23:30:00.000-05:00","modifiedDate":"2014-09-02T23:30:00.000-05:00","docdate":"2014-09-02T23:30:00.000-05:00","docrefNum":"H011328","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,Reservoir_Challenges:High_Temperature,Reservoir_Challenges:High_Pressure,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"Egypt: Engineered HYDRO-GUARD® High-Performance Water-Based Fluid and TORQ-TRIM® II Lubricant Saved Operator $1.5M While Drilling 8½\" Deviated Hole ","description":"An operator working in the Western Desert region of Egypt, planned to drill a deviated well with a 38 degree inclination. The required fluid hydrostatic pressure stabilizing the reactive shales resulted in a 3000 psi overbalance against the depleted 3700 psi reservoir sands pore pressure. Consequently, high torque and differential sticking was expected. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010965.pdf","docCreatedDate":"2014-03-01T22:30:00.000-06:00","modifiedDate":"2014-03-05T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:40.346-05:00","docdate":"2014-03-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Drilling_Challenges:Drill_String_Torque_Drag_Reduction,Drilling_Challenges:Stuck_Pipe,|brandgroups:Baroid,|locations:Africa:Northern_Africa,Africa:Northern_Africa:Egypt_Northern_Africa,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluid_Additives:Lubricants-Baroid,"},{"title":"HYDRO-GUARD® WBM eliminates zero-discharge concerns and related costs","description":"Successful deepwater well drilled with high-performance\nHYDRO-GUARD® water-based mud avoids zero-discharge costs","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HYDROGUARD-Angola.pdf","docCreatedDate":"2015-12-10T22:30:00.000-06:00","modifiedDate":"2015-12-10T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:21.561-05:00","docdate":"2015-12-10T22:30:00.000-06:00","docrefNum":"H012000","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Global,Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"BaraShield®-664 LCM Helps Deepwater Operator Drill with Zero Losses","description":"OPERATOR GAINS FULL ACCESS TO PAY ZONES AND SAVES RIG TIME","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013247-barashield-664.pdf","docCreatedDate":"2019-05-22T10:36:00.000-05:00","modifiedDate":"2019-05-22T16:08:43.678-04:00","docdate":"2019-05-22T10:36:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,Fluids_Challenges:Fluid_Services_Optimization,|brandgroups:Baroid,|locations:Global,"},{"title":"Engineered BaraXcel™ Drilling Fluid System Doubles Production","description":"CLAY-FREE NON-AQUEOUS FLUID SYSTEM LOWERS ECD AND SAVES 18 DAYS OF RIG TIME","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013242-baraxcel-sonatrach-cs.pdf","docCreatedDate":"2019-05-22T15:33:00.000-05:00","modifiedDate":"2019-05-22T16:37:42.899-04:00","docdate":"2019-05-22T15:33:00.000-05:00","docrefNum":"H013242","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Services_Optimization,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),Fluids_Challenges:ROP_Enhancement,|brandgroups:Baroid,|locations:Global,Africa:Northern_Africa:Algeria_Northern_Africa,"},{"title":"Indonesia: First Application of N-Flow™ Breaker System Filter Cake Removal in Indonesia","description":"Halliburton Baroid\u2019s technical team recommended solution was the N-Flow™ Breaker System in conjunction with a precursor acid system which was formulated with breakers designed for a safe and controlled reaction in formations with dominating sand lithology. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011321.pdf","docCreatedDate":"2014-08-28T23:30:00.000-05:00","modifiedDate":"2014-08-28T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:40.346-05:00","docdate":"2014-08-28T23:30:00.000-05:00","docrefNum":"H011321","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Filter_Cake_Removal,|brandgroups:Baroid,|locations:Asia:Southeastern_Asia:Indonesia_Southeastern_Asia,|prodgroups:Fluids_Solids_Control:Breaker_Systems,"},{"title":"Argentina: OXYGON™ Oxygen Scavenger Helped Reduce Corrosion in Deep Vertical Wells","description":"A combination of high fluid densities, deep wells and elevated bottom hole temperatures proved to create a corrosive environment for the operator\u2019s rented drillpipe. Although general corrosion was controlled down to very acceptable rates, signs of pitting corrosion were observed on corrosion rings. Pitting corrosion is an extremely localized form of attack which can rapidly perforate metal. Pitting can be far more damaging than general surface corrosion.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/OXYGON-Corrosion-Argentina.pdf","docCreatedDate":"2015-01-30T22:30:00.000-06:00","modifiedDate":"2015-01-30T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:48.501-05:00","docdate":"2015-01-30T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Corrosion,|brandgroups:Baroid,|locations:South_America:Argentina_Southern_South_America,Global,|prodgroups:Fluids_Solids_Control:Completion_Fluids_and_Filtration:Corrosion_Control-Baroid,"},{"title":"High-Performance WBM with CLAYSEAL® PLUS Shale Stabilizer Eliminates Need for OBM for Monobores in Shale Play","description":"An engineered WBM containing CLAYSEAL® PLUS shale stabilizer and an effective lubricant helped deliver performance on par with OBM without the environmental impact.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CLAYSEAL-PLUS-Rockies.pdf","docCreatedDate":"2016-08-17T23:30:00.000-05:00","modifiedDate":"2016-08-17T23:30:00.000-05:00","docdate":"2016-08-17T23:30:00.000-05:00","docrefNum":"H012278","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:North_America:United_States,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,"},{"title":"Wellbore cleanout spacers cut filtration time saving operator $150,000","description":"Engineered wellbore cleanout spacers accelerate deepwater displacement","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BARAKLEAN-CFS-648GoM.pdf","docCreatedDate":"2016-02-18T22:30:00.000-06:00","modifiedDate":"2017-10-02T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:32.697-05:00","docdate":"2016-02-18T22:30:00.000-06:00","docrefNum":"H012042","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Displacement_Systems,"},{"title":"Halliburton Solution Improves Cement Isolation, Saving Significant Costs Per Well","description":"WPX Energy was experiencing low, ratty cement tops and subpar cement isolation, which had become an issue with state regulators. They were also encountering increased non-productive time (NPT) with lost circulation in several wells. Cement bond logs indicated poor isolation in many wells, so additional state permits were required before the wells could be completed.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011385.pdf","docCreatedDate":"2014-11-01T23:30:00.000-05:00","modifiedDate":"2018-02-05T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:44.868-05:00","docdate":"2014-11-01T23:30:00.000-05:00","docrefNum":"H011385","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,|brandgroups:Baroid,|locations:Global,North_America:United_States,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,"},{"title":"Gulf of Mexico: BARACARB® Bridging Agent Helped Operator Prevent Severe Losses and Stuck Pipe in Depleted Sands","description":"Drilling in depleted sands in the production interval (12-1/4\u201d) at 7,600 PSI overbalanced, an operator was concerned with differentially stuck pipe or suffering severe fluid losses. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011384.pdf","docCreatedDate":"2014-11-17T22:30:00.000-06:00","modifiedDate":"2014-11-17T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:42.821-05:00","docdate":"2014-11-17T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives,Fluids_Solids_Control:Drilling_Fluids_Solutions,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"Texas, USA: BaraMesh® Shaker Screens Reduce Screen Usage Up to 66% on Three 18,000-ft Wells","description":"A rig in the Permian Basin was\nequipped with three NOV Brandt™\nKING COBRA™ VENOM™ Shakers,\neach with four screens. The drilling\ncontractor was responsible for\nproviding shaker screens per the\ndrilling contract, so the rig manager\nwas interested in reducing the\nnumber of screen changes and\nrelated costs.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraMesh-Permian.pdf","docCreatedDate":"2016-12-29T22:30:00.000-06:00","modifiedDate":"2016-12-29T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:04.758-05:00","docdate":"2016-12-29T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:North_America:United_States,|prodgroups:Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,"},{"title":"BaraCRI™ Cuttings Reinjection System Saves Operator USD 120,000 Per Month","description":"CRI Solution enables operator to avoid costly skip-and-ship cuttings processing","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012795.pdf","docCreatedDate":"2018-01-10T22:30:00.000-06:00","modifiedDate":"2018-01-11T22:30:00.000-06:00","docdate":"2018-01-10T22:30:00.000-06:00","docrefNum":"H012795","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges,|locations:Global,|prodgroups:Fluids_Solids_Control:Waste_Management,Fluids_Solids_Control:Separation_&_Handling:Cuttings_Reinjection,"},{"title":"HYDRO-PLUG® LCM Pill Cures Total Losses in High-Permeability Depleted Zone","description":"HYDRO-PLUG® LCM pill cures total losses in high-permeability\ndepleted zone","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HYDROPLUGLostCirculationIndonesia.pdf","docCreatedDate":"2015-05-01T23:30:00.000-05:00","modifiedDate":"2017-10-03T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:59.770-05:00","docdate":"2015-05-01T23:30:00.000-05:00","docrefNum":"H011745","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Lost_Circulation-Reservoir_Challenges,Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Asia:Southeastern_Asia:Indonesia_Southeastern_Asia,Global,"},{"title":"Engineered Solution with DFG™ Software Enables Operator to Drill Long Lateral Section","description":"An operator was actively drilling horizontal wells in Kakwa area of the Western Canadian Sedimentary Basin to produce gas from the Montney shale formation, where historically, Rate of Penetration (ROP) is low. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010284.pdf","docCreatedDate":"2013-06-01T23:30:00.000-05:00","modifiedDate":"2017-09-25T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:32.993-05:00","docdate":"2013-06-01T23:30:00.000-05:00","docrefNum":"H010284","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:ROP_Enhancement,|brandgroups:Baroid,|locations:North_America,North_America:Canada,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,Fluids_Solids_Control:Fluids_Engineering,Real_Time_Services:Real-Time_&_Automation_Services,Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Fluids_Software_Solutions,"},{"title":"BaraBlend®-665 and BaraLock®-666 LCM Pills Stop Severe Losses in Highly Fractured Formation","description":"An operator in Pakistan\u2019s Kadanwari field experienced severe downhole losses in the highly fractured Sui Main limestone formation. Offset well records in the Kadanwari field showed similar lost circulation incidents","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012667.pdf","docCreatedDate":"2017-09-19T23:30:00.000-05:00","modifiedDate":"2017-10-02T23:30:00.000-05:00","docdate":"2017-09-19T23:30:00.000-05:00","docrefNum":"H012667","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Global,Asia:Southern_Asia:Pakistan_Southern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives,"},{"title":"Dynamic pad mud solution provides wellbore stability and reduces costs","description":"Well-planned pad mud operation helps maintain wellbore stability in\ndeviated top hole riser less drilling, saving costs and eliminating casing\nstring from well design","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/PadMudAngola.pdf","docCreatedDate":"2016-02-18T22:30:00.000-06:00","modifiedDate":"2016-02-18T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:32.697-05:00","docdate":"2016-02-18T22:30:00.000-06:00","docrefNum":"H011992","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Viscosifiers-Suspending_Agents-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives:Filtrate_Control_Agents-Baroid,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"Qatar: STOPPIT® Lost Circulation Material Enables Customer to Regain Circulation after Total Losses","description":"Due to previous success with STOPPIT® Lost Circulation Material (LCM) in other areas, Baroid introduced STOPPIT LCM into the planning phase and the drilling program for the current well.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011324.pdf","docCreatedDate":"2014-08-29T23:30:00.000-05:00","modifiedDate":"2014-08-29T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:41.468-05:00","docdate":"2014-08-29T23:30:00.000-05:00","docrefNum":"H011324","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Middle_East:Qatar_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"ENVIROMUL™ HT Invert Emulsion Fluid System Enables Operator to Successfully Drill HPHT Well in North Sea","description":"An operator was planning to drill the first subsea highpressure/high-temperature (HPHT) well in the North Sea for several years. The operator challenged Baroid to provide a fluid solution that would allow for drilling the 8 1/2-in reservoir section from 13,910 feet (4,240 meters) (cased depth) to 14,859 feet (4,529 meters) withoutexceeding a drilling window of 1.5 lb/gal, which would risk fracturing formation at the casing shoe. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012558.pdf","docCreatedDate":"2017-05-01T23:30:00.000-05:00","modifiedDate":"2017-05-01T23:30:00.000-05:00","docdate":"2017-05-01T23:30:00.000-05:00","docrefNum":"H012558","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Temperature,Fluids_Challenges:Mud_Weight_Management,Drilling_Challenges:Extended_Reach_Drilling_(ERD),Environmental_Challenges:Pressure,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Fluids_Solids_Control:Conventional_Invert_Emulsion_Systems,Fluids_Solids_Control:Oil_Based_Systems,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,"},{"title":"Customized High-Performance NAF Delivers Stable HPHT Wellbore, Saving Significant Time and Cost","description":"Enable operator to drill to total depth with minimal disruption and to obtain accurate logs of the reservoir, despite these conditions:\n» Highly reactive shale\n» Abnormal pressures\n» Depleted zones","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012724.pdf","docCreatedDate":"2017-10-25T23:30:00.000-05:00","modifiedDate":"2017-10-25T23:30:00.000-05:00","docdate":"2017-10-25T23:30:00.000-05:00","docrefNum":"H012724","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure,Workflow_Integration:HalComplete:Shale_Field_Development,|brandgroups:Baroid,|locations:Africa:Northern_Africa:Egypt_Northern_Africa,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BDF-662 Shale Stabilizer Enhances HP/HT Filtration Control","description":"Shale stabilizer prevents stuck pipe, seals microfractures, and eliminates shale instability.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013244-bdf-662.pdf","docCreatedDate":"2019-04-19T14:48:00.000-05:00","modifiedDate":"2019-05-22T16:08:43.741-04:00","docdate":"2019-04-19T14:48:00.000-05:00","docrefNum":"H013244","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,Drilling_Challenges:Stuck_Pipe,|brandgroups:Baroid,|locations:Global,Middle_East:Oman_Middle_East,"},{"title":"Egypt: HYDRO-GUARD® water-based drilling fluid system replaced competitor silicate mud, delivering stable wellbore through troublesome shale","description":"Baroid recommended HYDRO-GUARD water-based\ndrilling fluid system along with the addition of BAROTROL\nPLUS additive to provide optimum inhibition in the\ntroublesome shale.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010186.pdf","docCreatedDate":"2013-04-01T23:30:00.000-05:00","modifiedDate":"2013-05-09T23:30:00.000-05:00","docdate":"2013-04-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Increased_ROP,Formation_Challenges:Shale,|brandgroups:Baroid,|locations:Global,Africa:Northern_Africa:Egypt_Northern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Sag Resistant, Economical Fluid Solution for Narrow Margin, Depleted Permeable Zone, High Angle Wellbore","description":"This offshore application presented challenges that included a narrow operating window, high inclination and a depleted permeable zone with serious mud losses.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010258.pdf","docCreatedDate":"2013-05-01T23:30:00.000-05:00","modifiedDate":"2017-09-26T23:30:00.000-05:00","docdate":"2013-05-01T23:30:00.000-05:00","docrefNum":"H010258","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Deepwater,Drilling_Challenges:Stuck_Pipe,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"Norway: BaraLube™ W-511 brine lubricant in packer fluid significantly eases friction to facilitate running of upper completion","description":"BaraLube™ W-511 brine lubricant in packer fluid significantly eases friction to facilitate running of upper completion","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010877.pdf","docCreatedDate":"2013-11-01T23:30:00.000-05:00","modifiedDate":"2015-09-17T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:36.427-05:00","docdate":"2013-11-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Drilling_Challenges:Drill_String_Torque_Drag_Reduction,|brandgroups:Baroid,|locations:Europe:Northern_Europe:Norway_Northern_Europe,Global,|prodgroups:Fluids_Solids_Control:Completion_Fluids_and_Filtration:Packer_Fluids,Fluids_Solids_Control:Completion_Fluids_and_Filtration:Packer_Fluids:Insulating_Packer_Fluids,"},{"title":"Completion Fluid Services help save operator millions of dollars in Gulf of Mexico","description":"Successful removal of N-Solate® 275 insulating gel leads to estimated\nsavings of US$10-15 million on a deepwater well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/NSolate275Removal.pdf","docCreatedDate":"2015-11-13T22:30:00.000-06:00","modifiedDate":"2015-11-13T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:17.330-05:00","docdate":"2015-11-13T22:30:00.000-06:00","docrefNum":"H011779","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Completion_Fluids_and_Filtration:Packer_Fluids,"},{"title":"BaraXcel™ NAF Minimizes Losses During Challenging Cement Job on Ultra-Deepwater Well","description":"Optijmized Fluid and ECD Management Facilitate 787 BBL primary cent job","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013340.pdf","docCreatedDate":"2019-08-15T09:28:09.566-04:00","modifiedDate":"2019-08-15T09:28:09.566-04:00","docdate":"2019-08-15T09:28:09.566-04:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,"},{"title":"EZ-GLIDE™ Lubricant Prevents High Torque in Oil Sands, Saving Rig Time","description":"Lubricant enables operator to recover significant reservoir drilling fluid for reuse","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012796.pdf","docCreatedDate":"2017-12-21T22:30:00.000-06:00","modifiedDate":"2017-12-21T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:24.274-05:00","docdate":"2017-12-21T22:30:00.000-06:00","docrefNum":"H012796","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Drill_String_Torque_Drag_Reduction,|brandgroups:Baroid,|locations:Global,South_America:Venezuela_Northern_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lubricants-Baroid,"},{"title":"US Oklahoma: STOPPIT® LCM stops oil-based fluid losses in horizontal wellbore","description":"An operator in the Cana Field was in the process of drilling a well with a projected MD of 18,086 feet \u2013 including a 7,500-ft lateral \u2013 which was their longest lateral to date in the field. A bit trip was made in the lateral with a 13.1 lb/gal INVERMUL diesel based system at a MD of 12,204 feet and a TVD of 10,714 feet. Once on bottom, severe lost circulation was encountered.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09685.pdf","docCreatedDate":"2012-09-01T23:30:00.000-05:00","modifiedDate":"2014-07-03T23:30:00.000-05:00","docdate":"2012-09-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:North_America,North_America:United_States,North_America:United_States:Oklahoma,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"Kazakhstan: N-FLOW™ 325 Filter Cake Breaker System Leads to Increased Production Rate","description":"N-FLOW™ 325 Filter Cake Breaker System Leads to Increased Production Rate","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09048.pdf","docCreatedDate":"2012-02-01T22:30:00.000-06:00","modifiedDate":"2014-11-04T22:30:00.000-06:00","docdate":"2012-02-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Filter_Cake_Removal,|brandgroups:Baroid,|locations:Asia:Central_Asia:Kazakhstan_Central_Asia,Global,|prodgroups:Fluids_Solids_Control:Breaker_Systems,Fluids_Solids_Control:Reservoir_Fluids_Solutions,"},{"title":"N-FLOW™ -325 Breaker System Increases Production by 30% in Giant Boscán Heavy Oil Field","description":" N-FLOW™ -325 Breaker System Increases Production by 30% in Giant Boscán Heavy Oil Field","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/h013046.pdf","docCreatedDate":"2018-10-01T11:11:00.000-05:00","modifiedDate":"2019-01-08T11:12:33.718-06:00","docdate":"2018-10-01T11:11:00.000-05:00","docrefNum":"H013046","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Sludging_and_Asphaltenes,|locations:South_America:Venezuela_Northern_South_America,|prodgroups:Fluids_Solids_Control:Breaker_Systems,Fluids_Solids_Control:Reservoir_Fluids_Solutions,"},{"title":"Engineered BaraG-Force™ VacVCD System Reduces ROC Levels and Decreases Final Disposal Costs on Nine-Well Drilling Program","description":"Baroid solution decreases ROC by more than 60 percent","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012824.pdf","docCreatedDate":"2018-02-14T22:30:00.000-06:00","modifiedDate":"2018-02-14T22:30:00.000-06:00","docdate":"2018-02-14T22:30:00.000-06:00","docrefNum":"H012824","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Cuttings_Handling_and_Disposal,Reduce_Nonproductive_Time,|brandgroups:Baroid,|locations:Global,North_America:United_States,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Waste_Handling_&_Transport,"},{"title":"Qatar: N-FLOW™ 325 Filter Cake Breaker Helped Operator Stimulate Fishbone Well","description":"The operator wanted to drill and stimulate a multiple branch (\u201cfishbone\u201d) monolayer multilateral well in the Mishrif Formation. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010523.pdf","docCreatedDate":"2013-09-01T23:30:00.000-05:00","modifiedDate":"2013-09-12T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:32.993-05:00","docdate":"2013-09-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Filter_Cake_Removal,|brandgroups:Baroid,|locations:Middle_East:Qatar_Middle_East,Global,|prodgroups:Fluids_Solids_Control:Breaker_Systems,Fluids_Solids_Control:DRIL-N_Fluids,"},{"title":"BOREMAX® system saves operator US$180,000 in rig time","description":"BOREMAX® System Customized with BXR™-L and BDF™-490\nShale Stabilizers Saves Six Days of Rig Time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BOREMAX-WellboreStability.pdf","docCreatedDate":"2015-09-15T23:30:00.000-05:00","modifiedDate":"2015-09-15T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:07.239-05:00","docdate":"2015-09-15T23:30:00.000-05:00","docrefNum":"H011725","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Asia:Northern_Asia:Russia_Northern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"BaraMesh® Shaker Screens Deliver Superior Performance Over Competitor's Screens","description":"A North Sea operator wanted to reduce shaker screen costs by using longer-lasting and more-efficient screens. The BaraMesh® API 140 screens were run in a field trial in direct comparison to a competitor\u2019s screens. The trial was conducted using two VSM 300 shakers: one with six BaraMesh screens and the other with the competitor\u2019s equivalent API screens.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraMeshUK.pdf","docCreatedDate":"2016-10-05T23:30:00.000-05:00","modifiedDate":"2016-10-05T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:58.062-05:00","docdate":"2016-10-05T23:30:00.000-05:00","docrefNum":"H012354","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,"},{"title":"Combo MOTF and SSRV System Saves Casing Run in Deepwater Development","description":"Baroid Solutions enables operator to reduce Fluid Volumes, creating significant savings","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012736.pdf","docCreatedDate":"2017-11-21T22:30:00.000-06:00","modifiedDate":"2017-11-21T22:30:00.000-06:00","docdate":"2017-11-21T22:30:00.000-06:00","docrefNum":"H012736","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:South_America:Brazil_Eastern_South_America,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Liquid_Mud_Plant_Engineering,Fluids_Solids_Control:Riserless_Drilling,"},{"title":"Custom Dual Solids Control Systems on Drillship Maintain High-Rate Processing Over Five-Well Program with Zero NPT","description":"A major deepwater operator in the Gulf of Mexico asked Baroid separation solutions to","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/custom-dual-solids-control-systems-on-drillship.pdf","docCreatedDate":"2018-09-03T14:24:00.000-05:00","modifiedDate":"2018-11-06T14:38:10.066-06:00","docdate":"2018-09-03T14:24:00.000-05:00","docrefNum":"H013036","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Solids_Control,Fluids_Solids_Control:Separation_&_Handling,Fluids_Solids_Control:Separation_&_Handling:Cuttings_Dryers,"},{"title":"BaraMesh® Shaker Screens Help Major Operator Reduce Disposal Volume and Recover Invert Emulsion Fluid for Reuse","description":"BaraMesh® Shaker Screens Help Major Operator Reduce Disposal Volume and Recover Invert Emulsion Fluid for Reuse","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraMeshScreens-WasteManagement.pdf","docCreatedDate":"2015-09-17T23:30:00.000-05:00","modifiedDate":"2015-09-16T23:30:00.000-05:00","docdate":"2015-09-17T23:30:00.000-05:00","docrefNum":"H011654","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Baroid,|locations:North_America:United_States,Global,|prodgroups:Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,Fluids_Solids_Control:Solids_Control:Solids_Control_Equipment_and_Screens,"},{"title":"North Sea: Successful N-FLOW™ 325 filter cake breaker treatment achieves high production rates for Statoil","description":"Statoil\u2019s challenge in the A-14H well in the Visund Field was to drill the long 8 ½ in x 9 ½ in hole section for the first time through the reservoir at high angle. They wanted to ensure that maximum communication between the reservoir formation water and the wellbore could be achieved.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09425.pdf","docCreatedDate":"2012-08-01T23:30:00.000-05:00","modifiedDate":"2014-11-17T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:20.118-05:00","docdate":"2012-08-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Filter_Cake_Removal,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Fluids_Solids_Control:Breaker_Systems,"},{"title":"Kazakhstan: INNOVERT® System Used in Well\u2019s Record-Breaking Performance","description":"An operator working in the\nKarachaganak field was looking for an innovation that would\noptimize the incumbent drilling program in an effort to further\nreduce costs and improve the efficiency of the stimulation\nprocess.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H08032.pdf","docCreatedDate":"2010-11-01T23:30:00.000-05:00","modifiedDate":"2010-11-10T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:14.543-05:00","docdate":"2010-11-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Damaged_Formations,Borehole_Challenges:Borehole_Damage,|brandgroups:Baroid,|locations:Asia:Central_Asia:Kazakhstan_Central_Asia,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"Kazakhstan: Innovative Waste Management System from Baroid Surface Solutions Helps Assure Environmental Compliance and Saves Millions","description":"For more than four years the TCC system has operated successfully for this operator, handling up to three drilling rig operations, and treating more than 36,000m³ of oil based drill cuttings.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010798.pdf","docCreatedDate":"2014-03-01T22:30:00.000-06:00","modifiedDate":"2014-03-17T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:40.346-05:00","docdate":"2014-03-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Management,|brandgroups:Baroid,|locations:Asia:Central_Asia:Kazakhstan_Central_Asia,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Thermal_Treatment,Fluids_Solids_Control:Waste_Management,"},{"title":"Vacuum-Feed Vertical Cuttings Dryer Simplifies Operations, Saves Costs","description":"BARAG-FORCE™ System saves operator more than USD 25K per well in Shale play","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/vacuum-feed-vertical-cuttings-dryer.pdf","docCreatedDate":"2018-09-03T14:34:00.000-05:00","modifiedDate":"2018-11-06T14:37:08.492-06:00","docdate":"2018-09-03T14:34:00.000-05:00","docrefNum":"H013035","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Fluids_Solids_Control:Separation_&_Handling,Fluids_Solids_Control:Waste_Management:Waste_Treatment_&_Disposal:Cuttings_Dryers,"},{"title":"Russia: BARADRIL-N® Drill-In Fluid System Helped Increase Production on Multilateral Horizontal Wells","description":"The challenged invloved increasing production by drilling multilateral horizontal wells in a depleted reservoir with a low pore pressure gradient. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011327.pdf","docCreatedDate":"2014-11-13T22:30:00.000-06:00","modifiedDate":"2014-11-13T22:30:00.000-06:00","docdate":"2014-11-13T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Damaged_Formations,|brandgroups:Baroid,|locations:Global,Asia:Northern_Asia:Russia_Northern_Asia,|prodgroups:Fluids_Solids_Control:DRIL-N_Fluids,"},{"title":"First deepwater Mediterranean horizontal payzone drilled successfully","description":"First deepwater Mediterranean horizontal payzone drilled successfully\n10 days ahead of plan with optimized fluids and modeling","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HO11856BARADRILNFINAL.pdf","docCreatedDate":"2015-07-15T23:30:00.000-05:00","modifiedDate":"2015-07-15T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:05.482-05:00","docdate":"2015-07-15T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges,Workflow_Integration:HalDrill:Drilling_Performance,|brandgroups:Baroid,|locations:Global,|prodgroups:Optimization_Services:Drilling_Optimization:Wellbore_Integrity,"},{"title":"Saudi Arabia: INNOVERT® OBM System Remains Stable During Seven-day Logging Operation","description":"System eliminates need for mud conditioning trip, saving time and money.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/INNOVERT-Saudi.pdf","docCreatedDate":"2016-11-28T22:30:00.000-06:00","modifiedDate":"2016-11-28T22:30:00.000-06:00","docdate":"2016-11-28T22:30:00.000-06:00","docrefNum":"H012392","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"INNOVERT® HPOBM and STEELSEAL® LCM overcome saltwater influx, concurrent losses","description":"INNOVERT® HPOBM AND STEELSEAL® LCM HELP OPERATOR OVERCOME SALTWATER INFLUX, CONCURRENT LOSSES","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/INNOVERT-STEELSEAL-Saudi.PDF","docCreatedDate":"2016-01-18T22:30:00.000-06:00","modifiedDate":"2016-02-02T22:30:00.000-06:00","docdate":"2016-01-18T22:30:00.000-06:00","docrefNum":"HO12060","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Middle_East:Saudi_Arabia_Middle_East,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,"},{"title":"BAROLIFT® Sweeping Agent and DFG™ Modeling Software Help Save 10 Days, $800K on Horizontal Well","description":"An operator in Iraq\u2019s West Qurna field faced hole cleaning challenges in the 8-1/2-inch and 6-1/8-inch intervals, as the wellbore transitioned through the build section (40\u201360° angle) into the 1,250-meter (4,101-foot) horizontal step-out. This was the first horizontal well drilled by the operator in this area.\nDrilling on offset wells had been delayed by frequent backreaming and sidetracking in the 8-1/2-inch section. There was a high risk of stuck pipe and loss of the well.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012630.pdf","docCreatedDate":"2017-07-24T23:30:00.000-05:00","modifiedDate":"2017-07-24T23:30:00.000-05:00","docdate":"2017-07-24T23:30:00.000-05:00","docrefNum":"H012630","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,|brandgroups:Baroid,|locations:Global,Middle_East:Iraq_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluids_Solutions,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"Mobile Vertical Cuttings Dryer Saves Operator over $300K in OBM Recovery and Waste Volume Reduction","description":"Mobile Vertical Cuttings Dryer Saves Operator over\n$300K in OBM Recovery and Waste Volume Reduction","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/MobileVCD-MidCon.pdf","docCreatedDate":"2015-03-25T23:30:00.000-05:00","modifiedDate":"2015-03-25T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:56.104-05:00","docdate":"2015-03-25T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Water_Management-Environmental_Challenge,Fluids_Challenges:Waste_Management:Oil_Based-Waste_Management,Fluids_Challenges:Waste_Minimization:Oil_Based-Waste_Minimization,Fluids_Challenges:Solids_Control,Fluids_Challenges:Cuttings_Handling_and_Disposal,|brandgroups:Baroid,|locations:Global,"},{"title":"Saudi Arabia: BRINEDRIL-N® High-Density Brine-Based Drill-In Fluid Helps Eliminate Stuck in Pipe Issues","description":"An operator in Saudi Arabia created a series of wells in a naturally fractured carbonate formation. These wells involved drilling long horizontal sections through the reservoir. The operator encountered frequent issues with differential sticking and poor rates of penetration. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011531.pdf","docCreatedDate":"2014-12-19T22:30:00.000-06:00","modifiedDate":"2014-12-19T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:47.490-05:00","docdate":"2014-12-19T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:ROP_Enhancement,|brandgroups:Baroid,|locations:Middle_East:Saudi_Arabia_Middle_East,Global,|prodgroups:Fluids_Solids_Control:DRIL-N_Fluids,"},{"title":"BaraECD® Fluid Significantly Reduces Costs in Completion Operation","description":"Baroid Drill-In Fluid enables operator to save three days of rig time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012765.pdf","docCreatedDate":"2018-01-12T22:30:00.000-06:00","modifiedDate":"2018-01-12T22:30:00.000-06:00","docdate":"2018-01-12T22:30:00.000-06:00","docrefNum":"H012765","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraLogix® Services Enable Operator to Maintain Stable Wellbore in HPHT Conditions","description":"Baroid installed the BaraLogix® Density and Rheology Unit (DRU) at the rigsite and provided a team of BaraLogix engineers to continuously monitor fluid properties while drilling the problematic hole section.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/Baralogix-HPHT-SaudiArabia.pdf","docCreatedDate":"2017-01-27T22:30:00.000-06:00","modifiedDate":"2017-06-15T23:30:00.000-05:00","docdate":"2017-01-27T22:30:00.000-06:00","docrefNum":"H012442","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"BaraMesh® Shaker Screens Outperform Competition in Side-by-Side Trial, Cut Screen Costs by 30% per Well","description":"BaraMesh® Shaker Screens Outperform Competition in Side-by-Side\nTrial, Cut Screen Costs by 30% per Well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraMeshScreensNUSOklahoma.pdf","docCreatedDate":"2015-06-09T23:30:00.000-05:00","modifiedDate":"2015-06-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:01.078-05:00","docdate":"2015-06-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Cuttings_Handling_and_Disposal,Fluids_Challenges:Fluid_Loss,Fluids_Challenges:Solids_Control,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,Fluids_Solids_Control:Solids_Control:Solids_Control_Equipment_and_Screens,"},{"title":"Egypt: Engineered HYDRO-PLUG® Lost Circulation Material Helped Operator Cure Severe Losses in Carbonate Formation","description":"Drilling in the Eastern Desert, Trans Globe encountered complete losses while drilling the 8.5\u201d hole section to 3,338 ft. In the first attempt to cure the losses, a 100 ppb conventional lost circulation material (LCM) pill was unsuccessful. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011330.pdf","docCreatedDate":"2014-09-03T23:30:00.000-05:00","modifiedDate":"2014-09-03T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:41.468-05:00","docdate":"2014-09-03T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,|brandgroups:Baroid,|locations:Africa:Northern_Africa:Egypt_Northern_Africa,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"US Wyoming: Baroid\u2019s CLAYSEAL® Shale Stabilizer Provides Excellent Wellbore Stability on Problematic Well","description":"The DJ Basin located in Laramie County, Wyoming is known for its reactive and unstable shales. Preliminary research of offset data indicated that reactive clays may not present a problem in the upper hole section, but issues were anticipated as drilling progressed through the interval. Contrary to the data, while attempting to drill to a total depth of 11,804 ft, an operator encountered excessive torque and drag in the upper vertical section, and also encountered a prolonged open hole due to operational issues. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010827.pdf","docCreatedDate":"2013-12-01T22:30:00.000-06:00","modifiedDate":"2013-12-18T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:36.427-05:00","docdate":"2013-12-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Drill_String_Torque_Drag_Reduction,Production_Challenges:Unconventional_Resources,|brandgroups:Baroid,|locations:North_America,Global,North_America:United_States,North_America:United_States:Wyoming,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,"},{"title":"Clay-Free DRIL-N® Fluid Helps Prevent Instability, Formation Damage on Depleted Deepwater Injector","description":"Reservoir drilling fluid enables operator to reach target zone ahead of plan","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/Clay-Free-DRIL-N-SBM-Deepwater-Injector.pdf","docCreatedDate":"2017-07-27T23:30:00.000-05:00","modifiedDate":"2017-07-27T23:30:00.000-05:00","docdate":"2017-07-27T23:30:00.000-05:00","docrefNum":"H012596","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:DRIL-N_Fluids,"},{"title":"ENCORE® NAF System Drills Deep Depleted Sand with Zero Losses in Deepwater GOM","description":"A known depleted zone was causing severe lost circulation on deepwater wells in this field.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012671.pdf","docCreatedDate":"2017-10-17T23:30:00.000-05:00","modifiedDate":"2017-10-17T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:18.495-05:00","docdate":"2017-10-17T23:30:00.000-05:00","docrefNum":"H012671","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraBlend®-657 and BARAFLAKE® C LCM Combo Reduces Static Loss Rate to Zero","description":"The operator was able to perform a cement squeeze and to sidetrack the well with no further disruptions.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraBlend-657-BARAFLAKE-C.pdf","docCreatedDate":"2016-09-27T23:30:00.000-05:00","modifiedDate":"2016-11-08T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:56.603-05:00","docdate":"2016-09-27T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:Oman_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Circulation_Materials-Acid_Soluble-Baroid,"},{"title":"Offshore Slop Treatment Unit Reduces Volume Sent","description":"Offshore Slop Treatment Unit Reduces Volume Sent\nto Shore by over 90% on Two NCS Operations","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/OffshoreSlopTreatmentUnit-WasteManagement.pdf","docCreatedDate":"2015-03-31T23:30:00.000-05:00","modifiedDate":"2015-10-01T23:30:00.000-05:00","docdate":"2015-03-31T23:30:00.000-05:00","docrefNum":"H011728","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Europe:Northern_Europe:Norway_Northern_Europe,Global,|prodgroups:Fluids_Solids_Control:Waste_Management,Fluids_Solids_Control:Separation_&_Handling:Water_Treatment,"},{"title":"Congo: Successful INNOVERT® Fluid Application in Congo Operations","description":"An offshore operator in the Republic of Congo was implementing an open hole expandable sand screen completion strategy. Risks identified included screen plugging, potential for formation damage, and increased costs.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H011449.pdf","docCreatedDate":"2014-11-20T22:30:00.000-06:00","modifiedDate":"2014-11-20T22:30:00.000-06:00","publishDate":"2018-10-02T11:05:44.868-05:00","docdate":"2014-11-20T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Damaged_Formations,|brandgroups:Baroid,|locations:Global,Africa:Central_Africa:Congo_Democratic_Republic_of_the_Central_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"Clay-Free INNOVERT® IEF Eliminates Instability in Buildup Section, Saves 94 Hours and $470K","description":"A highly reactive shale caused wellbore instability in the buildup section of the directional wells. Significant nonproductive time (NPT) was attributed to the need for frequent wellbore conditioning trips and stuck pipe incidents.\nThe wells were being drilled with a conventional invert emulsion fluid (IEF) system with oil/water ratios (OWR) of 80/20 or higher.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012361.pdf","docCreatedDate":"2017-07-24T23:30:00.000-05:00","modifiedDate":"2017-07-24T23:30:00.000-05:00","docdate":"2017-07-24T23:30:00.000-05:00","docrefNum":"H012361","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Shale,Drilling_Challenges:Stuck_Pipe,|brandgroups:Baroid,|locations:Global,Middle_East:Saudi_Arabia_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,"},{"title":"Kazakhstan: Baroid Drilling Waste Management Service Helped Operator Net $1.39M in Base Oil Reuse Savings and Ensure Environmental Compliance in Remote Land Operation","description":"An operator\u2019s waste managementstrategy needed revision to help ensure operations continued in a safe and environmentally acceptable manner. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H07539.pdf","docCreatedDate":"2010-03-01T22:30:00.000-06:00","modifiedDate":"2014-09-18T23:30:00.000-05:00","docdate":"2010-03-01T22:30:00.000-06:00","docrefNum":"H07539","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges,Fluids_Challenges:Waste_Management:Oil_Based-Waste_Management,|brandgroups:Baroid,|locations:Asia:Central_Asia:Kazakhstan_Central_Asia,|prodgroups:Fluids_Solids_Control:Waste_Management:Waste_Treatment_&_Disposal,Fluids_Solids_Control:Surface_Solutions,Fluids_Solids_Control:Thermal_Desorption,Fluids_Solids_Control,Fluids_Solids_Control:Separation_&_Handling:Thermal_Treatment,"},{"title":"BaraXcel™ Drill-In Fluid and BDF™-442 Breaker Additive Minimize Formation Damage in Deepwater Reservoir ","description":"CUSTOMIZED DRILL-IN FLUID AND FILTER CAKE BREAKER DELIVER OPTIMUM WELLBORE CONDITIONS","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013291-BaraXcel-BDF-442.pdf","docCreatedDate":"2019-06-03T09:20:00.000-05:00","modifiedDate":"2019-07-01T10:43:43.481-04:00","docdate":"2019-06-03T09:20:00.000-05:00","docrefNum":"H013291","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Drilling_Performance:Drilling_Performance_Drilling_Fluids,"},{"title":"BaraShale™ Lite Fluid Enables Sustained Success of Unconventionals in Low-Cost Oil Environment","description":"To sustain operations in the Permian Basin against the low-cost oil environment, operators needed to achieve superior borehole integrity and annular isolation, and to reduce drilling time and waste disposal costs.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012707.pdf","docCreatedDate":"2017-10-03T23:30:00.000-05:00","modifiedDate":"2017-10-03T23:30:00.000-05:00","docdate":"2017-10-03T23:30:00.000-05:00","docrefNum":"H012707","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Low_Pressure_Reservoirs,Salt_Challenges:Drilling_Optimization_through_salt,Salt_Challenges,|brandgroups:Baroid,|locations:North_America,Global,North_America:United_States:New_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,"},{"title":"Inhibitive HYDRO-GUARD® HPWBM Delivers Trouble-Free Gauge Hole, Zero Cuttings Handling Costs","description":"Baroid Solution saves operator several days of rig time","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012732.pdf","docCreatedDate":"2017-11-08T22:30:00.000-06:00","modifiedDate":"2017-11-08T22:30:00.000-06:00","docdate":"2017-11-08T22:30:00.000-06:00","docrefNum":"H012732","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Shale,|brandgroups:Baroid,|locations:Global,Africa:Northern_Africa:Algeria_Northern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"Brunei: Baroid's Mix On The Fly (MOTF) System Allows Continuous Drilling With Limited Pit Volume","description":"This customer called upon Halliburton Baroid to find a solution for mixing high volumes of Dynamic Kill Drilling (DKD) mud with limited pit volume of 655m³.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010310.pdf","docCreatedDate":"2013-07-01T23:30:00.000-05:00","modifiedDate":"2013-07-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:30.353-05:00","docdate":"2013-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Management,Fluids_Challenges:Solids_Control,|brandgroups:Baroid,|locations:Asia:Southeastern_Asia:Brunei_Southeastern_Asia,|prodgroups:Fluids_Solids_Control:Solids_Control,Fluids_Solids_Control:Waste_Management,"},{"title":"EZ-PLUG® LCM Pill Optimized with DFG™ Modeling Stops Loss in High-Perm Sands, Saving 72 Hours of Rig Time","description":"The operator wanted to avoid losses in a series of high-permeability sands that had severe lost circulation issues in previous wells. Costs on these wells had escalated due to days lost battling the losses, and to the replacement of mud volumes","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012702.pdf","docCreatedDate":"2017-10-11T23:30:00.000-05:00","modifiedDate":"2017-10-11T23:30:00.000-05:00","docdate":"2017-10-11T23:30:00.000-05:00","docrefNum":"H012702","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:Global,South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives,"},{"title":"N-FLOW™ breaker treatment helps increase production rates","description":"N-FLOW™ 325 Filter Cake Breaker System Yields Strong Production\nIncrease on Four Uranium Extraction Wells","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/N-FLOW325.pdf","docCreatedDate":"2015-09-15T23:30:00.000-05:00","modifiedDate":"2015-09-15T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:09.664-05:00","docdate":"2015-09-15T23:30:00.000-05:00","docrefNum":"H011727","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Asia:Central_Asia:Kazakhstan_Central_Asia,|prodgroups:Fluids_Solids_Control:Breaker_Systems,"},{"title":"Optimized CARBONOX® WBM Weighted Up to 2.55 sg (21.3 lb/gal) for High-Pressure Exploration Well","description":"An operator in Argentina\u2019s Parva Negra field planned to re-enter and deepen an extended-reach well that had been temporarily abandoned in 2015. A high-density drilling fluid would be needed to maintain well control. The ability to control equivalent circulating density (ECD) and optimize rheological properties would be critical to the success of this exploratory well operation.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012669.pdf","docCreatedDate":"2017-08-23T23:30:00.000-05:00","modifiedDate":"2017-08-23T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:15.588-05:00","docdate":"2017-08-23T23:30:00.000-05:00","docrefNum":"H012669","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges,|brandgroups:Baroid,|locations:Global,South_America:Argentina_Southern_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Water_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluids_Solutions,"},{"title":"BaraSure™ W-674 Shale Stabilizer Enables Operator to Save Eight Days of Drilling Time in Highly Reactive Clays","description":"Reactive clays in the intermediate interval caused slow drilling rates and high fluid treatment costs","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012598.pdf","docCreatedDate":"2017-07-10T23:30:00.000-05:00","modifiedDate":"2017-07-10T23:30:00.000-05:00","docdate":"2017-07-10T23:30:00.000-05:00","docrefNum":"H012598","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Borehole_Challenges,Drilling_Challenges,|brandgroups:Baroid,|locations:Global,Asia:Southern_Asia:Pakistan_Southern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,"},{"title":"CleanWell® Solutions Executes Deepwater Direct Displacement in One Wellbore Circulation","description":"OPERATION SAVES RIG TIME AND OUTPERFORMS OFFSETS ON CLARITY SPECS","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013292-CleanWell-Solutions.pdf","docCreatedDate":"2019-06-03T09:45:00.000-05:00","modifiedDate":"2019-07-01T11:58:46.401-04:00","docdate":"2019-06-03T09:45:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,"},{"title":"Colombia: BaraBlend®-665/BaraLock®-666 LCM Pill Restores Circulation, Supports Successful Cement Plug","description":"A customer in Colombia experienced severe lost circulation issues when drilling through depleted sandstone. High-volume losses were a known risk in the area due to faulting, and pore pressures ranged between 3.0 ppg and 4.0 ppg.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraBlend665BaraLock666Colombia.pdf","docCreatedDate":"2016-12-09T22:30:00.000-06:00","modifiedDate":"2016-12-13T22:30:00.000-06:00","publishDate":"2018-10-02T11:07:00.883-05:00","docdate":"2016-12-09T22:30:00.000-06:00","docrefNum":"H012314","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:South_America:Colombia_Northern_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"BaraXcel™ Drill-In Fluid and BaraKlean®-648 Additive Optimize Deepwater EOR Project","description":"OPERATOR ACHIEVES GREATER THAN 80 PERCENT INJECTIVITY WITH EFFECTIVE DRILL-IN FLUID AND FILTER CAKE BREAKER SYSTEMS","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013290-BaraXcel-BaraKlean-648.pdf","docCreatedDate":"2019-06-01T09:11:00.000-05:00","modifiedDate":"2019-07-01T10:17:27.695-04:00","docdate":"2019-06-01T09:11:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Drilling_Challenges:Optimize_Drilling_Conditions,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluids_Solutions,"},{"title":"Casing Set Successfully at Planned Depth After Engineered LCM Pills Cure Total Losses","description":"Casing Set Successfully at Planned Depth After Engineered LCM Pills Cure Total Losses","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/DIAMONDSEAL-STOPPIT.pdf","docCreatedDate":"2016-05-09T23:30:00.000-05:00","modifiedDate":"2016-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:43.984-05:00","docdate":"2016-05-09T23:30:00.000-05:00","docrefNum":"H012207","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Africa:Northern_Africa:Egypt_Northern_Africa,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,"},{"title":"STEELSEAL® Lost Circulation Material and BARACARB® Bridging Agent Help Apache Improve Wellbore Stability","description":"STEELSEAL® Lost Circulation Material and BARACARB® Bridging Agent Help Apache Improve Wellbore Stability and Cut Costs by 50%","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H07861.pdf","docCreatedDate":"2010-07-01T23:30:00.000-05:00","modifiedDate":"2017-10-03T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:12.466-05:00","docdate":"2010-07-01T23:30:00.000-05:00","docrefNum":"H07861","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Wellbore_Integrity,Drilling_Challenges:Stuck_Pipe,|brandgroups:Baroid,|locations:South_America:Argentina_Southern_South_America,Global,South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,"},{"title":"BaraMesh® Shaker Screens Outlast Competitor Screens, Save Operator $802 per Well","description":"BaraMesh® Shaker Screens Outlast Competitor Screens,\nSave Operator $802 per Well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BaraMeshScreensNUSOklahoma2.pdf","docCreatedDate":"2015-06-09T23:30:00.000-05:00","modifiedDate":"2015-06-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:01.078-05:00","docdate":"2015-06-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Solids_Control,Fluids_Challenges:Fluid_Loss,Fluids_Challenges:Cuttings_Handling_and_Disposal,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Solids_Control:Solids_Control_Equipment_and_Screens,Fluids_Solids_Control:Solids_Control:Shale_Shakers_&_Screens,"},{"title":"Customized BaraXcel™ HP NAF","description":"Customized BaraXcel™ HP NAF\nCleans Out Heavy Steel Cuttings\nDuring Deepwater Milling Operation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012167.pdf","docCreatedDate":"2018-08-09T23:30:00.000-05:00","modifiedDate":"2018-08-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:07:33.103-05:00","docdate":"2018-08-09T23:30:00.000-05:00","docrefNum":"H012167","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Global,North_America:Mexico,|prodgroups:Fluids_Solids_Control:Conventional_Invert_Emulsion_Systems,"},{"title":"BAROLIFT® Outperforms High-Vis Sweeps in Milling and Fishing Operation","description":"The Baroid team recommended using BAROLIFT® sweeping agent to clean the debris and cuttings from the hole while at the same time having no impact on the overall system mud properties and minimizing the need to spend time diluting the active system.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/BAROLIFT-HoleCleaning-Iraq.pdf","docCreatedDate":"2015-03-18T23:30:00.000-05:00","modifiedDate":"2015-03-18T23:30:00.000-05:00","docdate":"2015-03-18T23:30:00.000-05:00","docrefNum":"H011677","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:Iraq_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Sweeping_Agents-Baroid,"},{"title":"BaraECD® fluid and AFO service help limit downhole losses","description":"BaraECD® fluid and AFO service help reduce downhole losses by more\nthan 60% in critical well, saving $5 million","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HO12001BaraECDAFOGoM.pdf","docCreatedDate":"2016-01-27T22:30:00.000-06:00","modifiedDate":"2016-01-27T22:30:00.000-06:00","docdate":"2016-01-27T22:30:00.000-06:00","docrefNum":"HO12001","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),Fluids_Challenges:Rheology_Control,Fluids_Challenges:Barite_Sag,Drilling_Challenges:Stuck_Pipe,Deepwater,Fluids_Challenges:Fluid_Loss,Fluids_Challenges:Fluid_Services_Optimization,Deepwater:Increase_Reliability,Reduce_Nonproductive_Time,Fluids_Challenges:Mud_Weight_Management,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraG-Force™ V133 Vertical Cuttings Dryers save operator over $940,000","description":"BaraG-Force™ V133 Vertical Cuttings Dryers help major operator\nsave over $940,000 in deepwater Gulf of Mexico project","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HO12022BaraGForceGOM.PDF","docCreatedDate":"2016-01-27T22:30:00.000-06:00","modifiedDate":"2016-01-27T22:30:00.000-06:00","docdate":"2016-01-27T22:30:00.000-06:00","docrefNum":"HO12022","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Minimization:Oil_Based-Waste_Minimization,Fluids_Challenges:Waste_Management:Oil_Based-Waste_Management,Fluids_Challenges:Solids_Control,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Solids_Control:Solids_Control_Equipment_and_Screens,Fluids_Solids_Control:Separation_&_Handling:Cuttings_Dryers,Fluids_Solids_Control:Waste_Management:Waste_Treatment_&_Disposal,"},{"title":"STEELSEAL®/BARACARB® LCM pill saves $4 million on deepwater well","description":"Hesitation squeeze with STEELSEAL®/BARACARB® LCM pill stops losses and strengthens wellbore in production interval","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STEELSEAL-BARACARB.pdf","docCreatedDate":"2015-11-30T22:30:00.000-06:00","modifiedDate":"2015-11-30T22:30:00.000-06:00","publishDate":"2018-10-02T11:06:18.536-05:00","docdate":"2015-11-30T22:30:00.000-06:00","docrefNum":"H011994","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Prevention_LCM,"},{"title":"BaraClear™ Twin Filter Press Installation Significantly Reduces Costs on Gravel-Pack Completion","description":"Cost-Efficient System improves operations enabling savings of USD 124K","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012745.pdf","docCreatedDate":"2017-11-20T22:30:00.000-06:00","modifiedDate":"2017-11-20T22:30:00.000-06:00","docdate":"2017-11-20T22:30:00.000-06:00","docrefNum":"H012745","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reducing_Costs,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Fluids_Solids_Control:Separation_&_Handling:Filtration_Services,"},{"title":"Venezuela: Halliburton's SupaVac SV400 Pumping System Helped Clean Mud Pits 65% Faster, Saving US$ 6.3 MM of Rig Time","description":"The challenge was to provide a waste management solution that would accelerate the cleaning operation and significantly reduce downtime.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H07628.pdf","docCreatedDate":"2010-04-01T23:30:00.000-05:00","modifiedDate":"2010-04-19T23:30:00.000-05:00","publishDate":"2018-10-02T11:05:12.466-05:00","docdate":"2010-04-01T23:30:00.000-05:00","docrefNum":"H07628","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Waste_Minimization,Fluids_Challenges:Cuttings_Handling_and_Disposal,Fluids_Challenges:Waste_Management:Water_Based-Waste_Management,Fluids_Challenges:Waste_Management:Oil_Based-Waste_Management,|brandgroups:Baroid,|locations:South_America:Venezuela_Northern_South_America,|prodgroups:Fluids_Solids_Control,Fluids_Solids_Control:Separation_&_Handling:Waste_Handling_&_Transport,Fluids_Solids_Control:Waste_Management,"},{"title":"Customized STEELSEAL® and BAROFIBRE® Lost Circulation Solution Helped Stabilize Ultra-Slim Overbalanced Well and Save 48% on Fluid Costs","description":"Customized STEELSEAL® and BAROFIBRE® Lost Circulation Solution Helped Stabilize Ultra-Slim Overbalanced Well and Save 48% on Fluid Costs","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STEELSEALLostCirculationSaudiArabia.pdf","docCreatedDate":"2015-06-02T23:30:00.000-05:00","modifiedDate":"2015-06-02T23:30:00.000-05:00","docdate":"2015-06-02T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Lost_Circulation-Reservoir_Challenges,Well_Control_Challenges:Lost_Circulation,|locations:Global,"},{"title":"HYDRO-PLUG® LCM Pill Cures Losses in Perforated Zone","description":"HYDRO-PLUG® LCM Pill Cures Losses in Perforated Zone, Eliminating Need for USD 50,000 Cement Squeeze","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/HYDRO-PLUG-Idonesia.pdf","docCreatedDate":"2016-08-08T23:30:00.000-05:00","modifiedDate":"2016-08-08T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:54.187-05:00","docdate":"2016-08-08T23:30:00.000-05:00","docrefNum":"H012291","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Asia:Southeastern_Asia:Indonesia_Southeastern_Asia,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"Saudi Arabia: ENVIROTHIN™ fluid additive reduced ECD to penetrate potential severe thief zone without losses","description":"Upon reviewing fluid\nproperties used in previous hole sections in the well,\nHalliburton\u2019s Baroid team determined that the high yield\npoint and gels of the NaCl / polymer mud being used were\ncausing a high ECD on the formation while drilling and\ntripping, which increased the likelihood and severity of\nfluid losses.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010185.pdf","docCreatedDate":"2013-04-01T23:30:00.000-05:00","modifiedDate":"2013-05-09T23:30:00.000-05:00","docdate":"2013-04-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Fluid_Loss,Formation_Challenges:Carbonate_Formations,|brandgroups:Baroid,|locations:Middle_East:Saudi_Arabia_Middle_East,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,"},{"title":"Baroid Helps Operator in Norway Save US$679,000 on Offshore Well","description":"High-Performance Non-Aqueous Fluid Systems and Applied Fluids Optimization Service help Operator save US$679,000 in Norway","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012143BaraECDINNOVERTAFONorway.pdf","docCreatedDate":"2017-09-26T23:30:00.000-05:00","modifiedDate":"2017-09-26T23:30:00.000-05:00","docdate":"2017-09-26T23:30:00.000-05:00","docrefNum":"H012143","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Mud_Weight_Management,Fluids_Challenges:Fluid_Loss,Deepwater,Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),Fluids_Challenges:Fluid_Services_Optimization,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Fluids_Software_Solutions,Fluids_Solids_Control:Drilling_Fluids_Solutions,Fluids_Solids_Control:Specialty_Systems,Real_Time_Services:Real-Time_&_Automation_Services,"},{"title":"BaraPhase™ Thermomechanical Cuttings Cleaner Recovers Significant Base Oil for Reuse","description":"The operator needed to meet three objectives while drilling with NAF:\n» Prevent contamination\n» Recover base oil for reuse\n» Reduce OOC to less than\n1 percent","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012664.pdf","docCreatedDate":"2017-10-20T23:30:00.000-05:00","modifiedDate":"2017-10-20T23:30:00.000-05:00","docdate":"2017-10-20T23:30:00.000-05:00","docrefNum":"H012664","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Extending_Economic_Life,|brandgroups:Baroid,|locations:South_America:Colombia_Northern_South_America,Global,|prodgroups:Fluids_Solids_Control:Oil_Based_Systems,Fluids_Solids_Control:Surface_Solutions:Surface_Solutions_Plants_and_Equipment,"},{"title":"N-FLOW™ 325 Delayed-Reaction Filter Cake Breaker Optimizes Conditions in GOM Deepwater Reservoir","description":"N-FLOW 325 APPLICATION CUTS TRADITIONAL FLUID AND TIME REQUIREMENTS IN HALF, SAVING SIGNIFICANT TREATMENT COST","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013293-NFLOW-325.pdf","docCreatedDate":"2019-06-03T11:00:00.000-05:00","modifiedDate":"2019-07-01T12:03:36.464-04:00","docdate":"2019-06-03T11:00:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,"},{"title":"GeoBalance® Barrier Spacer Prevents Commingling of Mud Cap","description":"GeoBalance® Barrier Spacer Prevents Commingling of Mud Cap and BARADRIL-N® System During Trips in Horizontal Wellbore","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/GeoBalanceBarrierSpacer-BARADRILN.pdf","docCreatedDate":"2016-08-01T23:30:00.000-05:00","modifiedDate":"2016-08-01T23:30:00.000-05:00","publishDate":"2018-10-02T11:06:50.834-05:00","docdate":"2016-08-01T23:30:00.000-05:00","docrefNum":"H012258","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,Sperry_Drilling_Services,|locations:South_America:Venezuela_Northern_South_America,|prodgroups:Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,Fluids_Solids_Control:Reservoir_Fluids_Solutions,Fluids_Solids_Control:Reservoir_Drilling_Fluids,"},{"title":"ENVIROMUL™ HT Drilling Fluid and WellSET® Treatment Prevent Losses in HPHT Reservoir with Depleted Zone","description":"The HPHT reservoir contained a depleted zone that posed a high risk of severe lost circulation.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012609.pdf","docCreatedDate":"2017-07-10T23:30:00.000-05:00","modifiedDate":"2017-07-10T23:30:00.000-05:00","docdate":"2017-07-10T23:30:00.000-05:00","docrefNum":"H012609","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Lost_Circulation-Reservoir_Challenges,Reducing_Costs,Reduce_Nonproductive_Time,|brandgroups:Baroid,|locations:Asia:Southeastern_Asia:Brunei_Southeastern_Asia,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Fluids_Engineering,Fluids_Solids_Control:Fluid_Loss_Control,"},{"title":"Combo Systems Optimize Drilling and Completion Phases of Reservoir Interval","description":"An operator in the U.K. was using a competitor\u2019s breaker system for well completions, resulting in an average formation-damage skin factor of 5.5.\n\nThe operator challenged Baroid for a better solution to minimize the formation damage and differential sticking potential in a 2,100-foot (640-meter) length of an 8.5-\ninch x 9.5-inch horizontal section while maintaining the equivalent circulating density (ECD) within a 13.5-lb/gal.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012597.pdf","docCreatedDate":"2017-07-10T23:30:00.000-05:00","modifiedDate":"2017-07-10T23:30:00.000-05:00","docdate":"2017-07-10T23:30:00.000-05:00","docrefNum":"H012597","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Damaged_Formations,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:United_Kingdom_Western_Europe,|prodgroups:Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Reservoir_Fluids_Solutions,Fluids_Solids_Control:Reservoir_Drilling_Fluids,"},{"title":"How Halliburton beat a client\u2019s drilling average by 43%, saving them more than $200,000.","description":"Integrated bit, fluid and drilling services allowed Halliburton \nto model, measure and optimize continuously, saving 3.6 days. ","path":"/content/dam/ps/public/common/Case_Histories/H010840.pdf","docCreatedDate":"2013-11-04T22:30:00.000-06:00","modifiedDate":"2013-11-05T22:30:00.000-06:00","docdate":"2013-11-04T22:30:00.000-06:00","docrefNum":"H010840","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reducing_Costs,Fluids_Challenges:ROP_Enhancement,|brandgroups:Sperry_Drilling_Services,Baroid,Drill_Bits_&_Services,|locations:North_America,North_America:United_States:Colorado,North_America:United_States,|prodgroups:Well_Construction,Fluids_Solids_Control:Surface_Solutions,"},{"title":"Operator nearly doubled initial well injectivity with proven fluidic oscillator technology","description":"Boots & Coots provided innovative process and comparison for optimizing matrix treatment effectiveness","path":"/content/dam/ps/public/common/Case_Histories/H09502.pdf","docCreatedDate":"2013-01-14T22:30:00.000-06:00","modifiedDate":"2015-01-15T22:30:00.000-06:00","publishDate":"2018-10-02T11:02:20.509-05:00","docdate":"2013-01-14T22:30:00.000-06:00","docrefNum":"H09502","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Boots_&_Coots,|locations:North_America:United_States,North_America,|prodgroups:Stimulation:Water_Management,Intervention:Coiled_Tubing,"},{"title":"One of the largest drilling contracts in the world outsourced to Halliburton","description":"Halliburton Integrated Project Management enabled operator to accelerate field development by delivering 58 wells on turnkey basis","path":"/content/dam/ps/public/common/Case_Histories/H09496.pdf","docCreatedDate":"2012-12-03T22:30:00.000-06:00","modifiedDate":"2012-12-17T22:30:00.000-06:00","publishDate":"2018-10-04T11:53:53.086-05:00","docdate":"2012-12-03T22:30:00.000-06:00","docrefNum":"H09496","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure,Production_Challenges:Unconventional_Resources,Reservoir_Challenges:High_Temperature,|brandgroups:Sperry_Drilling_Services,|locations:North_America:Mexico,|prodgroups:Project_Management,Project_Management:Integrated_Service_Levels:Integrated_Project_Management,Project_Management:Integrated_Service_Levels:Integrated_Services,Project_Management:IPM_Sourcing,Project_Management:Integrated_Projects:Integrated_Well_Construction,Project_Management:Integrated_Well_Completions,Project_Management:Project_Management_Commercial_Models,"},{"title":"Halliburton helped operator reinforce casing to meet new deepwater Gulf of Mexico standards","description":"Halliburton Completion Tools and Baroid teamed for record run \nthat saved a major operator $400,000 of rig time","path":"/content/dam/ps/public/common/Case_Histories/H09809.pdf","docCreatedDate":"2013-03-26T23:30:00.000-05:00","modifiedDate":"2013-08-29T23:30:00.000-05:00","publishDate":"2018-10-02T11:02:21.354-05:00","docdate":"2013-03-26T23:30:00.000-05:00","docrefNum":"H09809","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:North_America,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,North_America:United_States,|prodgroups:Completion_Equipment_and_Services:Liner_Hangers:Expandable_Liner_Hanger,"},{"title":"Halliburton helped assess resource potential and optimize investment decision-making in shale plays","description":"Asset evaluation and risk assessment of unconventional fields","path":"/content/dam/ps/public/common/Case_Histories/H09497.pdf","docCreatedDate":"2012-12-11T22:30:00.000-06:00","modifiedDate":"2012-12-11T22:30:00.000-06:00","docdate":"2012-12-11T22:30:00.000-06:00","docrefNum":"H09497","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Shale,|locations:North_America,North_America:United_States,|prodgroups:Consulting_Services,"},{"title":"PWR Rentals helped operator during emergency situation in North Louisiana","description":"PWR Rentals personnel quickly delivered crane on site to help prevent potential gas well blowout","path":"/content/dam/ps/public/common/Case_Histories/H09105.pdf","docCreatedDate":"2012-11-01T23:30:00.000-05:00","modifiedDate":"2015-01-15T22:30:00.000-06:00","publishDate":"2018-10-02T11:02:15.316-05:00","docdate":"2012-11-01T23:30:00.000-05:00","docrefNum":"H09105","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Boots_&_Coots,|locations:North_America:United_States:Louisiana,North_America:United_States,|prodgroups:Pressure_Control:Rental_Equipment,"},{"title":"European operator secured needed cores to prove subsidence models to government","description":"Halliburton\u2019s 5.5-inch RockStrongTM Coring System delivered larger, undamaged core samples with near 100 percent reliability","path":"/content/dam/ps/public/common/Case_Histories/H09603.pdf","docCreatedDate":"2012-12-13T22:30:00.000-06:00","modifiedDate":"2012-12-13T22:30:00.000-06:00","publishDate":"2018-10-02T11:02:18.603-05:00","docdate":"2012-12-13T22:30:00.000-06:00","docrefNum":"H09603","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Europe,"},{"title":"How Halliburton helped a global energy company lower costs of geothermal wells in Indonesia","description":"Global energy company cuts average drilling time for geothermal wells by 70 percent","path":"/content/dam/ps/public/common/Case_Histories/H08943.pdf","docCreatedDate":"2012-01-06T22:30:00.000-06:00","modifiedDate":"2012-01-06T22:30:00.000-06:00","publishDate":"2018-10-02T11:02:06.256-05:00","docdate":"2012-01-06T22:30:00.000-06:00","docrefNum":"H08943","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Geothermal,Reservoir_Challenges:High_Temperature,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia:Indonesia_Southeastern_Asia,Asia,"},{"title":"SentinelCem™ Cement Cures Losses in Iraq Wells","description":"Cement Treatment Saves Operators\nMillions of Dollars Annually","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/sentinelcem.pdf","docCreatedDate":"2017-07-28T23:30:00.000-05:00","modifiedDate":"2017-09-07T23:30:00.000-05:00","publishDate":"2018-10-02T11:31:31.556-05:00","docdate":"2017-07-28T23:30:00.000-05:00","docrefNum":"H012647","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|locations:Middle_East:Iraq_Middle_East,|prodgroups:Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,"},{"title":"Commander™ Full Bore Case Study - SRC Energy and Halliburton Cementing Enhance Barrier Coverage","description":"H013306","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/SRC-Energy-and-Halliburton-Enhance-Barrier-Coverage-H013306.pdf","docCreatedDate":"2019-10-24T13:58:22.563-04:00","modifiedDate":"2019-10-24T13:58:22.563-04:00","docdate":"2019-10-24T13:58:22.563-04:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Cementing:Casing_Equipment:Surface_Circulating_Equipment,Cementing:Casing_Equipment,"},{"title":"Overcoming Lost Circulation Across Brown Dolomite","description":"An operator was incurring costs associated with loss of circulation events across the brown dolomite section of the Anadarko basin. These costs resulted from non-productive time, remedial operations expenses and fluid-replacement costs and ranged from $120,000-$170,000 (USD) on individual wells. Use of the Arx LCM package not only eliminated multi-stage cementing costs, but helped the operator avoid costs previously experienced due to loss of circulation events across the brown dolomite.","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/A_through_P/Overcoming-Lost-Circulation-Across-Dolomite_H011229.pdf","docCreatedDate":"2014-07-24T23:30:00.000-05:00","modifiedDate":"2014-07-24T23:30:00.000-05:00","docdate":"2014-07-24T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,Reservoir_Challenges:Lost_Circulation-Reservoir_Challenges,|locations:Global,|prodgroups:Cementing:Cementing_Chemistry:Fluid_Loss,"},{"title":"WellLock Resin provides well integrity to withstand forty-two fracturings stages","description":"A casing leak was not successfully repaired with a casing patch. WellLock resin successfully addressed the leak path and after passing a pressure test, the well was completed with 42 fracture stages.","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/Q_through_Z/Well-Integrity-to-Withstand-Forty-Two-Fracturing-Stages_Welllock-Case_Study_H011271.pdf","docCreatedDate":"2014-08-01T23:30:00.000-05:00","modifiedDate":"2014-08-01T23:30:00.000-05:00","docdate":"2014-08-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Extending_Economic_Life:Well_Remediation,|locations:Global,|prodgroups:Cementing:Cementing_Chemistry,Cementing:Environmental_Cementing_Systems,Cementing:Cementing_Solutions,Cementing:Cementing_Solutions:Resins,Cementing:Deep_Water_Cementing:Narrow_Pressure_Margin:Cement_and_Resins,Cementing:Cementing_Products_and_Processes,"},{"title":"Permanent Plug Back - Setting a Plug through the BHA - New Zealand Offshore","description":"Offshore New Zealand, an operator had drilled a pilot hole to gather petrophysical data. Once the data gathering was completed the pilot section needed to be permanently plugged, but accomplished without pulling out the BHA.","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/Q_through_Z/NZ-Setting-a-Plug-through-the-BHA_H011280.pdf","docCreatedDate":"2014-08-19T23:30:00.000-05:00","modifiedDate":"2014-08-19T23:30:00.000-05:00","publishDate":"2018-10-02T11:31:30.657-05:00","docdate":"2014-08-19T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Well_Construction_Challenges,Well_Construction_Challenges:Cross_Flow_Between_Wells,|locations:Global,|prodgroups:Cementing:Cementing_Chemistry,Cementing:Cementing_Products_and_Processes,Cementing:Environmental_Cementing_Systems,Cementing:Cementing_Solutions,Cementing:Cementing_Solutions:Resins,Cementing:Deep_Water_Cementing:Plug_Setting,Cementing:Deep_Water_Cementing:Narrow_Pressure_Margin:Cement_and_Resins,Cementing:Deep_Water_Cementing:Plug_Setting:Chemical_and_Mechanical_Plugs,"},{"title":"Rigless Micro-channel Remedation Using WellLock Resin","description":"A customer in New South Wales, Australia had an onshore coal seam gas well that had undergone an unsatisfactory plug-to-abandon process by a third-party cementing services company. WellLock resin successfully sealed a very narrow micro-channel securing the well for permanent abandonment. ","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/Q_through_Z/WellLock-Resin-Rigless-Micro-Channel-Remediation_H011331.pdf","docCreatedDate":"2014-09-11T23:30:00.000-05:00","modifiedDate":"2014-09-11T23:30:00.000-05:00","publishDate":"2018-10-02T11:31:31.556-05:00","docdate":"2014-09-11T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Extending_Economic_Life:Well_Remediation,|locations:Global,|prodgroups:Cementing:Cementing_Solutions:Resins,Cementing:Deep_Water_Cementing:Plug_Setting,Cementing:Deep_Water_Cementing:Reliability-Well_Integrity,Cementing:Deep_Water_Cementing:Annular_Pressure:Annular_Pressure_Cement_Systems,Cementing:Deep_Water_Cementing:Plug_Setting:Chemical_and_Mechanical_Plugs,Cementing:Deep_Water_Cementing:Reliability-Well_Integrity:Sub-Surface_Reliability,Cementing:Deep_Water_Cementing:Annular_Pressure,"},{"title":"Tuned® Defense™ Helps Mitigate Losses and Enhance Cement Bond Log In UAE Offshore Field","description":"H013345","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/Tuned-Defense-Helps-Mitigate-Losses-in-UAE-H013345.pdf","docCreatedDate":"2019-10-24T13:58:22.489-04:00","modifiedDate":"2019-10-24T13:58:22.489-04:00","docdate":"2019-10-24T13:58:22.489-04:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Cementing:Cementing_Solutions:Lost_Circulation_Materials-Cementing,Cementing:Cementing_Solutions,Cementing:Materials_Chemicals_&_Additives:Spacers_and_Flushes:Tuned_Spacers,Cementing:Materials_Chemicals_&_Additives:Spacers_and_Flushes,Cementing:Cementing_Chemistry:Spacers_and_Flushes:Tuned_Spacers,Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,"},{"title":"Tuned® Defense™ Improves Barrier Dependability and Eliminates Requirement for Remediation in Colombia","description":"H013346","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/Tuned-Defense-Improves-Barrier-Dependability-Colombia-H013346.pdf","docCreatedDate":"2019-10-24T13:58:22.432-04:00","modifiedDate":"2019-10-24T13:58:22.432-04:00","docdate":"2019-10-24T13:58:22.432-04:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Cementing:Cementing_Solutions:Lost_Circulation_Materials-Cementing,Cementing:Cementing_Solutions,Cementing:Materials_Chemicals_&_Additives:Spacers_and_Flushes:Tuned_Spacers,Cementing:Materials_Chemicals_&_Additives:Spacers_and_Flushes,Cementing:Cementing_Chemistry:Spacers_and_Flushes,Cementing:Cementing_Chemistry:Spacers_and_Flushes:Tuned_Spacers,"},{"title":"SentinelCem™ Cement and HYDRO-PLUG® LCM Cure Total Losses for Offshore UAE Operator","description":"H012911","path":"/content/dam/ps/public/cem/contents/Case_Histories/web/SentinelCem-and-HydroPlug-Cure-Total-Losses-UAE-H012911.pdf","docCreatedDate":"2019-06-17T13:53:45.984-04:00","modifiedDate":"2019-06-17T13:53:45.984-04:00","docdate":"2019-06-17T13:53:45.984-04:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Middle_East:United_Arab_Emirates_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Cementing,Cementing:Materials_Chemicals_&_Additives:Cements,Cementing:Cementing_Products_and_Processes:Cement_Designs,"},{"title":"Waterflood Optimization: Maximized Economic Benefits","description":"More than half of the world\u2019s oil is produced through waterflooding. Though waterfloods have been applied in oilfields for several decades, there are many challenges to both further improving project performance and avoiding project failure.","path":"/content/dam/ps/public/consulting/contents/Case_Histories/waterflood-optimization.pdf","docCreatedDate":"2016-06-01T23:30:00.000-05:00","modifiedDate":"2017-08-23T23:30:00.000-05:00","publishDate":"2018-10-02T11:23:11.104-05:00","docdate":"2016-06-01T23:30:00.000-05:00","docrefNum":"H012220","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Improving_Oil_Recovery,|locations:Global,|prodgroups:Consulting_Services:Field_Development_Planning:Improved_Oil_Recovery,"},{"title":"Driving Development Time Reduction in a European IOC\u2019s Offshore Drilling & Completions Processes","description":"To improve the Drilling & Completion processes todecrease the overall development timeline and toimprove the speed and quality of execution.","path":"/content/dam/ps/public/consulting/contents/Case_Histories/Structural-Modeling.pdf","docCreatedDate":"2014-10-30T23:30:00.000-05:00","modifiedDate":"2014-10-26T23:30:00.000-05:00","docdate":"2014-10-30T23:30:00.000-05:00","docrefNum":"H011241","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Hydraulics_Management,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Planning:Bit-Hole_Enlargement_Design,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Preparation,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Rock_Destruction,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Planning:BHA_Design,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Planning:Wellbore_Trajectory_Design,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Planning:Wellbore_Integrity_Analysis,Workflow_Integration:HalDrill:Drilling_Performance,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Mobilization,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Wellbore_Trajectory,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Planning:Drilling_Fluids_Design,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Planning:Hydraulic_Design,Workflow_Integration:HalDrill,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Knowledge_Capture,Workflow_Integration:HalDrill:Drilling_Performance:Drilling_Performance-Execution:Wellbore_Integrity,|locations:Global,|prodgroups:Consulting_Services:Performance_Improvement:Process_Design_and_Optimization,Consulting_Services,"},{"title":"Expanding Field Development Capability for the Ministry of Petroleum of a Middle Eastern Country","description":"The Ministry of Petroleum engaged Halliburton toassess and increase the level of capability regardingthe full field development process within the Ministry\u2019sExploration and Production oversight group.","path":"/content/dam/ps/public/consulting/contents/Case_Histories/Expanding-Field.pdf","docCreatedDate":"2014-10-30T23:30:00.000-05:00","modifiedDate":"2014-10-26T23:30:00.000-05:00","docdate":"2014-10-30T23:30:00.000-05:00","docrefNum":"H011243","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges,Formation_Challenges:Low_Permeability_Formations,|locations:Global,|prodgroups:Consulting_Services,Consulting_Services:Performance_Improvement:Capability_Development,"},{"title":"Design and Implementation Plan for a Large Integrated National Oil Company\u2019s Real-Time Organization\u2014Asia","description":"The project\u2019s main goal was to design a technological solution,together with the organizational structure and the processesrequired.","path":"/content/dam/ps/public/consulting/contents/Case_Histories/Design-Implementation.pdf","docCreatedDate":"2014-10-30T23:30:00.000-05:00","modifiedDate":"2015-01-06T22:30:00.000-06:00","docdate":"2014-10-30T23:30:00.000-05:00","docrefNum":"H011244","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Real_Time_Decisions,|locations:Global,|prodgroups:Consulting_Services:Performance_Improvement:Process_Design_and_Optimization,Consulting_Services:Performance_Improvement:Change_Management,Consulting_Services,"},{"title":"Multi-discipline collaboration using earth model and CYPHER service creates value in Permian Basin.","description":"Laredo Petroleum collaborates with Halliburton to increase reservoir understanding in a multi-target\nunconventional play","path":"/content/dam/ps/public/consulting/contents/Case_Histories/cypher.pdf","docCreatedDate":"2015-08-07T23:30:00.000-05:00","modifiedDate":"2015-09-02T23:30:00.000-05:00","docdate":"2015-08-07T23:30:00.000-05:00","docrefNum":"H011822","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States:Texas,|prodgroups:Integrated_Asset_Management:Unconventional_Field_Development,Integrated_Asset_Management:Mature_Field_Management,Consulting_Services:Unconventional_Resources_Consulting,"},{"title":"Building a Production Management Framework (PMF) for a European Oil and Gas Company","description":"To develop a Production Management Framework (PMF)to standardize procedures and reduce variability in thequality and consistency of information between assets,impacting forecasting accuracy and operational efficiency.","path":"/content/dam/ps/public/consulting/contents/Case_Histories/Production-Management-Framework.pdf","docCreatedDate":"2014-10-30T23:30:00.000-05:00","modifiedDate":"2014-10-26T23:30:00.000-05:00","docdate":"2014-10-30T23:30:00.000-05:00","docrefNum":"H011245","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,Production_Challenges:Production_Maintenance,Production_Challenges:Production_Optimization,|locations:Global,|prodgroups:Consulting_Services:Performance_Improvement:Process_Design_and_Optimization,Consulting_Services,"},{"title":"Canada - SECURE Energy Services Relies on Summit ESP® Horizontal Pumping Systems for Pipeline Operations","description":"Summit ESP® delivers on Kerrobert light oil pipeline system with superior product and service.","path":"/content/dam/ps/public/artificial_lift/contents/Case_Histories/secure-energy-relies-on-summit-esp.pdf","docCreatedDate":"2019-02-01T08:36:00.000-06:00","modifiedDate":"2019-02-01T08:50:18.855-06:00","docdate":"2019-02-01T08:36:00.000-06:00","docrefNum":"H013092","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Artificial_Lift:Horizontal_Pumps,Artificial_Lift,"},{"title":"Ecuador - Halliburton Successfully Installs Dual Completions","description":"Cross-team solution generates USD 18.9 million in revenue for Ecuador operator in over 554 days.","path":"/content/dam/ps/public/artificial_lift/contents/Case_Histories/case-study-halliburton-installs-dual-completions.pdf","docCreatedDate":"2018-08-01T23:30:00.000-05:00","modifiedDate":"2018-08-15T23:30:00.000-05:00","docdate":"2018-08-01T23:30:00.000-05:00","docrefNum":"H012950","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Artificial_Lift:Electric_Submersible_Pumps,Artificial_Lift,"},{"title":"North Dakota - Tiger Shark® II Pump Extends Run Life and Decreases Workover Costs","description":"Revenue increase on average by $1.1 million USD per year, per well.","path":"/content/dam/ps/public/artificial_lift/contents/Case_Histories/tiger-shark-II-pump-extends-run-life.pdf","docCreatedDate":"2019-02-01T08:53:00.000-06:00","modifiedDate":"2019-02-01T08:56:46.131-06:00","docdate":"2019-02-01T08:53:00.000-06:00","docrefNum":"H013093","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Artificial_Lift:Horizontal_Pumps,Artificial_Lift,"},{"title":"Canada - DuraHard™ Coatings Triple Pump Run Life in Extremely Abrasive Environment","description":"Sand is a common and troublesome solid that interferes with production by both abrasion and accumulation. The Charlie Lake formation in Western Canada has significant sand content that forces frequent rod pump maintenance and workovers. ","path":"/content/dam/ps/public/artificial_lift/contents/Case_Histories/Canada-DuraHard-Coatings-Triple-Pump-Run-Life-H013378.pdf","docCreatedDate":"2019-09-10T09:41:00.000-05:00","modifiedDate":"2019-09-10T10:43:17.454-04:00","docdate":"2019-09-10T09:41:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|locations:North_America:Canada,|prodgroups:Artificial_Lift:Electric_Submersible_Pumps,"},{"title":"North Dakota - Summit ESP Doubles Run Life in Bakken","description":"Summit ESP® doubles run life for Bakken Operator, increasing production USD 24 million.","path":"/content/dam/ps/public/artificial_lift/contents/Case_Histories/case-study-summit-esp-bakken.pdf","docCreatedDate":"2018-03-09T22:30:00.000-06:00","modifiedDate":"2018-03-09T22:30:00.000-06:00","docdate":"2018-03-09T22:30:00.000-06:00","docrefNum":"H012858","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Artificial_Lift:Electric_Submersible_Pumps,"},{"title":"Innovative FRACProcess<sup>SM<\/sup> Service Customizes Chemical Dosage to Optimize Friction Reducer Performance","description":"Friction reducers (FRs) are critical to certain unconventional well operations; in particular, slickwater hydraulic fracturing and coiled tubing stimulation applications, where chemicals are added to water to increase fluid flow. When performing a hydraulic fracturing job, operators typically make assumptions about the wellsite\u2019s water quality through direct measurement or approximation via historical data, and then select a FR that will perform through the worst-quality water they expect to encounter.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/FRACProcess-Service-Optimizes-Friction-Reducer-Performance-H012994.pdf","docCreatedDate":"2018-07-10T23:30:00.000-05:00","modifiedDate":"2018-07-10T23:30:00.000-05:00","docdate":"2018-07-10T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Frac_Inefficiencies:Friction_Reducers-Multi-chem,Cementing:Cementing_Chemistry:Friction_Reducers,"},{"title":"Corrosion Monitoring Tools Prove Effectiveness of Chemical Application via Slip-Stream","description":"A Canadian customer was experiencing multiple downhole corrosion failures in their field, and was concerned with the loss of production due to downtime and the cost of repairing these failures, which averaged $10,000 to $15,000\nper well.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Corrosion-Inhibitor-Canada-H011392.pdf","docCreatedDate":"2015-03-11T23:30:00.000-05:00","modifiedDate":"2015-03-11T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:32.899-05:00","docdate":"2015-03-11T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Corrosion_Issues,"},{"title":"MultiSweet<sup>®<\/sup> Scavenger Treatment for H<sub>2<\/sub>S in Sales Oil Keeps Rail Cars Moving","description":"A large midstream energy company in Northeast Canada region was having problems with high H<sub>2<\/sub>S levels at its oil terminals, where some 240 rail cars are loaded daily with sales crude that has levels of H<sub>2<\/sub>S varying from 5 to 80 ppm in the liquid phase.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/MultiSweet-Scavenger-Treatment-H2S-Sales-Oil-H011890.pdf","docCreatedDate":"2015-12-01T22:30:00.000-06:00","modifiedDate":"2015-12-01T22:30:00.000-06:00","publishDate":"2018-10-02T11:21:35.706-05:00","docdate":"2015-12-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Midstream_Solutions,Chemical_Services:Corrosion_Issues,Chemical_Services:H2S_Issues,"},{"title":"Ascend Proprietary Blend of Surfactants Helps Boost Wolfcamp Well Productivity","description":"A major operator was drilling unconventional wells in the Wolfcamp Shale play in Reagan County, Texas where hydraulic fracturing is required to enhance oil and gas recovery. Fracturing fluids utilized in hydraulic fracturing treatments often incorporate surfactant chemistry in order to lower surface tension and capillary pressure so that potentially trapped hydrocarbons can be more readily produced to surface.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Ascend-Proprietary-Blend-of-Surfactants-Helps-Boost-Wolfcamp-Well-Productivity.pdf","docCreatedDate":"2017-09-27T23:30:00.000-05:00","modifiedDate":"2017-09-27T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:36.533-05:00","docdate":"2017-09-27T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Chemical_Services:Stimulation_Chemicals,"},{"title":"Operator in the Gulf of Mexico Successfully Inhibits High Molecular Weight Paraffin","description":"An operator in the deep water Gulf of Mexico developed a subsea gas well through a six mile pipe-in-pipe insulated flowline, and upon first production, it became clearly evident the condensate had much higher paraffin content than anticipated.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/High-Molecular-Weight-Paraffin-Gulf-of-Mexico.pdf","docCreatedDate":"2016-10-05T23:30:00.000-05:00","modifiedDate":"2016-10-05T23:30:00.000-05:00","docdate":"2016-10-05T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Flowline_Issues:Wax_Inhibitors,Stimulation:Acidizing:Paraffin_Control,Chemical_Services:Wax_Deposits:Asphaltene_Inhibitor-Wax_Deposits,"},{"title":"Operator Increases Gas Production Rate by 15% with Foamer","description":"An operator of a mature gas field was previously applying foamer\nto 200 pressure-depleted sweet gas wells spread across a wide geographic area to unload liquids and maximize gas production. The incumbent chemical was an inefficient, low performing well foamer, which caused the operator to incur high injection rates, high treatment costs and high frequency well top-up.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Asia-Pacific-Operator-Increases-Gas-Production-Foamer-H012968.pdf","docCreatedDate":"2018-08-16T23:30:00.000-05:00","modifiedDate":"2018-08-16T23:30:00.000-05:00","docdate":"2018-08-16T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Asia,|prodgroups:Chemical_Services:Liquid_Loading:Foamers-Multi-chem,"},{"title":"Continuous Injection of DeepSure Certified LDHI Outperforms Previous Hydrate Treatment","description":"Hydrate particle formation and deposition is a common problem in Gulf of Mexico deep water oil and gas production systems. Caused by a combination of gas, water, relatively low temperatures and high pressures, hydrate particles tend to agglomerate and deposit on pipe walls. This buildup can occur rapidly and lead to blockages, resulting in lost production and high remediation costs. Therefore, prevention is of utmost importance.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/GOM-Prevent-Hydrate-Blockage-DeepSure-H012998.pdf","docCreatedDate":"2018-08-08T23:30:00.000-05:00","modifiedDate":"2018-08-08T23:30:00.000-05:00","docdate":"2018-08-08T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Deepwater,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Hydrates:Hydrate_Inhibitors,Chemical_Services:Hydrates,"},{"title":"FAL<sup>®<\/sup> Service Proves Safer, More Cost-Effective Than Plunger Lifts","description":"After this customer initially tested Multi-Chem\u2019s FAL<sup>®<\/sup>\n(Foam Assisted Lift) service on two Marcellus Shale wells in their Central Highlands Field, they extended the FAL service trial to four additional wells. Rather\nthan installing costly plunger lifts, the customer chose FAL service in an effort to maintain operational\nexpense, reduce man hours invested in dangerous activity, and reclaim lost production due to the liquid loading.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Foam-Assisted-Lift-East-Coast-H011854.pdf","docCreatedDate":"2015-10-22T23:30:00.000-05:00","modifiedDate":"2015-10-22T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:34.902-05:00","docdate":"2015-10-22T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Liquid_Loading,"},{"title":"Consecutive Treatments Enhance Biocide Efficacy During Water Flooding of Algerian Oilfield","description":"An Algerian operator found it necessary to employ water flooding for optimal production at two of its mature oil and gas fields. The bulk injection water was comprised of a combination of saline produced water diluted with aquifer water.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Algeria-Biocide-Prevent-Corrosion-Injection-Manifold-H013019.pdf","docCreatedDate":"2018-08-16T23:30:00.000-05:00","modifiedDate":"2018-08-16T23:30:00.000-05:00","docdate":"2018-08-16T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Africa:Northern_Africa:Algeria_Northern_Africa,|prodgroups:Chemical_Services:Bacteria_Related_Issues:Biocides,"},{"title":"Infrared Imaging Identifies Composition of Leak Contents, Leads to Solution","description":"When this Operator\u2019s Midland station experienced a leak on a production line that is primarily stagnant, Multi-Chem technical services was contacted to complete a thermal imaging study to identify the contents (gas, oil, water and solids) within the line around the area of the leak.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Midstream-Midland-Infrared-Imaging.pdf","docCreatedDate":"2015-04-08T23:30:00.000-05:00","modifiedDate":"2015-04-08T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:33.583-05:00","docdate":"2015-04-08T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Midstream_Solutions,"},{"title":"Geographic Information System + MVP 2.0™ Chemical Program Management Tool Helps Operator Meet Strict Pipeline Integrity Regulations","description":"An exploration and production company took over a Mid-Continent region pipeline asset from a previous Multi-Chem customer, unaware that encroaching urban expansion now positioned the gathering systems within high consequence areas (HCAs) where\npipeline integrity is strictly regulated to protect human population and environmentally sensitive areas in the event of failure.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Midstream-GIS-MVP-Tool-Improve-Service-H011719.pdf","docCreatedDate":"2015-04-21T23:30:00.000-05:00","modifiedDate":"2015-04-21T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:34.902-05:00","docdate":"2015-04-21T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Midstream_Solutions,"},{"title":"Multi-Chem Customizes Long-Term Corrosion Mitigation in High H<sub>2<\/sub>S Gathering System","description":"This Canadian producer operates a gathering system that produces and transports various volumes of gas, condensate and water from a field where the challenging terrain and quality of production causes both major pipeline corrosion problems and emulsion issues at the gas treatment plant.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/MultiChem-Customizes-Long-Term-Corrosion-H011889.pdf","docCreatedDate":"2015-12-01T22:30:00.000-06:00","modifiedDate":"2015-12-01T22:30:00.000-06:00","publishDate":"2018-10-02T11:21:36.533-05:00","docdate":"2015-12-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Corrosion_Issues,Chemical_Services:Midstream_Solutions,"},{"title":"Remediation of Asphaltenesin Deep Water Wells Results in 2,000 BOPD Production Increase","description":"Multi-Chem was approached by the customer to develop a remediation plan (xylene soak) that would reduce the tubing differential pressure and return production to normal levels. The remedial xylene soak resulted in a 1,550 psi decrease in the tubing differential pressure was decreased by 1,550 psi.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Remediation-Asphaltenes-Deepwater-Production-Increase-H012680.pdf","docCreatedDate":"2018-04-23T23:30:00.000-05:00","modifiedDate":"2018-04-23T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:38.609-05:00","docdate":"2018-04-23T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Chemical_Services:Asphaltene_Tendencies,Chemical_Services:Wax_Deposits:Asphaltene_Inhibitor-Wax_Deposits,"},{"title":"Starting Multi-Chem Scale Control Program at Completion Reduces Workover Costs","description":"A producer in the Rocky Mountains\nrequested a cost-effective scale inhibitor be added to the completion fluid to prevent\ndownhole scale formation in the early stages of the well\u2019s life.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Scale-Control-Southern-Rocky-Mountain-H011393.pdf","docCreatedDate":"2015-03-11T23:30:00.000-05:00","modifiedDate":"2015-03-11T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:33.583-05:00","docdate":"2015-03-11T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Scale_Deposits,Stimulation:Acidizing:Scale_Control,Chemical_Services:Flowline_Issues:Scale_Inhibitors,"},{"title":"Rock-on-a-Chip™ Microfluidic Device Efficiently Evaluates Relative Effects of Surfactants in the Lab","description":"A field trial was recently conducted in the Eagle Ford Shale, across 45 wells completed with similar design criteria, minerology, and frac fluid design, to test performance of the fracturing fluid surfactant selected in our lab via a new technique\u2014Rock-on-a-Chip™ microfluidic device. This technique allows most geometric features observed in shale formations to be recreated digitally through photolithography and etching methods onto the \u201cfingernail-sized\u201d device, for the purpose of investigating fracturing fluid invasion, flowback and hydrocarbon recovery during well stimulation.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Texas-ROC-Device-Efficiently-Evaluates-Effects-Surfactants-H012889.pdf","docCreatedDate":"2018-07-10T23:30:00.000-05:00","modifiedDate":"2018-07-10T23:30:00.000-05:00","docdate":"2018-07-10T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Low_Initial_Production,Chemical_Services:High_Failure_Rates:Surfactants-Multi-chem,"},{"title":"Multi-Chem Delivers Superior Local Service with MultiSweet<sup>®<\/sup> H<sub>2<\/sub>S Scavenging and NGL Conditioning","description":"H<sub>2<\/sub>S levels rose as high as 450 ppm and the operator was unable to sell the gas to the pipeline company, which has a stringent spec limit of up to 4 ppm of H<sub>2<\/sub>S in the gas stream. ","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/MultiSweet-H2S-Scavenging-Rocky-Mountain-H011851.pdf","docCreatedDate":"2015-10-22T23:30:00.000-05:00","modifiedDate":"2015-10-22T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:35.706-05:00","docdate":"2015-10-22T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:H2S_Issues,Chemical_Services:Corrosion_Issues,"},{"title":"Combination Multi-Chem Biocide System Used to Cost-Effectively Save 650,000 Gallons of Water for Re-Use","description":"An operator located in Wheeler, Texas encountered a sudden, emergency bridge plug leak, forcing them to postpone an imminent fracturing treatment for one month during repairs. This unforeseen delay meant that the ready-to-go frac water would be left standing for approximately 30 days in 31 frac tanks on location.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Biocide-Eradicates-Acid-Producing-Bacteria-Frac-Water-H012601.pdf","docCreatedDate":"2017-06-14T23:30:00.000-05:00","modifiedDate":"2017-06-14T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:37.769-05:00","docdate":"2017-06-14T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Bacteria_Related_Issues:Biocides,"},{"title":"Multi-Chem Thermal Imaging Leads to Effective Treatment for Paraffin Buildup","description":"The terminus of the Lynch system line into the Hobbs Station has an approximately 3-foot dead area behind the booster pump injection\nfor the line, where lack of routine flow increases the likelihood of paraffin and asphaltene solids deposition and subsequent corrosion risk from under deposit attacks.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Midstream-Hobbs-Chem-Thermal-Imaging.pdf","docCreatedDate":"2015-04-08T23:30:00.000-05:00","modifiedDate":"2015-04-08T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:33.583-05:00","docdate":"2015-04-08T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Midstream_Solutions,"},{"title":"Bakken Operator Reduces Water Injection by 76%","description":"Multi-Chem worked with a Bakken operator to address a severe salt deposition issue. After relying on high volume fresh water continuous treatments to maintain normal production, a patented halite control product, MX 2-3875, was introduced to control salt precipitation and reduce the required fresh water volumes.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Halite-Inhibitor-Bakken-Operator-Reduces-Water-Injection-H012591.pdf","docCreatedDate":"2017-06-14T23:30:00.000-05:00","modifiedDate":"2017-06-14T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:37.769-05:00","docdate":"2017-06-14T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Scale_Deposits,Chemical_Services:Flowline_Issues:Scale_Inhibitors,Stimulation:Acidizing:Scale_Control,"},{"title":"Unconventional Corrosion Protection Solution Includes Monitoring Assistance in \u2018Problem Area\u2019","description":"One of the country\u2019s largest natural gas distributors needed to clean a 20\u201d dry-gas pipeline and protect it from corrosion without sacrificing the gas quality. When Multi-Chem was challenged to provide a solution, it was determined that any treatment would require oil soluble chemicals in order to maintain dry-gas specs and still be effective. ","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Midstream-North-Louisiana-Unconv-Corrosion.pdf","docCreatedDate":"2015-03-26T23:30:00.000-05:00","modifiedDate":"2015-03-26T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:34.250-05:00","docdate":"2015-03-26T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Midstream_Solutions,"},{"title":"Multi-Chem Identifies Cost-Effective Solvent Solutions for More Efficient Line Pigging","description":"After a cleaning of 1.78 miles of 6\u201d pipe produced a 7-foot paraffin plug at the end of the line, this Midland operator asked Multi-Chem to conduct a solvency test to find a solvent product that would decrease the amount of soluble paraffin solids in the line to improve pigging efficiency.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Midstream-Midland-Cost-Effective-Solvent-Solution.pdf","docCreatedDate":"2015-03-31T23:30:00.000-05:00","modifiedDate":"2015-03-31T23:30:00.000-05:00","publishDate":"2018-10-02T11:21:34.250-05:00","docdate":"2015-03-31T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Midstream_Solutions,"},{"title":"Operator Uses New Drill Bit Technology to Navigate 9½-Inch Horizontal Section Through Chalk and Chert Layers","description":" customized drill bit improves steering response and increases ROP, while maintaining good bit condition","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/operator-uses-new-drill-bit-technology.pdf","docCreatedDate":"2019-09-02T14:13:00.000-05:00","modifiedDate":"2019-10-07T15:15:34.101-04:00","docdate":"2019-09-02T14:13:00.000-05:00","docrefNum":"H013316","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Drill_Bits,"},{"title":"GeoTech, TDReam, and XR Reamer Norway Case History","description":"Case Study for GeoTech, XR Reamer, and TDReam","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/Geotech-XR-TDReam-Norway-CaseStudy.pdf","docCreatedDate":"2015-06-05T23:30:00.000-05:00","modifiedDate":"2015-06-05T23:30:00.000-05:00","docdate":"2015-06-05T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,|locations:Global,|prodgroups:Drill_Bits:Fixed_Cutter_Bits,Hole_Enlargement,"},{"title":"Cruzer Williston Basin December 2017","description":"Operator achieves 43 percent reduction in curve drilling time with Cruzer Depth of Cut control","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/2017-MKTG-DBS-5857-Cruzer-Case-Study.pdf","docCreatedDate":"2017-12-04T22:30:00.000-06:00","modifiedDate":"2017-12-05T22:30:00.000-06:00","docdate":"2017-12-04T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Improving_Drilling_Efficiency,Drilling_Challenges:Drilling_Operational_Efficiency,Drilling_Challenges:Increased_ROP,Reducing_Costs,|locations:Global,|prodgroups:Drill_Bits:Features_and_Cutters,Drill_Bits:Fixed_Cutter_Bits,"},{"title":"DatCI<sup><small>SM<\/sup><\/small> Process Helps Reduce","description":"MegaForce™ Drill Bits Achieve Record ROP\nAcross Russia\u2019s Permian Region","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/design-at-customer-interface-datci-process.pdf","docCreatedDate":"2016-07-20T23:30:00.000-05:00","modifiedDate":"2016-07-20T23:30:00.000-05:00","docdate":"2016-07-20T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Drill_Bits:Fixed_Cutter_Bits,"},{"title":"Identifying Damaging and Performance-Hindering Vibrations ","description":"Cerebro™ electronic data capture at the bit mitigates stick-slip, while improving rop and bit conditions","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/identifying-damaging-and-performance-hindering-vibrations.pdf","docCreatedDate":"2019-04-01T09:26:00.000-05:00","modifiedDate":"2019-05-22T10:27:45.380-04:00","docdate":"2019-04-01T09:26:00.000-05:00","docrefNum":"H013214","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Drill_Bits:Drill_Bit_Optimization-Drill_Bits,"},{"title":"Operator Sets New Record High-ROP Drilling Through Formation of Claystone and Limestone Stringers","description":"Geo-Pilot® RSS with innovative bit, featuring Geotech® technology, outperforms offset wells","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/operator-sets-new-record-high-rop.pdf","docCreatedDate":"2019-09-02T14:28:00.000-05:00","modifiedDate":"2019-10-07T15:34:37.075-04:00","docdate":"2019-09-02T14:28:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Europe:Northern_Europe:Norway_Northern_Europe,|prodgroups:Drill_Bits,"},{"title":"Operator Uses Customized Bit Design to Drill 6½-Inch Section in Chert-Ridden Chalk Reservoir","description":"Innovative gtd54dk drill bit improves cutting performance and bit condition","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/operator-uses-customized-bit-design .pdf","docCreatedDate":"2019-09-02T14:21:00.000-05:00","modifiedDate":"2019-10-07T15:23:48.013-04:00","docdate":"2019-09-02T14:21:00.000-05:00","docrefNum":"H013315","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Drill_Bits,"},{"title":"Усовершенствование долот в процессе непосредственного взаимодействия с заказчиком ( DatCI) позволило сократить срок строительства скважины до 43,5%","description":"ОПЫТ РАБОТ В ПЕРМСКОМ КРАЕ \u2013 С 2013 Г. ПО НАСТОЯЩЕЕ ВРЕМЯ","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/design-at-customer-interface-datci-process-ru.pdf","docCreatedDate":"2016-06-28T23:30:00.000-05:00","modifiedDate":"2016-07-20T23:30:00.000-05:00","docdate":"2016-06-28T23:30:00.000-05:00","docrefNum":"H012243","languageSet":["Russian"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Asia:Northern_Asia:Russia_Northern_Asia,|prodgroups:Drill_Bits:Fixed_Cutter_Bits,"},{"title":"Williston Basin Operator Drills Through Unconventional Well Curve in 4.9 Hours","description":"Halliburton's Cruzer™ Depth-of-Cut\nRolling Element sets basin record in North Dakota.","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/cruzer-williston-basin-case-study.pdf","docCreatedDate":"2017-09-25T23:30:00.000-05:00","modifiedDate":"2017-09-29T23:30:00.000-05:00","docdate":"2017-09-25T23:30:00.000-05:00","docrefNum":"H012693","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|brandgroups:Drill_Bits_&_Services,|locations:Global,|prodgroups:Drill_Bits:Features_and_Cutters,Drill_Bits:Fixed_Cutter_Bits,"},{"title":"Operator Sets New Benchmark Drilling Long Lateral in S-Shaped Well ","description":"Cruzer™ depth-of-cut rolling element increases ROP and improves Geosteering control to reach total depth in just one run.","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/operator-sets-new-benchmark-drilling-long-lateral-s-shaped-well.pdf","docCreatedDate":"2019-10-29T09:57:00.000-05:00","modifiedDate":"2019-10-29T11:00:57.382-04:00","docdate":"2019-10-29T09:57:00.000-05:00","docrefNum":"H013235","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Drill_Bits,"},{"title":"InnerVue™ PipeSuite Survey Accurately Predicts Stuck Pig Location Within 0.4%","description":"Halliburton Pipeline and Process\nServices was contracted to conduct\nInnerVue™ PipeSuite surveys on a 16-in. crude oil pipeline located 125 miles offshore in the Gulf of Thailand. The objective of the survey operation was to locate the position of a pig mandrel stuck in the pipeline.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/Thailand-Operator-Uses-Pressure-Blocked-Pipeline-H012751.pdf","docCreatedDate":"2018-07-30T23:30:00.000-05:00","modifiedDate":"2018-07-30T23:30:00.000-05:00","docdate":"2018-07-30T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,Pipeline_and_Process_Services:Pipeline_Maintenance_Services,"},{"title":"Operator Quickly Diagnoses Root Cause of Back Pressure in Pipeline","description":"The operator of a crude oilfield located in the Bombay Offshore Basin, 60-90km from Mumbai, India, needed to get to the root cause of pipeline back pressure that was adversely impacting production, by greater than 25% throughput reduction, after months of pipeline flow deterioration.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/India-Operator-Diagnoses-Back-Pressure-Pipeline-H012673.pdf","docCreatedDate":"2018-04-03T23:30:00.000-05:00","modifiedDate":"2018-04-03T23:30:00.000-05:00","publishDate":"2018-10-02T13:09:03.292-05:00","docdate":"2018-04-03T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Deepwater,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Pipeline_Maintenance_Services,Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,"},{"title":"InnerVue™ PipeSuite Diagnostics Accurately Predicts Stuck Pig Location","description":"The customer was experiencinga stuck pig in its pipeline, located in North Dakota. This occurred during a routine pigging operation, when a cup pig got stuck in the pipeline\u2014most likely due to the accumulation of paraffin wax in front of the pig.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/USA-ND-Operator-PressureWave-Plan-Stuck-Pig-Retrieval-H012753.pdf","docCreatedDate":"2017-10-24T06:18:00.000-05:00","modifiedDate":"2018-05-23T23:30:00.000-05:00","docdate":"2017-10-24T06:18:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,Pipeline_and_Process_Services:Pipeline_Maintenance_Services,"},{"title":"Pipeline Operator Gains Key Information on Severe Wax Deposits in Critical Pipeline","description":"The operator of an 8-inch subsea oil\nproduction pipeline, running in daisy-chain fashion from Crathes to the Kittiwake platform in the North Sea, experienced severe pipeline restrictions caused by paraffin wax deposits.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/North-Sea-UK-Pipeline-Operator-Severe-Wax-Deposits-H012675.pdf","docCreatedDate":"2018-04-03T23:30:00.000-05:00","modifiedDate":"2018-04-03T23:30:00.000-05:00","publishDate":"2018-10-02T13:09:04.215-05:00","docdate":"2018-04-03T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Deepwater,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Pipeline_Maintenance_Services,Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,"},{"title":"Operator Efficiently Resolves Pigging Complications During Offshore Pipeline Wax Removal","description":"The operator of an offshore UK\n8-in condensate export pipeline\nrunning from the Lomond platform\nto the CATS platform in the North\nSea was initially dealing with\nrestrictions caused by wax buildup\u2014common to many condensates containing dissolved waxes that can precipitate and deposit under certain environmental conditions.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/North-Sea-UK-Operator-Resolves-Pigging-Complications-Pipeline-Wax-Removal-H012672.pdf","docCreatedDate":"2018-04-03T23:30:00.000-05:00","modifiedDate":"2018-04-03T23:30:00.000-05:00","publishDate":"2018-10-02T13:09:03.292-05:00","docdate":"2018-04-03T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,Pipeline_and_Process_Services:Pipeline_Maintenance_Services,"},{"title":"Operator Uses Pressure Wave Technology to Accurately Locate Stuck Tool in High-Risk Pipeline","description":"An operator in South Texas was losing valuable production uptime due to an intelligent inspection tool being stuck in one of its pipelines transporting \u2018supercritical\u2019 ethylene\u2014at a temperature and pressure above its critical point.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/USA-Operator-Uses-Pressure-Wave-Technology-Stuck-Tool-H012674.pdf","docCreatedDate":"2018-04-03T23:30:00.000-05:00","modifiedDate":"2018-04-03T23:30:00.000-05:00","publishDate":"2018-10-02T13:09:03.292-05:00","docdate":"2018-04-03T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,Pipeline_and_Process_Services:Pipeline_Maintenance_Services,"},{"title":"InnerVue™ WellSuite Diagnostics Accurately Detects Restrictions in Horizontal Well","description":"A multiphase producing well in Vaca Muerta field in the Neuquen province of Argentina was producing sand from a perforated zone in the well\u2019s horizontal section. After about six months of production, the sand was causing a partial blockage in the wellbore and responsible for production inefficiencies.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/Argentina-InnerVue-Detects-Blockage-Horizontal-Well-H013024.pdf","docCreatedDate":"2018-08-20T23:30:00.000-05:00","modifiedDate":"2018-08-20T23:30:00.000-05:00","docdate":"2018-08-20T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Pipeline_Maintenance_Services,Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,"},{"title":"InnerVue™ WellSuite Survey Precisely Locates Blockage","description":"Halliburton Sakhalin Limited was contracted by a Major Operator to perform a InnerVue™ WellSuite survey in annular space between the 9-5/8-in. and 7-in. casings. This annulus was being used in normal operation to inject water into the waste disposal well (WDW)\u2014located at the wellsite in the remote region of northeastern Russia.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/Russia-Analyze-Sand-Blockage-Water-Injection-H012752.pdf","docCreatedDate":"2017-10-15T06:20:00.000-05:00","modifiedDate":"2018-05-23T23:30:00.000-05:00","docdate":"2017-10-15T06:20:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,Pipeline_and_Process_Services:Pipeline_Maintenance_Services,"},{"title":"InnerVue™ PipeSuite Surveys Used for Comparative Analysis","description":"Two InnerVue™ PipeSuite surveys were carried out onboard the offshore platform in the Gulf of Mexico. The first survey operation was to establish a baseline of the wax deposition accumulated inside a 12-in. export oil pipeline\u2014running from the platform out to the Gathering\u2018Y\u2019 tie-in.","path":"/content/dam/ps/public/pps/contents/Case_Histories/web/GOM-Operator-Measures-Impact-Pipeline-Remediation-Treatment-H012754.pdf","docCreatedDate":"2017-10-08T06:20:00.000-05:00","modifiedDate":"2018-06-06T23:30:00.000-05:00","docdate":"2017-10-08T06:20:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Pipeline_and_Process_Services:Pipeline_Maintenance_Services,Pipeline_and_Process_Services:Flow_Assurance-PPS:Pipeline_and_Wellbore_Diagnostics,"},{"title":"Prodigi™ Intelligent Fracturing Service Eliminates Screenouts in Challenging Field","description":"Innovative Service Delivers More Consistent Stage-To-Stage Execution Than Traditional Methods","path":"/content/dam/ps/public/pe/contents/Data_Sheets/web/H/H013167-Prodigi-Eliminates-Screenouts.pdf","docCreatedDate":"2019-03-31T13:24:00.000-05:00","modifiedDate":"2019-05-08T14:29:23.616-04:00","docdate":"2019-03-31T13:24:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,"},{"title":"SPECTRUM® Service Helps Operator Improve Production Performance Up to 25 Percent","description":"Real-Time Coiled Tubing Service Shortens Time For Completion Evaluation and Reduces Costs","path":"/content/dam/ps/public/pe/contents/Data_Sheets/web/H/H013169-Spectrum-Helps-Operator-Improve.pdf","docCreatedDate":"2019-04-30T13:48:00.000-05:00","modifiedDate":"2019-05-08T14:54:26.811-04:00","docdate":"2019-04-30T13:48:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,"},{"title":"Prodigi™ Intelligent Fracturing Service Enables Operator to Optimize Cluster Efficiencies","description":"Innovative Service Improves Well Performance With More Evenly Distributed Fractures Along Wellbore","path":"/content/dam/ps/public/pe/contents/Data_Sheets/web/H/H013170-Prodigi-Enables-Operator-To-Optimize.pdf","docCreatedDate":"2019-03-31T13:37:00.000-05:00","modifiedDate":"2019-05-08T14:45:18.334-04:00","docdate":"2019-03-31T13:37:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,"},{"title":"Carrizo Oil and Gas Improve Well Performance in Multi-Well AccessFrac® Service Field Study","description":"Carrizo Oil and Gas used AccessFrac® stimulation service on a large-scale field trial in the Eagle Ford shale play in an effort to increase the number of effectively stimulated perforation clusters and to improve well performance. Results have shown the wells utilizing the AccessFrac service maintain higher flowing pressures indicating an increase in stimulated reservoir volume.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/accessfrac-carrizo-fiber-optic.pdf","docCreatedDate":"2016-05-20T23:30:00.000-05:00","modifiedDate":"2016-05-20T23:30:00.000-05:00","docdate":"2016-05-20T23:30:00.000-05:00","docrefNum":"H011982","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Stimulation,Stimulation:Fracturing,"},{"title":"PermStim service case study in the Eagle Ford","description":"PermStim™ fracturing fluid system helps Magnum Hunter\r\nResources increase production in the Eagle Ford Shale","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/H010560_PermStim_Case_Study.pdf","docCreatedDate":"2013-08-13T23:30:00.000-05:00","modifiedDate":"2013-08-13T23:30:00.000-05:00","docdate":"2013-08-13T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Shale_Field_Development,Formation_Challenges:Shale,|locations:Global,|prodgroups:Fluids_Solids_Control:Stimulation_Fluids,Stimulation:Fracturing,"},{"title":"Lo-Gard Success in Brazil","description":"Advanced fluid loss control technology helps achieve successful gravel pack.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/lo-gard-brazil-H08994.pdf","docCreatedDate":"2012-03-01T22:30:00.000-06:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2012-03-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"AccessFrac Service Used to Restimulate Well with Casing Integirty","description":"AccessFrac service helps restimulate a well with collapsed casing in the Barnett Shale. ","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/accessfrac-biovert-restim-casing-integrity-H08475.pdf","docCreatedDate":"2011-07-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2011-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"Produced Water Use in the Mid-Con","description":"Water technologies address drought conditions in the Mid-Con.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/produced-water-use-mid-con-H09060.pdf","docCreatedDate":"2012-03-01T22:30:00.000-06:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2012-03-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"AccessFrac® Stimulation Service Improves Cluster Efficiency Without Quantifying Stresses","description":"The limited availability of diagnostic data for multiple wells in Oklahoma hindered the operators\u2019 ability to effectively design a limited-entry perforating scheme, along with stimulation treatments. AccessFrac® stimulation service was deployed in an attempt to improve cluster efficiency and ultimate recovery from the wells. Wells utilizing AccessFrac service showed initial production rates 2.7 to 3.2 times higher than comparable offsets.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/accessfrac-diversion-pressure.pdf","docCreatedDate":"2016-05-20T23:30:00.000-05:00","modifiedDate":"2016-05-20T23:30:00.000-05:00","docdate":"2016-05-20T23:30:00.000-05:00","docrefNum":"H012046","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Stimulation,Stimulation:Fracturing,"},{"title":"RapidStage® Systems Provide Game-Changing Operational Efficiencies to Mature Field","description":"First successful multistage fracturing treatment performed in Kuwait","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/rapidstage-systems.pdf","docCreatedDate":"2016-07-01T23:30:00.000-05:00","modifiedDate":"2016-09-13T23:30:00.000-05:00","docdate":"2016-07-01T23:30:00.000-05:00","docrefNum":"H012259","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Frac_Sleeve_Systems,"},{"title":"CobraMax DM Success in Marcellus","description":"CobraMax DM service enables 30 interval fracturing operation in the Marcellus Shale.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/cobramax-dm-marcellus-H08532.pdf","docCreatedDate":"2011-07-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2011-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"AccessFrac Service Used to Restimulate Well","description":"Successful Restimulation of Barnett Shale Well Using\nBiodegradable AccessFrac service in Barnett Shale.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/accessfrac-biovert-restim-H08473.pdf","docCreatedDate":"2011-06-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2011-06-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"AccessFrac PD Case History","description":"AccessFrac PD service helps avert loss of well and cuts completion time by over 50%.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/accessfrac-pd-H09435.pdf","docCreatedDate":"2012-07-02T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2012-07-02T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"CobraMax H Success in Canada","description":"CobraMax H service used to complete six fracturing treatments in 50 hours in Canada.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/cobramax-h-canada-H05983.pdf","docCreatedDate":"2009-09-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2009-09-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"AccessFrac Service Used to Overcome Casing Integrity","description":"AccessFrac service helps overcome casing integrity issues for a successful stimulation in the Barnett Shale.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/accessfrac-biovert-casing-integrity-H08474.pdf","docCreatedDate":"2011-07-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2011-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"Transcend Permeaiblity Enhancers Improve Well Performance","description":"Customized chemistry results in increased production","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/Transcend-Permeability-Enhancers-Midland-Basin-Permian.pdf","docCreatedDate":"2017-06-22T23:30:00.000-05:00","modifiedDate":"2017-06-22T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:27.135-05:00","docdate":"2017-06-22T23:30:00.000-05:00","docrefNum":"H012610","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"Wells with OilPerm™ surfactants and formation fluid mobility modifiers (FMMs) performed 300% better than similar wells on 30-day cumulative oil production","description":"How custom chemistry increases production over the life of wells","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/RockPerm-Service-Case-Study-HO11790-v2.pdf","docCreatedDate":"2015-06-01T23:30:00.000-05:00","modifiedDate":"2015-06-17T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:23.457-05:00","docdate":"2015-06-01T23:30:00.000-05:00","docrefNum":"H011790","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Production_Optimization,|locations:Global,|prodgroups:Stimulation,Stimulation:Fracturing,"},{"title":"Proprietary diversion technique succeeds in difficult non-cemented lateral","description":"Halliburton\u2019s AccessFrac® Service overcomes non-cemented lateralenvironment to accomplish diversion, provide stimulation,and deliver superior production.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/accessfrac-service.pdf","docCreatedDate":"2014-12-01T22:30:00.000-06:00","modifiedDate":"2015-02-18T22:30:00.000-06:00","docdate":"2014-12-01T22:30:00.000-06:00","docrefNum":"H011529","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States:Oklahoma,|prodgroups:Stimulation:Fracturing,Stimulation:Shale_Production:Cluster_Efficiency,Consulting_Services:Unconventional_Resources_Consulting:Execution_in_Unconventionals,Stimulation:Shale_Production:Complete_Operations_Efficiency,"},{"title":"Calibr℠ and SandWedge® Services Reduce Sand Flowback","description":"A combo solution significantly increases production","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/sandwedge-cabibr-permian-basin.pdf","docCreatedDate":"2017-08-23T23:30:00.000-05:00","modifiedDate":"2017-08-23T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:32.181-05:00","docdate":"2017-08-23T23:30:00.000-05:00","docrefNum":"H012655","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"CobraMax DM Service Case History: East Texas","description":"A Low Risk and Efficient Operation Maximizing Stimulated Reservoir Volume in the Austin Chalk","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/H010238-CobraMax-DM-CH.pdf","docCreatedDate":"2013-05-28T23:30:00.000-05:00","modifiedDate":"2013-05-28T23:30:00.000-05:00","docdate":"2013-05-28T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:North_America:United_States:Texas,|prodgroups:Stimulation:Fracturing:Pinpoint_Stimulation,Stimulation:Fracturing:Pinpoint_Stimulation:Reservoir__Diversion,Stimulation:Fracturing:Pinpoint_Stimulation:Stress_Induced_Complexity,"},{"title":"Halliburton Integrated Well Intervention Vessel (IWIV) Spearheads Operational Efficiency in Gravel Packing","description":"Halliburton recommended the deployment of an Integrated Well Intervention Vessel (IWIV) to perform a gravel-pack treatment in Malaysia which shortened a 14-day operation to just 36 hours.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/integrated-well-intervention-vessel-malayasia.pdf","docCreatedDate":"2017-04-25T23:30:00.000-05:00","modifiedDate":"2017-04-25T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:26.032-05:00","docdate":"2017-04-25T23:30:00.000-05:00","docrefNum":"H012529","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Deepwater,|locations:Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,|prodgroups:Stimulation:Vessels,Stimulation,"},{"title":"AccessFrac Stimulation in Northeast","description":"AccessFrac Stimulation service allows recovery of stranded reserves","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/AccessFrac-Stimulation-Northeast.pdf","docCreatedDate":"2017-04-06T23:30:00.000-05:00","modifiedDate":"2017-04-06T23:30:00.000-05:00","docdate":"2017-04-06T23:30:00.000-05:00","docrefNum":"H011982","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Improve_Reservoir_Productivity,Production_Challenges:Production_Optimization,Production_Challenges:Unconventional_Resources,|locations:Global,"},{"title":"MicroScout® Service Enhances Well Production in Woodford Shale Play","description":"MicroScout Service improves production rates by 10-15 percent","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/MidCon-Microscout-CaseStudy-H012254.pdf","docCreatedDate":"2018-07-16T23:30:00.000-05:00","modifiedDate":"2016-08-29T23:30:00.000-05:00","docdate":"2018-07-16T23:30:00.000-05:00","docrefNum":"H012254","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Improve_Reservoir_Productivity,Formation_Challenges:Shale,|locations:Global,|prodgroups:Stimulation:Fracturing,"},{"title":"RockPerm Clay Control Service Enhances Well Performance","description":"Fracture face stabilization chemicals reduce formation damage","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/RockPerm-Clay-Control-Service-Midland-Basin.pdf","docCreatedDate":"2017-06-22T23:30:00.000-05:00","modifiedDate":"2017-06-22T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:27.135-05:00","docdate":"2017-06-22T23:30:00.000-05:00","docrefNum":"H012149","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"AccessFrac® Stimulation Service Improves Production","description":"AccessFrac stimulation service helps improve well productivity in Permian Basin","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/AccessFrac-PermianBasin-Improved-Well-Productivity.pdf","docCreatedDate":"2017-06-20T23:30:00.000-05:00","modifiedDate":"2017-06-20T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:26.032-05:00","docdate":"2017-06-20T23:30:00.000-05:00","docrefNum":"H012358","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"Prodigi™ Intelligent Fracturing Service Eliminates Poor Proppant Distribution to Clusters While Pumping","description":"Innovative service enables more efficient formation Breakdown and improves well productivity","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/H013299-Prodigi-Case-Study-Permian.pdf","docCreatedDate":"2019-07-12T12:37:00.000-05:00","modifiedDate":"2019-07-12T13:43:10.289-04:00","docdate":"2019-07-12T12:37:00.000-05:00","docrefNum":"H013299","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,|prodgroups:Production_Solutions,"},{"title":"Water Solutions in the Permian Basin","description":"Halliburton water solutions helped a Permian Basin operator save money and water","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/S_through_Z/water-solutions-permian-H09855.pdf","docCreatedDate":"2013-05-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2013-05-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"Kuwait Oil Company now produces more than 1000 barrels of oil per day from wells that had not produced anything for 15+ years. ","description":"SurgiFrac® NWB Service created microfractures that helped avoid gas breakthrough from nearby zone.\n","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/S_through_Z/SurgiFrac.pdf","docCreatedDate":"2015-02-02T22:30:00.000-06:00","modifiedDate":"2015-02-19T22:30:00.000-06:00","docdate":"2015-02-02T22:30:00.000-06:00","docrefNum":"H011612","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Middle_East:Kuwait_Middle_East,|prodgroups:Intervention:Downhole_Tools-Boots_&_Coots:Pinpoint_Stimulation-Boots-Coots,Stimulation:Unconventional_Reservoirs-Stimulation:Shale_Stimulation,Stimulation,"},{"title":"Halliburton stimulation treatment increases well\u2019s production by 13,093 barrels of oil per day in an HP/HT reservoir","description":"Successful acid stimulation treatment exceeds customer expectations","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/S_through_Z/sigma-services-process.pdf","docCreatedDate":"2015-11-20T22:30:00.000-06:00","modifiedDate":"2015-11-20T22:30:00.000-06:00","docdate":"2015-11-20T22:30:00.000-06:00","docrefNum":"H011987","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure,Reservoir_Challenges:High_Temperature,|locations:Global,|prodgroups:Chemical_Services:Acidizing-Near-Wellbore_Cleanout,Stimulation:Acidizing,"},{"title":"Transcend Permeability Enhancers Improve Production in Permian","description":"Transcend Permeability Enhancers improve production in Delaware Basin, Texas","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/S_through_Z/transcend-delaware-basin.pdf","docCreatedDate":"2017-08-02T23:30:00.000-05:00","modifiedDate":"2017-08-02T23:30:00.000-05:00","docdate":"2017-08-02T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Production_Challenges:Production_Optimization,|locations:Global,"},{"title":"StimWatch Stimulation Service","description":"StimWatch stimulation monitoring service optimizes acid stimulation","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/S_through_Z/stim-watch-acid-stimulation-H09116.pdf","docCreatedDate":"2012-03-01T22:30:00.000-06:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2012-03-01T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"Carbonate 20/20SM Acidizing Service Eliminates Need for Proppant, Adds More Than $1.5 Million in Value","description":"After being shot; a 16;000 foot well in a Cotton Valley Formation was still only flowing at 8.2 mmcfpd at 1;680 psi FTP with a positive skin. To increase production; the operator wanted to fracture the well with proppant but had not previously pumped into it.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/evc/1624.asp","docCreatedDate":"2006-05-09T23:30:00.000-05:00","modifiedDate":"2006-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:35.918-05:00","docdate":"2006-05-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Low_Permeability_Formations,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Stimulation:Acidizing,"},{"title":"HydroChek® Service Restores 5;000 BPD of Oil Production; Adds $35 Million in Value (Case History)","description":"A 2;700 foot well in a Cretacio Inferior Formation had to be shut in after just one-and-a-half years because of excessive water production. ","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/evc/4687.asp","docCreatedDate":"2006-05-09T23:30:00.000-05:00","modifiedDate":"2006-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:35.918-05:00","docdate":"2006-05-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Low_Permeability_Formations,Production_Challenges:Unconventional_Resources,|locations:Global,"},{"title":"ZCA Acid System and Carbonate 20/20 Service (SM) Increase Oil Production by over $233;000 (Case History)","description":"An operator had drilled a 9;746 foot well and was considering its ASL limestone formation as a potential zone. However; after it went into production; the well barely produced at a measurable rate; and most of that production was water with traces of oil.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/evc/893.asp","docCreatedDate":"2006-05-09T23:30:00.000-05:00","modifiedDate":"2006-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:35.918-05:00","docdate":"2006-05-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Low_Permeability_Formations,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Stimulation:Acidizing,"},{"title":"SurgiFracSM Service Used to Stimulate Open-Hole Lateral Adds More Than $927;000 in Value in Just Six Months (New Mexico)","description":"A 2;000-ft open-hole lateral had been drilled in a 4;600-ft Yeso formation well�in a mature�field that the operator believed was depleted. After the lateral was cleaned out and an acid wash hadbeen performed; the well still failed to produce oil. To revive the well; the operator asked Halliburton for an effective method to stimulate the entire lateral and connect it to the formation's natural fracture system.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/evc/4778.asp","docCreatedDate":"2006-05-09T23:30:00.000-05:00","modifiedDate":"2006-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T11:39:35.918-05:00","docdate":"2006-05-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Formation_Challenges:Low_Permeability_Formations,Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Stimulation:Acidizing,Stimulation:Fracturing,Stimulation:Fracturing:Pinpoint_Stimulation:Fracture_Intensity,Stimulation:Fracturing:Pinpoint_Stimulation,"},{"title":"Multistage Stimulation Process Executes a Record Number of Fracture Stages","description":"The majority of the wells in the Eagle Ford are completed using the plug-and-perf method. This method requires a full-wellbore inside diameter to allow the bottomhole assembly (BHA) to reach the desired target depths.","path":"/content/dam/ps/public/bc/contents/Case_Histories/CobraMax-Multistage-stimulation-process-executes-record-number-fracture-stages.pdf","docCreatedDate":"2017-03-15T23:30:00.000-05:00","modifiedDate":"2017-03-15T23:30:00.000-05:00","docdate":"2017-03-15T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Intervention:Coiled_Tubing,Intervention:Coiled_Tubing:Coiled_Tubing_Tools,Intervention:Coiled_Tubing:Tools-Coiled_Tubing,Intervention:Downhole_Tools-Boots_&_Coots:Pinpoint_Stimulation-Boots-Coots,"},{"title":"Operator in Saudi Arabia Optimizes Milling Performance via Real-Time Coiled Tubing Data","description":"SPECTRUM Intervention Services Enables AccurateDownhole Motor Positioning and Flawless Operationon Critical Well Mill Out","path":"/content/dam/ps/public/bc/contents/Case_Histories/spectrum-intervention-services.pdf","docCreatedDate":"2016-03-21T23:30:00.000-05:00","modifiedDate":"2016-03-21T23:30:00.000-05:00","docdate":"2016-03-21T23:30:00.000-05:00","docrefNum":"H012151","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reducing_Costs,Reservoir_Challenges:Mature_Fields,Well_Construction_Challenges,Deepwater,Well_Construction_Challenges:Well_Repair,Reduce_Nonproductive_Time,Real_Time_Decisions,Workflow_Integration:HalProduce,Production_Challenges:Scale_Removal,Deepwater:Increase_Reliability,Deepwater:Reduce_Uncertainty,Extending_Economic_Life,Production_Challenges:Completion_Integrity,|locations:Middle_East:Saudi_Arabia_Middle_East,Global,|prodgroups:Intervention:Coiled_Tubing,Intervention:Coiled_Tubing:Real-Time_Coiled_Tubing,Intervention,"},{"title":"Kuwaiti Operator Efficiently Performs Complex Horizontal Well Intervention in a Single Run","description":"A well intervention was required to close the lowermost sleeve of the last two producing ICDs, ensuring accurate depth control and optimizing the use of resources to minimize production downtime. SPECTRUM<sup>SM<\/sup> Intervention and Diagnostic Services provided a cost-effective solution to identify, clean, evaluate a fluid injection test and close the sleeve\u2014all in a single run.","path":"/content/dam/ps/public/bc/contents/Case_Histories/Kuwait-Operator-Efficiently-Performs-Complex-Horizontal-Well-Intervention.pdf","docCreatedDate":"2017-06-26T23:30:00.000-05:00","modifiedDate":"2017-06-26T23:30:00.000-05:00","docdate":"2017-06-26T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Middle_East:Kuwait_Middle_East,|prodgroups:Intervention:Coiled_Tubing:Real-Time_Coiled_Tubing,Intervention:Coiled_Tubing,Intervention,"},{"title":"Hydra-JetTM SPT system proves to be an immediate-impact solution for well offshore Mexico","description":"First selective acid stimulation in Latin America with Halliburton\nself-positioning tool (SPT) in openhole section restarts production and extends well life.","path":"/content/dam/ps/public/bc/contents/Case_Histories/H011842-HydraJetMexico.pdf","docCreatedDate":"2015-08-07T23:30:00.000-05:00","modifiedDate":"2015-08-07T23:30:00.000-05:00","docdate":"2015-08-07T23:30:00.000-05:00","docrefNum":"H011842","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Intervention:Downhole_Tools-Boots_&_Coots,"},{"title":"Plug Drill Out Solution in Eagle Ford eliminates short trips","description":"An operators in the Eagle Ford wanted to drill out plugs more efficiently, eliminating short trips. Halliburton's Drill Out Solutions Package from Boots & Coots made it happen.","path":"/content/dam/ps/public/bc/contents/Case_Histories/H011134_PlugDrillOut.pdf","docCreatedDate":"2015-01-05T22:30:00.000-06:00","modifiedDate":"2015-01-14T22:30:00.000-06:00","docdate":"2015-01-05T22:30:00.000-06:00","docrefNum":"H011134","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Formation_Challenges:Shale,|brandgroups:Boots_&_Coots,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Unconventional_Completions:Surface_Flowback_Equipment,Intervention:Downhole_Tools-Boots_&_Coots,Intervention:Coiled_Tubing,Pressure_Control:Rental_Equipment,Intervention,"},{"title":"Innovative perforation technique shifts paradigm and helps production excel","description":"Halliburton\u2019s Hydra-JetSM TS Perforating application overcomesexcessive formation damage and boosts anticipated production 313%.","path":"/content/dam/ps/public/bc/contents/Case_Histories/HydraJet-Equador-Case-Study.pdf","docCreatedDate":"2015-01-05T22:30:00.000-06:00","modifiedDate":"2015-03-23T23:30:00.000-05:00","docdate":"2015-01-05T22:30:00.000-06:00","docrefNum":"H011547","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Intervention:Downhole_Tools-Boots_&_Coots,Intervention:Coiled_Tubing:Coiled_Tubing_Tools,Intervention:Coiled_Tubing:Tools-Coiled_Tubing,Intervention:Downhole_Tools-Boots_&_Coots:Pinpoint_Stimulation-Boots-Coots,"},{"title":"SPECTRUM Diagnostic Services Evaluates Fracture Effectiveness Leading to Lower Completions Costs","description":"SPECTRUM Diagnostic Services Identifies Improvementin Stimulation Cluster Efficiency ","path":"/content/dam/ps/public/bc/contents/Case_Histories/spectrum-diagnostic-services.pdf","docCreatedDate":"2016-03-21T23:30:00.000-05:00","modifiedDate":"2016-03-21T23:30:00.000-05:00","docdate":"2016-03-21T23:30:00.000-05:00","docrefNum":"H012154","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Maintenance_Challenges:Well_Injectivity,Workflow_Integration:HalComplete:Shale_Field_Development,Production_Challenges:Control_of_Water_and_Gas_Production,Production_Challenges:Production_Optimization,Production_Challenges:Unconventional_Resources,Production_Challenges:Conductivity_Enhancement,Production_Challenges:Horizontal_Completions,Reservoir_Challenges:Improve_Reservoir_Drainage,Extending_Economic_Life:Well_Remediation,Reservoir_Challenges:Improve_Reservoir_Productivity,Real_Time_Decisions,Formation_Challenges:Unconsolidated_Formations,Workflow_Integration:HalComplete:Stimulation_Monitoring,Formation_Challenges:Tight_Oil,Production_Challenges:Improving_Oil_Recovery,Extending_Economic_Life,Production_Challenges:Optimally_Place_Fractures,Formation_Challenges:Shale,Formation_Challenges:Low_Permeability_Formations,|locations:Global,|prodgroups:Intervention:Coiled_Tubing:Real-Time_Coiled_Tubing,Intervention:Coiled_Tubing,Reservoir_&_Fracture_Monitoring:Fiber_Optic_Monitoring-Pinnacle:Retrievable_Fiber_Optic_Services,Intervention,Reservoir_&_Fracture_Monitoring:Fiber_Optic_Monitoring-Pinnacle,"},{"title":"SPECTRUM Diagnostic Service Combines Millout with Cluster Efficiency Analysis in a Single Run","description":"An operator in the Bakken shale play was seeking a solution for milling out plugs in two challenging extended-reach wells and for immediately conducting a post-stimulation review of the cluster efficiency data to identify which perforations were taking fluid.","path":"/content/dam/ps/public/bc/contents/Case_Histories/SPECTRUM-Diagnostics-Bakken-North-Dakota.pdf","docCreatedDate":"2017-03-17T23:30:00.000-05:00","modifiedDate":"2017-03-17T23:30:00.000-05:00","docdate":"2017-03-17T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Intervention:Coiled_Tubing:Coiled_Tubing_Tools,Intervention:Coiled_Tubing:Real-Time_Coiled_Tubing,Intervention:Downhole_Tools-Boots_&_Coots,"},{"title":"Well cleanout achieved allowing acquisition of high quality production logging data","description":"In the Marcellus Shale, Halliburton\u2019s CoilSweep® Wellbore Cleaning Service accomplishes cleanup allowing acquisition of high quality production logging data.","path":"/content/dam/ps/public/bc/contents/Case_Histories/HL-0153-CoilSweepMarcellusCaseStudy.pdf","docCreatedDate":"2015-01-05T22:30:00.000-06:00","modifiedDate":"2015-01-14T22:30:00.000-06:00","docdate":"2015-01-05T22:30:00.000-06:00","docrefNum":"H011519","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Intervention:Downhole_Tools-Boots_&_Coots,Intervention:Coiled_Tubing:Coiled_Tubing_Tools,Intervention:Coiled_Tubing:Tools-Coiled_Tubing,"},{"title":"Water-Based Fluids for Ultra High-Temperature Applications","description":"Engineered Water-Based\nFluids Help Operator Save\n22 Days on Challenging\nGeothermal Well","path":"/content/dam/ps/public/solutions/contents/Geothermal/related_docs/GeothermalWell_CaseHistory.pdf","docCreatedDate":"2010-09-29T23:30:00.000-05:00","modifiedDate":"2010-09-29T23:30:00.000-05:00","publishDate":"2018-10-02T13:17:56.819-05:00","docdate":"2010-09-29T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,"},{"title":"Operator in the Fayetteville Increases Asset Value by $2.6 Million","description":"An operator in the Fayetteville shale play was able to recover bypassed reserves and increase the well\u2019s value by $2.6 million by utilizing ACTIVATE service to design a customized refracture treatment.","path":"/content/dam/ps/public/solutions/contents/Unconventional_Gas/Case_Histories/activate-helps-recover-bypassed-reserves-lowers-cost-per-boe.pdf","docCreatedDate":"2016-01-01T22:30:00.000-06:00","modifiedDate":"2016-06-10T23:30:00.000-05:00","publishDate":"2018-10-02T13:17:47.817-05:00","docdate":"2016-01-01T22:30:00.000-06:00","docrefNum":"H012038","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,"},{"title":"Halliburton helps Bakken operator lower costs per BOE by 64%","description":"Halliburton engaged its ACTIVATE refracturing service to select the best candidate wells located in highly productive areas of the reservoir, and provided a solution to produce additional reserves. ","path":"/content/dam/ps/public/solutions/contents/Unconventional_Gas/Case_Histories/activate-helps-bakken-operator-lower-costs-per-boe.PDF","docCreatedDate":"2015-10-01T23:30:00.000-05:00","modifiedDate":"2015-11-04T22:30:00.000-06:00","docdate":"2015-10-01T23:30:00.000-05:00","docrefNum":"H011924","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,"},{"title":"Multi-discipline path to value creation in Permian Basin","description":"Multi-discipline collaboration using earth model and CYPHER service creates value in Permian Basin","path":"/content/dam/ps/public/solutions/contents/Unconventional_Gas/Case_Histories/cypher-creates-permian-basin-value.pdf","docCreatedDate":"2015-08-01T23:30:00.000-05:00","modifiedDate":"2015-12-01T22:30:00.000-06:00","docdate":"2015-08-01T23:30:00.000-05:00","docrefNum":"H011822","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,"},{"title":"CYPHER Seismic-to-Stimulation Service Permian Basin Case Study ","description":"Along with the subsurface expertise, Halliburton helps operator in the Permian set record with a 65 percent reduction in drilling days plus a 32 percent increase in production. ","path":"/content/dam/ps/public/solutions/contents/Unconventional_Gas/Case_Histories/cypher-permian-basin.pdf","docCreatedDate":"2015-08-26T23:30:00.000-05:00","modifiedDate":"2015-08-26T23:30:00.000-05:00","publishDate":"2018-10-02T13:17:46.105-05:00","docdate":"2015-08-26T23:30:00.000-05:00","docrefNum":"H011786","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States:Texas,"},{"title":"CYPHER Seismic-to-Stimulation Service helps operator almost double production.","description":"A Barnett Shale asset at risk of abandonment gets profitable new lease\non life via Halliburton\u2019s CYPHER Seismic-to-Stimulation Service. The CYPHER Seismic-to-Stimulation Service helps an operator improve production results and consistency by identifying where and how to drill and where and how to frac.","path":"/content/dam/ps/public/solutions/contents/Unconventional_Gas/Case_Histories/CYPHER-barnett-shale.pdf","docCreatedDate":"2014-07-01T23:30:00.000-05:00","modifiedDate":"2014-07-01T23:30:00.000-05:00","publishDate":"2018-10-02T13:17:46.105-05:00","docdate":"2014-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Formation_Challenges:Shale,|brandgroups:Landmark,Sperry_Drilling_Services,|locations:North_America,|prodgroups:Digital_Asset:Shale_Field_Development_Workflow,"},{"title":"Halliburton helps Montney operator increase production from primary completion well by more than 300%","description":"Halliburton engaged its ACTIVATE refracturing service to select the best candidate wells and determine the economic viability of the refracture treatment.","path":"/content/dam/ps/public/solutions/contents/Unconventional_Gas/Case_Histories/activate-helps-montney-operator-increase-production.pdf","docCreatedDate":"2015-11-30T22:30:00.000-06:00","modifiedDate":"2015-11-30T22:30:00.000-06:00","docdate":"2015-11-30T22:30:00.000-06:00","docrefNum":"H012008","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,"},{"title":"Operator Refractures Wells and Decreases Cost Per BOE by 78%","description":"After refracturing the well with ACTIVATE service, the operator in the Barnett shale play increased EUR by 83%, resulting in $1 million NPV. ","path":"/content/dam/ps/public/solutions/contents/Unconventional_Gas/Case_Histories/activate-saves-significant-costs-compared-to-new-drilling.pdf","docCreatedDate":"2016-01-01T22:30:00.000-06:00","modifiedDate":"2016-06-10T23:30:00.000-05:00","publishDate":"2018-10-02T13:17:48.824-05:00","docdate":"2016-01-01T22:30:00.000-06:00","docrefNum":"H012039","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,"},{"title":"Halliburton helps Eagle Ford operator increase EUR by 62%","description":"An operator utilized Halliburton\u2019s ACTIVATESM refracturing service to begin a pilot program to evaluate the economic viability of refracturing in the Eagle Ford shale play.","path":"/content/dam/ps/public/solutions/contents/Unconventional_Gas/Case_Histories/activate-helps-eagle-ford-operator-increase-eur.pdf","docCreatedDate":"2016-01-01T22:30:00.000-06:00","modifiedDate":"2016-06-10T23:30:00.000-05:00","publishDate":"2018-10-02T13:17:48.824-05:00","docdate":"2016-01-01T22:30:00.000-06:00","docrefNum":"H012047","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,"},{"title":"Customized Lost Circulation Treatments Help Resolve Severe Losses in Highly Fractured Geothermal Wells","description":"Geothermal wells in Northern California are drilled in highly fractured volcanic reservoirs, where massive fluid losses can bring operations to a halt.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H07925.pdf","docCreatedDate":"2010-09-01T23:30:00.000-05:00","modifiedDate":"2018-02-05T22:30:00.000-06:00","docdate":"2010-09-01T23:30:00.000-05:00","docrefNum":"H07925","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure,Environmental_Challenges:Geothermal,Reservoir_Challenges:High_Temperature,Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:North_America:United_States:California,North_America,North_America:United_States,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,Cementing:Cementing_Solutions:Lost_Circulation_Materials-Cementing,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control,"},{"title":"Canada: BAROLIFT® Sweeping Agent Provides Impressive Results - Saves 1 to 2 Days Rig Time","description":"The operator was trying to find a method to create better hole conditions for optimal sliding and to reduce the number of trips for bottom hole assembly (BHA). Baroid recommended BAROLIFT sweeping agent, and after pumping the sweep, T&D was reduced in order to prevent total BHA or bit failure. There was a reported increase in cuttings; a reduction in trips; and torque reduction up to 2,000 ft/lbf. ","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010084.pdf","docCreatedDate":"2013-04-01T03:00:00.000-05:00","modifiedDate":"2013-05-09T23:30:00.000-05:00","docdate":"2013-04-01T03:00:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Drilling_Challenges:Drill_String_Torque_Drag_Reduction,|brandgroups:Baroid,|locations:Global,North_America:Canada,North_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,Fluids_Solids_Control:Drilling_Fluid_Additives:Sweeping_Agents-Baroid,"},{"title":"BaraECD® System Enables Operator to Drill and Complete Difficult Well","description":"The operator drilled the production interval and experienced some losses due to low pressure sand. Baroid lost circulation pills were pumped and the sand was sealed off and losses cured. The challenge was to run and cement the production string without mud losses, as mud losses of over 50% would require the liner top to be squeezed. With an 11.6 ppg equivalent sand pressure and surface mud density of 15.0 ppg the differential pressure across the sand was 3,786 psi","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09671.pdf","docCreatedDate":"2012-08-01T23:30:00.000-05:00","modifiedDate":"2017-09-26T23:30:00.000-05:00","docdate":"2012-08-01T23:30:00.000-05:00","docrefNum":"H09671","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Drilling_Challenges:Stuck_Pipe,Deepwater,Well_Control_Challenges:Lost_Circulation,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BaraECD® High-Performance Fluid System Enables Operator to Successfully Drill MPD Well","description":"On the Ensco 82 rig located in the Gulf of Mexico in 2012, the operator was drilling a managed-pressure-drilling (MPD) well in a depleted sand formation in the South Timbalier field.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09753.pdf","docCreatedDate":"2012-09-03T23:30:00.000-05:00","modifiedDate":"2017-10-02T23:30:00.000-05:00","docdate":"2012-09-03T23:30:00.000-05:00","docrefNum":"H09753","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"US Colorado: Lubricant package and improved best practices save 3 days and in DJ Basin","description":"The operator was preparing to drill their second well in the Denver Julesburg area which marked the launch of their drilling projects in the DJ basin. They were searching for a cost-effective lubricant and were considering products from several companies.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09928.pdf","docCreatedDate":"2012-10-01T03:00:00.000-05:00","modifiedDate":"2012-12-10T22:30:00.000-06:00","docdate":"2012-10-01T03:00:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Lubricity,|brandgroups:Baroid,|locations:North_America:United_States:Colorado,North_America:United_States,North_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lubricants-Baroid,"},{"title":"High-Performance BaraECD® Fluid System Enables Operator to Drill Successfully on Slim-Hole HPHT Well in Bolivia","description":"An operator in San Isidro, Bolivia, needed to performa reentry of an existing well. This well was abandoned previously due to high pump pressure values when drilling with a standard invert emulsion fluid (IEF) system; also, due to casing integrity issues in the original wellbore, a 7-inch casing was set back to surface, making it far more difficult to minimize the equivalent circulating density (ECD) value due to the tight annular clearance over the entire well.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012539.pdf","docCreatedDate":"2017-09-26T23:30:00.000-05:00","modifiedDate":"2017-09-26T23:30:00.000-05:00","docdate":"2017-09-26T23:30:00.000-05:00","docrefNum":"H012539","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Global,South_America:Bolivia_Central_South_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"Saudi Arabia: Delayed-Reaction Filter Cake Breaker Helps to Achieve Target Production","description":"Delayed-Reaction Filter Cake Breaker Helps to Achieve Target Production Rates at Half The Reservoir Length","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H08930.pdf","docCreatedDate":"2012-01-01T02:00:00.000-06:00","modifiedDate":"2012-01-19T22:30:00.000-06:00","docdate":"2012-01-01T02:00:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Filter_Cake_Removal,|brandgroups:Baroid,|locations:Middle_East:Saudi_Arabia_Middle_East,Middle_East,|prodgroups:Fluids_Solids_Control:Breaker_Systems,Fluids_Solids_Control:Completion_Fluids_and_Filtration:Completion_Fluid_Additives,"},{"title":"Applied Fluids Optimization Monitoring Prevents Problems Before They Occur","description":"Halliburton proposed monitoring the well with Halliburton\u2019s Applied Fluids Optimization (AFO) service.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H08476.pdf","docCreatedDate":"2012-12-01T22:30:00.000-06:00","modifiedDate":"2017-09-25T23:30:00.000-05:00","docdate":"2012-12-01T22:30:00.000-06:00","docrefNum":"H08476","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|brandgroups:Baroid,|locations:Asia:Southwestern_Asia:Azerbaijan_Southwestern_Asia,|prodgroups:Fluids_Solids_Control:Fluids_Engineering,Real_Time_Services:Real-Time_&_Automation_Services,Optimization_Services:Fluids_Optimization,"},{"title":"Gulf of Mexico: Clay Free Accolade® Fluid Left in Wellbore for 34 Months, Saved Rig Time","description":"16.0 lb/gal ACCOLADE® Clay-Free Fluid left in Wellbore for 34 Months Saved Rig Time and Mud","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H07926.pdf","docCreatedDate":"2010-09-01T03:00:00.000-05:00","modifiedDate":"2010-09-08T23:30:00.000-05:00","docdate":"2010-09-01T03:00:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Barite_Sag,Deepwater,|brandgroups:Baroid,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,North_America:United_States,North_America,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control,"},{"title":"Norwegian Sea: Customized Perforation Pill Designed to Handle Fractures and High Overbalance","description":"Customized Perforation Pill Designed to Handle Fractures and High Overbalance","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H08666.pdf","docCreatedDate":"2012-02-01T02:00:00.000-06:00","modifiedDate":"2012-02-02T22:30:00.000-06:00","docdate":"2012-02-01T02:00:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Reservoir_Challenges:Lost_Circulation-Reservoir_Challenges,|brandgroups:Baroid,|locations:Europe,Europe:Northern_Europe:Norway_Northern_Europe,Oceans_Gulfs_International_Waters:North_Sea,|prodgroups:Fluids_Solids_Control:Completion_Fluids_and_Filtration,"},{"title":"Gulf of Mexico: Insulating Packer Fluid Offers Cost-Effective Alternative","description":"Insulating Packer Fluid Offers Cost-Effective Alternative in Deepwater Operation","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H08931.pdf","docCreatedDate":"2012-01-01T02:00:00.000-06:00","modifiedDate":"2012-01-24T22:30:00.000-06:00","docdate":"2012-01-01T02:00:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Reservoir_Challenges:Lost_Circulation-Reservoir_Challenges,|brandgroups:Baroid,|locations:North_America,North_America:United_States:Louisiana,North_America:United_States,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Completion_Fluids_and_Filtration:Packer_Fluids,Fluids_Solids_Control:Completion_Fluids_and_Filtration:Completion_Fluid_Additives,"},{"title":"Gulf of Mexico: Sag Resistant Economical Fluid Solution for Narrow Margin, High Angle Wellbore with 57 degree Inclination","description":"This offshore application was the tightest clearance of either a shelf or deepwater well that this operator has ever attempted in the GOM. The well, at 16,500 ft TVD and 57 degrees inclination in a sand and shale formation, presented numerous issues including but not limited to lost returns.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H010259.pdf","docCreatedDate":"2013-05-01T03:00:00.000-05:00","modifiedDate":"2013-06-06T23:30:00.000-05:00","docdate":"2013-05-01T03:00:00.000-05:00","docrefNum":"H010259","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Workflow_Integration:HalComplete:Deepwater_Completions,Drilling_Challenges:Stuck_Pipe,Deepwater,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),Well_Control_Challenges:Lost_Circulation,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,"},{"title":"BRINEDRIL-N® and BARADRIL-N® Systems Successfully Drilled Longest Offshore Well on Location","description":"UAE: BRINEDRIL-N and BARADRIL-N Systems Successfully Drilled Longest Offshore Well on Location","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012528.pdf","docCreatedDate":"2017-04-21T23:30:00.000-05:00","modifiedDate":"2017-04-21T23:30:00.000-05:00","docdate":"2017-04-21T23:30:00.000-05:00","docrefNum":"H012528","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:United_Arab_Emirates_Middle_East,|prodgroups:Fluids_Solids_Control:DRIL-N_Fluids,Fluids_Solids_Control:Reservoir_Fluids_Solutions,"},{"title":"Gulf of Mexico: Insulating Packer Fluid Reduces Annular Pressure Buildup in Deepwater Well","description":"Pressure buildup from uncontrolled heat loss to the outer casing annuli could potentially cause casing or well head equipment failure.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H09049.pdf","docCreatedDate":"2012-02-01T02:00:00.000-06:00","modifiedDate":"2012-02-28T22:30:00.000-06:00","docdate":"2012-02-01T02:00:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Completion_Fluids_and_Filtration:Packer_Fluids,"},{"title":"US California: Engineered Water-Based Fluids Help Operator Save 22 Days on Challenging","description":"Engineered Water-Based Fluids Help Operator Save 22 Days on ChallengingGeothermal Well","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H07912.pdf","docCreatedDate":"2010-09-01T03:00:00.000-05:00","modifiedDate":"2010-09-08T23:30:00.000-05:00","docdate":"2010-09-01T03:00:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Pressure,Fluids_Challenges:Fluid_Loss,Reservoir_Challenges:High_Temperature,Well_Control_Challenges:Lost_Circulation,|brandgroups:Baroid,|locations:North_America:United_States:California,North_America,North_America:United_States,Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,Fluids_Solids_Control:Drilling_Fluid_Additives:Viscosifiers-Suspending_Agents-Baroid,"},{"title":"Gulf of Mexico: Top of Cement Identification in Ultra-Deepwater Well Complements Wireline SBT Results","description":"XBAT™ service provides real-time cement assessments for accurate top of cement evaluations.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/XBAT-GOM-TOC-Identification.pdf","docCreatedDate":"2019-10-31T10:54:00.000-05:00","modifiedDate":"2019-11-07T16:32:28.318Z","docdate":"2019-10-31T10:54:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:LWD:Rock_Mechanics-LWD,"},{"title":"Gulf of Mexico: Top of Cement Identification in Ultra-Deepwater Well Saves Operator USD 700,000","description":"XBAT™ service provides accurate top of cement evaluation during cementing of liner.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/XBAT-GOM-TOC-Evaluation-Cementing-Liner.pdf","docCreatedDate":"2019-10-31T11:00:00.000-05:00","modifiedDate":"2019-11-07T16:32:28.365Z","docdate":"2019-10-31T11:00:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:LWD:Rock_Mechanics-LWD,"},{"title":"Gulf of Mexico: Top of Cement Identification in Deepwater Well Supports Cement Lift Pressure Calculations","description":"XBAT™ service accurately determines top of cement by recording and anaylzing raw waveform data.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/XBAT-GOM-TOC-Data-Anaylsis.pdf","docCreatedDate":"2019-10-31T10:45:00.000-05:00","modifiedDate":"2019-11-07T16:32:28.404Z","docdate":"2019-10-31T10:45:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,|brandgroups:Sperry_Drilling_Services,|locations:Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:LWD:Rock_Mechanics-LWD,"},{"title":"Drilling Long Intermediate Interval with Solids-Free Brine Helps Reduce Fluid Costs and Rig Time","description":"CUSTOMIZED BRINE FORMULATION INHIBITS CLAY, IMPROVES ROP, AND LOWERS OVERALL WELL COSTS","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H013389-WBM-Canada.pdf","docCreatedDate":"2019-11-07T16:34:45.343Z","modifiedDate":"2019-11-07T16:34:45.343Z","docdate":"2019-11-07T16:34:45.343Z","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:North_America,Global,"},{"title":"INNOVERT® Invert Emulsion Fluid System Optimizes Drilling Phases in Main and Lateral Hole Sections of Montney Wells","description":"In 2009, while drilling horizontal wells in the Pouce Coupe field to produce gas from the Montney shale formation, Talisman Energy challenged Halliburton to eliminate the use of two different fluid systems in the main and lateral hole sections and to reduce drilling costs by realizing the benefits of a single system.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012561.pdf","docCreatedDate":"2017-05-05T23:30:00.000-05:00","modifiedDate":"2017-05-05T23:30:00.000-05:00","docdate":"2017-05-05T23:30:00.000-05:00","docrefNum":"H012561","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Increased_ROP,Fluids_Challenges,|brandgroups:Baroid,|locations:Global,North_America:Canada,|prodgroups:Fluids_Solids_Control:Conventional_Invert_Emulsion_Systems,Fluids_Solids_Control:Oil_Based_Systems,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,"},{"title":"SeaWave Service Chemical-Free Water Treatment Enables Safe Discharge in Strictly Regulated Offshore Environment","description":"In offshore wells, Southern Brazil, where environmental regulations are among the strictest and rig costs among the highest in the world, one Major Operator is using the SeaWave service from Multi-Chem, a Halliburton Service, to successfully treat flowback and production water for safe and compliant discharge from a number of platforms.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/SeaWave-Offshore-Southern-Brazil.pdf","docCreatedDate":"2014-12-23T22:30:00.000-06:00","modifiedDate":"2014-12-23T22:30:00.000-06:00","docdate":"2014-12-23T22:30:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|brandgroups:Multichem,|locations:Global,|prodgroups:Chemical_Services:Offshore_Water_Solutions,Stimulation:Water_Solutions,"},{"title":"Williston Basin Operator Increases Drilling Efficiency Via Intelligent Bit Technology ","description":"Cerebro™ in-bit sensor package drives Cruzer™ rdocc and Shyfter™ r2 to deliver outstanding curve performance","path":"/content/dam/ps/public/sdbs/sdbs_contents/Case_Histories/web/williston-basin-operator-increases-drilling-efficieny.pdf","docCreatedDate":"2019-09-02T07:42:00.000-05:00","modifiedDate":"2019-06-03T08:45:24.499-04:00","docdate":"2019-09-02T07:42:00.000-05:00","docrefNum":"H013204","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Drill_Bits,"},{"title":"New CoreVault® system helps operator confirm 2.5X more gas in place than expected","description":"New technology improves targeting, reduces costs, and keeps samplesunder pressure so hydrocarbons can be accurately measured.","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/H010950.pdf","docCreatedDate":"2014-02-25T22:30:00.000-06:00","modifiedDate":"2016-06-28T23:30:00.000-05:00","docdate":"2014-02-25T22:30:00.000-06:00","docrefNum":"H010950","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Workflow_Integration:HalComplete:Shale_Field_Development,Formation_Challenges:Shale,|locations:Global,North_America:United_States,|prodgroups:Formation_Evaluation:Geology:Rotary_Coring-Formation_Evaluation,Wireline_and_Perforating:Open_Hole_Wireline:Formation_Evaluation-Open_Hole_Logging,Formation_Evaluation:Reservoir_Engineering-Formation_Evaluation,Wireline_and_Perforating:Open_Hole_Wireline:Rock_Mechanics,Wireline_and_Perforating:Open_Hole_Wireline,Wireline_and_Perforating:Sidewall_Coring,"},{"title":"Larger cores help provide operators a better understanding of reservoir dynamics","description":"New Halliburton 1.5-inch sidewall coring tool proven to be one of the mostreliable and versatile tools in the industry","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/h09343.pdf","docCreatedDate":"2012-09-25T23:30:00.000-05:00","modifiedDate":"2012-09-25T23:30:00.000-05:00","docdate":"2012-09-25T23:30:00.000-05:00","docrefNum":"H09343","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:All-Oil_Drilling_and_Coring,|locations:Global,|prodgroups:Coring,Coring:Unconventional-Coring:Coring_Systems_Unconventional-Coring,Coring:Conventional-Coring:Coring_Components-Coring,Formation_Evaluation:Coring-Formation_Evaluation,Formation_Evaluation:Geology:Rotary_Coring-Formation_Evaluation,Wireline_and_Perforating,Wireline_and_Perforating:Sidewall_Coring,"},{"title":"Customized LCM Squeeze Pill Cures Losses in Depleted Sandstones and Eliminates Additional Trips","description":"STOPPIT® LCM enables exceptional fracture plugging, saving operator time and money.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/CustomizedLCMSqueezePill.pdf","docCreatedDate":"2017-06-08T23:30:00.000-05:00","modifiedDate":"2017-06-08T23:30:00.000-05:00","docdate":"2017-06-08T23:30:00.000-05:00","docrefNum":"H012571","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Asia:Northern_Asia:Russia_Northern_Asia,|prodgroups:Cementing:Cementing_Chemistry:Agents:Lost_Circulation_Management,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"BaraECD® Fluid System and WellSET® Wellbore Strengthening Treatment Solve Deepwater Subsalt Drilling Challenges","description":"Offset well data indicated that an operator would encounter a high-pressure subsalt sand between the base of salt at 19,200 feet (5,852 meters) and 19,700 feet (6,005 meters) measured depth (MD). A severely depleted sand was known to follow at 19,797 feet (6,034 meters) MD. Controlling equivalent circulating density (ECD) while drilling these sands would be critical to avoiding significant down time.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012579.pdf","docCreatedDate":"2017-06-07T23:30:00.000-05:00","modifiedDate":"2017-09-26T23:30:00.000-05:00","docdate":"2017-06-07T23:30:00.000-05:00","docrefNum":"H012579","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Mud_Weight_Management,Drilling_Challenges:Deepwater_Drilling,Deepwater,|brandgroups:Baroid,|locations:Global,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Fluids_Solids_Control:Drilling_Fluids_Solutions,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Oil_Based_Systems,Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Wellbore_Stress_Management,"},{"title":"Operator Returns Plugged SWD Well to Full Production with Customized Chemical Treatment","description":"An operator was experiencing plugging issues that kept re-occurring in its saltwater disposal (SWD) well in the mature Roseland Plantation field, along the Gulf Coast of Louisiana.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Plugged-Well-Full-Production-Chemical-Treatment-H012967.pdf","docCreatedDate":"2018-06-13T23:30:00.000-05:00","modifiedDate":"2018-06-13T23:30:00.000-05:00","docdate":"2018-06-13T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:North_America:United_States,|prodgroups:Chemical_Services:Water_Quality_Issues,Chemical_Services:Flowline_Issues:Scale_Inhibitors,Chemical_Services:Scale_Deposits,Chemical_Services:Fluid_&_Gas_Separation:Emulsion_Breakers,Stimulation:Acidizing:Scale_Control,Chemical_Services:Water_Quality_Issues:Water_Clarifiers,Chemical_Services:Emulsion_Tendencies,"},{"title":"Squeeze Treatment Recovers Production from an Under-Producing Well","description":"An customer experienced considerable scale formation of CaSO4 and CaCO3 downhole in one of its assets. The challenge to control the high scaling potential produced brine contributed to a loss of 10,000 BOPD across the field and resulted in the shut-in of 10 of the 70 wells.","path":"/content/dam/ps/public/multichem/contents/Case_Histories/web/Middle-East-Squeeze-Treatment-Recovers-Production-H012932.pdf","docCreatedDate":"2018-08-16T23:30:00.000-05:00","modifiedDate":"2018-08-16T23:30:00.000-05:00","docdate":"2018-08-16T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Multichem,|locations:Middle_East,|prodgroups:Chemical_Services:Scale_Deposits,Chemical_Services:Flowline_Issues:Scale_Inhibitors,Stimulation:Acidizing:Scale_Control,"},{"title":"BaraFLC-903 Shale Stabilizer Helps Eliminate NPT","description":"Alternative shale stabilizer delivers strong performance at lower concentration","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/Bara-FLC-Algeria.pdf","docCreatedDate":"2019-12-05T18:57:40.358Z","modifiedDate":"2019-12-05T18:57:40.358Z","docdate":"2019-12-05T18:57:40.358Z","docrefNum":"H013413","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Baroid,|locations:Global,Africa:Northern_Africa:Algeria_Northern_Africa,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,Fluids_Solids_Control:Drilling_Fluid_Additives:Borehole_Shale_Stabilizers-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives:Filtrate_Control_Agents-Baroid,"},{"title":"Middle East: Operator Identifies Fractures and Optimizes Completion Design ","description":"PixStar™ high-resolution ultrasonic imaging service enhances reservoir understanding in oil-based mud","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/PixStar-Optimize-Completion-Design-Middle-East.pdf","docCreatedDate":"2019-11-08T10:19:00.000-06:00","modifiedDate":"2019-11-13T17:36:06.805Z","docdate":"2019-11-08T10:19:00.000-06:00","docrefNum":"H013412","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Sperry_Drilling_Services,|locations:Middle_East,|prodgroups:LWD:Rock_Mechanics-LWD,Drilling,LWD:Borehole_Imaging-LWD,"},{"title":"How a more efficient Halliburton cleanout approach helped operators save days of deepwater rig time","description":"Halliburton\u2019s single-trip CleanWell® system technology saved millions and removed four times more debris than conventional dual-trip cleanouts","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H010204.pdf","docCreatedDate":"2013-05-08T23:30:00.000-05:00","modifiedDate":"2013-05-09T23:30:00.000-05:00","docdate":"2013-05-08T23:30:00.000-05:00","docrefNum":"H010204","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,|locations:Africa:Western_Africa,North_America:United_States,North_America,Oceans_Gulfs_International_Waters:Gulf_of_Mexico,|prodgroups:Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Debris_Extraction_Tools,Cementing:Casing_Equipment:Specialty_Tools,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Casing_Cleanout_Tools,Completion_Equipment_and_Services:Completion_Solutions,Wellbore_Service_Tools:Wellbore_Cleaning_Tools:Riser_Cleanout_Tools,"},{"title":"Temporary Well Abandonment System Stays Intact for Nine Years, Despite Hurricane","description":"Just eight days after Halliburton installed a temporary well abandonment system on an operator\u2019s jack-up rig, the rig was found beached in West Cameron. Without these special tools,the workstring that was secured inside the well would have been left standing in the derrick and likely would have blown away with the rig.","path":"/content/dam/ps/public/cps/contents/Case_Histories/web/H011780-ST-GOM.pdf","docCreatedDate":"2015-05-13T23:30:00.000-05:00","modifiedDate":"2015-05-13T23:30:00.000-05:00","docdate":"2015-05-13T23:30:00.000-05:00","docrefNum":"H011780","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Deepwater,Workflow_Integration:HalComplete:Deepwater_Completions,|locations:Global,|prodgroups:Wellbore_Service_Tools:Retrievable_Tools,"},{"title":"SmartWell® Electro-Hydraulic Disconnect tool facilitates reliable disconnect and reconnect of tubing and umbilicals for Petrobras well","description":"On the Carapeba-47 field in Brazil, Petrobras wanted to field trial a first-of-its-kind technology that would disconnect and reconnect the electric and hydraulic lines of an intelligent completion. Halliburton facilitates running intelligent completions in wells that will require periodic workovers.","path":"/content/dam/ps/public/wd/contents/Case_Histories/H011777-Petrobras.pdf","docCreatedDate":"2015-05-20T23:30:00.000-05:00","modifiedDate":"2015-05-20T23:30:00.000-05:00","docdate":"2015-05-20T23:30:00.000-05:00","docrefNum":"H011777","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Global,|prodgroups:Completion_Equipment_and_Services:Intelligent_Completions:System_Accessories-WellDynamics,"},{"title":"Operator Saves 21 Hours on Two Extended-Reach Horizontals in the Bakken Field","description":"Spectrum® Enables Operator to Mill and Then Complete a Frac Efficiency Profile for Completion Optimization","path":"/content/dam/ps/public/bc/contents/Case_Histories/h013417-spectrum-bakken-field-us.pdf","docCreatedDate":"2019-11-12T11:49:00.000-06:00","modifiedDate":"2019-11-18T18:00:20.341Z","docdate":"2019-11-12T11:49:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States,|prodgroups:Intervention:Coiled_Tubing:Real-Time_Coiled_Tubing,Intervention:Coiled_Tubing,Intervention,"},{"title":"SPECTRUM® Diagnostics Identify Two Leaks in a Single-Trip Survey","description":"Spectrum® Real-Time Coil Tubing Services Minimize Downtime and Production Disruption with Fiber-Optic Technology","path":"/content/dam/ps/public/bc/contents/Case_Histories/h013420-spectrum-united-states.pdf","docCreatedDate":"2019-11-12T11:49:00.000-06:00","modifiedDate":"2019-11-18T18:00:20.894Z","docdate":"2019-11-12T11:49:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:North_America:United_States,|prodgroups:Intervention:Coiled_Tubing:Real-Time_Coiled_Tubing,Intervention:Coiled_Tubing,Intervention,"},{"title":"SPECTRUM® Services Enable Zero Downtime for Wells When Performing Perforation Evaluations","description":"Spectrum and PLT Sensors Deliver Real-Time Video Feeds of Perforations in Each Zone, While Maintaining Well Production, in a Single Run","path":"/content/dam/ps/public/bc/contents/Case_Histories/h013418-spectrum-columbia.pdf","docCreatedDate":"2019-11-12T11:49:00.000-06:00","modifiedDate":"2019-11-18T18:00:20.641Z","docdate":"2019-11-12T11:49:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Intervention:Coiled_Tubing:Real-Time_Coiled_Tubing,Intervention:Coiled_Tubing,Intervention,"},{"title":"SPECTRUM® Real-Time Coiled Tubing Services Enable Operator to Eliminate Need for Costly Dummy Runs","description":"Operator Successfully Logs Well in a Single Intervention, Saving Significant Operational Time and Costs","path":"/content/dam/ps/public/bc/contents/Case_Histories/h013419-spectrum-middle-east.pdf","docCreatedDate":"2019-11-12T11:49:00.000-06:00","modifiedDate":"2019-11-18T18:00:21.080Z","docdate":"2019-11-12T11:49:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Middle_East,|prodgroups:Intervention:Coiled_Tubing:Real-Time_Coiled_Tubing,Intervention:Coiled_Tubing,Intervention,"},{"title":"STOPPIT® LCM in High-Vis Pills Helps Prevent Losses in Vugular Formation, Saves $50K in Rig Time","description":"An operator in the vugular UER formation needed a proactive solution that would prevent or minimize losses while drilling a 16-inch hole.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/STOPPIT-HighVisPills.pdf","docCreatedDate":"2017-06-21T23:30:00.000-05:00","modifiedDate":"2017-06-23T23:30:00.000-05:00","docdate":"2017-06-21T23:30:00.000-05:00","docrefNum":"H012604","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Baroid,|locations:Middle_East:United_Arab_Emirates_Middle_East,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid,Fluids_Solids_Control:Drilling_Fluid_Additives:Lost_Cirulation_Materials-Baroid:Remediation_LCM,"},{"title":"Operator Saves USD 450.000 in Abrasive, High-Temperature Well","description":"An operator was drilling a gas wellthrough the very hard, abrasive, and high-temperature kaolinitesiltstone formation. The well was proving to be one of the mostchallenging high-temperature applications. The operator challenged Sperry Drilling to drill the 6-inch vertical section of the S-shaped well faster, safer, and on target through the formation.","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/Turbopower-Egypt.pdf","docCreatedDate":"2018-05-15T23:30:00.000-05:00","modifiedDate":"2018-05-30T23:30:00.000-05:00","docdate":"2018-05-15T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:High_Temperature,|brandgroups:Sperry_Drilling_Services,|locations:Africa:Northern_Africa:Egypt_Northern_Africa,|prodgroups:Directional_Drilling:Turbines,"},{"title":"BAROLIFT® Sweeps Deliver Exceptional Swarf Lifting Capacity","description":"In Algeria\u2019s Bir Seba field, Groupement Bir Seba (GBRS)planned a workover operation to retrieve an existing 3-1/2-inch completion string from the BRS-15 well. To achieve this, the operator wanted to run in the hole with a milling bottomhole assembly (BHA) and mill over a production packer. This would allow GBRS to retrieve other completion assembly components and then run new 3-1/2-inch tubing.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012589.pdf","docCreatedDate":"2017-06-21T23:30:00.000-05:00","modifiedDate":"2017-06-21T23:30:00.000-05:00","docdate":"2017-06-21T23:30:00.000-05:00","docrefNum":"H012589","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Hole_Cleaning_Cuttings_Removal,|brandgroups:Baroid,|locations:Global,|prodgroups:Fluids_Solids_Control:Drilling_Fluid_Additives,Fluids_Solids_Control:Drilling_Fluid_Additives:Sweeping_Agents-Baroid,"},{"title":"ACX™ tool identifies low-rate gas leak in production casing, saving Caelus Energy Alaska USD 3 million","description":"Operator avoids costly workover operation by using the ACX™ service","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Acoustic-Conformance-Xaminer-Service.pdf","docCreatedDate":"2016-05-20T23:30:00.000-05:00","modifiedDate":"2016-12-12T22:30:00.000-06:00","docdate":"2016-05-20T23:30:00.000-05:00","docrefNum":"H012225","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Production_Challenges:Unconventional_Resources,Deepwater,|locations:Global,North_America:United_States:Alaska,|prodgroups:Wireline_and_Perforating:Production_Logging,Wireline_and_Perforating:Casing_and_Cement:Casing_Inspection,"},{"title":"Operators Maximize Economic Value of Their Assets with CoreVault® System","description":"Regional collaboration enables better planning for Drilling, production, and completion of Unconventionals","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/CoreVault-Bakken.pdf","docCreatedDate":"2016-02-11T22:30:00.000-06:00","modifiedDate":"2016-03-28T23:30:00.000-05:00","docdate":"2016-02-11T22:30:00.000-06:00","docrefNum":"H012091","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,North_America:United_States,|prodgroups:Wireline_and_Perforating:Reservoir_Insight,Formation_Evaluation:Geology:Rotary_Coring-Formation_Evaluation,Wireline_and_Perforating:Sidewall_Coring,"},{"title":"Real-Time Acoustic Evaluation of Cement Integrity Saves Operator USD 100,000","description":"CAST-M™ / RBT-M tool combination enables faster, more-confident cement evaluation","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/CASTRBT.pdf","docCreatedDate":"2016-03-17T23:30:00.000-05:00","modifiedDate":"2016-04-07T23:30:00.000-05:00","docdate":"2016-03-17T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Deepwater_Drilling,Deepwater,|locations:Global,Africa:Northern_Africa:Egypt_Northern_Africa,|prodgroups:Wireline_and_Perforating:Cased_Hole_Logging:Cement_Evaluation_Logging,"},{"title":"Halliburton Technology Helps Identify Dual-String Casing Integrity in a Single Run","description":"Single-Trip Logging Run Avoids Expensive Workover and Minimizes Rig Time","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Dual-String-Casing-Integrity-EPX-MIT-Denmark.pdf","docCreatedDate":"2018-03-08T22:30:00.000-06:00","modifiedDate":"2018-03-06T22:30:00.000-06:00","docdate":"2018-03-08T22:30:00.000-06:00","docrefNum":"H012849","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Environmental_Challenges:Corrosion,|locations:Europe:Northern_Europe:Denmark_Northern_Europe,Global,|prodgroups:Wireline_and_Perforating:Cased_Hole_Logging:Pipe_Evaluation,Wireline_and_Perforating:Cased_Hole_Logging:Cement_Evaluation_Logging,Wireline_and_Perforating:Cased_Hole_Logging:Well_Integrity-Cased_Hole_Logging,"},{"title":"Halliburton Electronic Firing System Saves USD 800,000 Per Well in a Single-Trip Completion","description":"The cost of operating in deepwater Angola demands efficiency and reliability. When an operator needed a solution to reduce firing head initiation pressure to test and complete their wells, they turned to Halliburton for an answer.","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/TCP-Electronic-Firing-Angola.pdf","docCreatedDate":"2016-07-25T23:30:00.000-05:00","modifiedDate":"2016-07-25T23:30:00.000-05:00","docdate":"2016-07-25T23:30:00.000-05:00","docrefNum":"H012232","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,Deepwater,|locations:Global,Africa:Southern_Africa:Angola_Southern_Africa,|prodgroups:Perforating_Solutions:Tubing_Conveyed_Perforating,Wireline_and_Perforating:Cased_Hole_Logging:Perforating_Services-Logging,Perforating_Solutions,"},{"title":"Texas: High-Resolution Images Identify Formation Bedding Features and Fractures in Oil-Based Mud ","description":"PixStar™ high-resolution ultrasonic imaging service enhances reservoir understanding","path":"/content/dam/ps/public/ss/contents/Case_Histories/web/pixstar-accurate-fracture-placement.pdf","docCreatedDate":"2019-11-08T10:25:00.000-06:00","modifiedDate":"2019-11-13T17:36:06.845Z","docdate":"2019-11-08T10:25:00.000-06:00","languageSet":["English"],"accessType":"P","dataSearch":"brandgroups:Sperry_Drilling_Services,|locations:North_America:United_States:Texas,|prodgroups:LWD:Rock_Mechanics-LWD,Drilling,LWD:Borehole_Imaging-LWD,"},{"title":"BaraECD® Non-Aqueous Fluid System Helps Customer Reach Reservoir in The Netherlands","description":"A Dutch operator was faced with the challenge of drilling various slimhole wellbores containing a narrow hydraulic window into the Carboniferous-aged Rotliegend reservoir formation in the North Sea, offshore the Netherlands. The well targets were reached by first drilling through the Zechstein salt formation and the Silverpit and Lower Slochteren formations, which are all depleted formations.","path":"/content/dam/ps/public/bar/contents/Case_Histories/web/H012569.pdf","docCreatedDate":"2017-06-05T23:30:00.000-05:00","modifiedDate":"2017-09-26T23:30:00.000-05:00","docdate":"2017-06-05T23:30:00.000-05:00","docrefNum":"H012569","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Fluids_Challenges:Mud_Weight_Management,Drilling_Challenges:Extended_Reach_Drilling_(ERD),Drilling_Challenges:Increased_ROP,Deepwater,Drilling_Challenges:Improving_Drilling_Efficiency,|brandgroups:Baroid,|locations:Global,Europe:Western_Europe:Netherlands_Western_Europe,|prodgroups:Fluids_Solids_Control:Drilling_Fluids_Solutions,Fluids_Solids_Control:Drilling_Fluids:Non-Aqueous_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids:Oil_Base_Drilling_Fluid_Systems,Fluids_Solids_Control:Drilling_Fluids,"},{"title":"North Dakota - Summit ESP® Successfully Replaces Rod Lift System","description":"Multi-technology solution for low-flow wells generate USD 1.4 million in revenue for operator in just six months.","path":"/content/dam/ps/public/artificial_lift/contents/Case_Histories/case-study-summit-esp-replaces-rod-lift.pdf","docCreatedDate":"2018-06-19T23:30:00.000-05:00","modifiedDate":"2018-06-19T23:30:00.000-05:00","docdate":"2018-06-19T23:30:00.000-05:00","docrefNum":"H012950","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Artificial_Lift:Electric_Submersible_Pumps,Artificial_Lift,"},{"title":"Rigless Well Intervention Helps Increase Oil Production by 30% in Sour, Heavy Oil, and Highly Deviated Wells","description":"Rigless Solution Using e-Spectrum℠ Coiled Tubing For Reservoir Monitoring Reduced Operational Cost By 34%\n","path":"/content/dam/ps/public/lp/contents/Case_Histories/web/Rigless-Well-Intervention-Helps-Increase-Oil-Production-in-Sour-Heavy-Oil-and-Highly-Deviated-Wells.pdf","docCreatedDate":"2018-07-15T23:30:00.000-05:00","modifiedDate":"2018-07-02T23:30:00.000-05:00","docdate":"2018-07-15T23:30:00.000-05:00","docrefNum":"H012916","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|locations:Africa:Northern_Africa:Egypt_Northern_Africa,Global,|prodgroups:Wireline_and_Perforating:Cased_Hole_Logging:Well_Integrity-Cased_Hole_Logging,Wireline_and_Perforating:Cased_Hole_Logging:Reservoir_Monitoring_CH_Logging,"},{"title":"China: Managed Pressure Drilling Saves 18 Days of Drilling Time and Delivers Record Horizontal","description":"Tarim Oilfield Company\n(TOC) typically encountered lost circulation and frequent gas\nkicks while drilling horizontal wells in the Tazhong field, Tarim\nBasin.","path":"/content/dam/ps/premium/ts/contents/Case_Histories/web/H06835_China_MPD.pdf","docCreatedDate":"2009-06-04T23:30:00.000-05:00","modifiedDate":"2009-06-03T23:30:00.000-05:00","publishDate":"2018-10-02T10:57:12.158-05:00","docdate":"2009-06-04T23:30:00.000-05:00","docrefNum":"H06835","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Well_Control_Challenges:Lost_Circulation,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Eastern_Asia:China_Eastern_Asia,Global,|prodgroups:Drilling,Drilling:Optimized_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,"},{"title":"Mexico: GeoBalance® Optimized Pressure Drilling Service Reduces Operational Costs by Controlling Bottom Hole Pressure and Borehole Instability","description":"An operator required a managed pressure drilling (MPD) operation to be performed in one of the highest producing oil fields in the central portion of the State of Tabasco, South Mexico. The deviated well is in a high-temperature environment (253° C / 487° F) with a naturally fractured formation. MPD was needed in a section of the well notorious for kick and lost circulation due to pressure regressions. The nearest offset well had experienced a kick and subsequently lost over 2500 barrels of mud.","path":"/content/dam/ps/premium/ts/contents/Case_Histories/web/h06454.pdf","docCreatedDate":"2009-01-09T22:30:00.000-06:00","modifiedDate":"2011-10-31T23:30:00.000-05:00","publishDate":"2018-10-02T10:57:11.097-05:00","docdate":"2009-01-09T22:30:00.000-06:00","docrefNum":"H06454","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Reservoir_Challenges:High_Temperature,|brandgroups:Sperry_Drilling_Services,|locations:North_America:Mexico,Global,|prodgroups:Drilling,Drilling:Optimized_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,"},{"title":"Mexico / Asia: GeoBalance™ Managed Pressure Drilling Service Cuts Drilling Time in Half","description":"Two case histories: 1. GeoBalance Managed Pressure Drilling Service Cuts Drilling Time in Half\n2. GeoBalance Underbalanced Drilling Service Minimizes Reservoir Damage and Increases Production","path":"/content/dam/ps/premium/ts/contents/Case_Histories/web/H05800_Mexico_Asia_GeoBalance.pdf","docCreatedDate":"2007-10-01T23:30:00.000-05:00","modifiedDate":"2012-07-19T23:30:00.000-05:00","publishDate":"2018-10-02T10:57:12.158-05:00","docdate":"2007-10-01T23:30:00.000-05:00","docrefNum":"H05800","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Sperry_Drilling_Services,|locations:North_America:Mexico,Global,Asia:Eastern_Asia,|prodgroups:Drilling:Underbalanced_Drilling,Drilling,Drilling:Optimized_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,"},{"title":"India: GeoBalance® Managed Pressure Drilling Service Helps Save Rig Time in Fractured Granite","description":"In particular, the 8 ½-inch hole lateral section proved difficult to support in the fractured formation, with well control and drilling problems increasing costs substantially. The operator sought a solution that would mitigate well control incidents and facilitate drilling of the critical production hole.","path":"/content/dam/ps/premium/ts/contents/Case_Histories/web/H07855_India_MPD.pdf","docCreatedDate":"2010-07-21T23:30:00.000-05:00","modifiedDate":"2010-07-21T23:30:00.000-05:00","publishDate":"2018-10-02T10:57:12.158-05:00","docdate":"2010-07-21T23:30:00.000-05:00","docrefNum":"H07855","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Reservoir_Challenges:Mature_Fields,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southern_Asia:India_Southern_Asia,Global,|prodgroups:Drilling,Drilling:Optimized_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,"},{"title":"Malaysia: GeoBalance® Pressurized Mud Cap Drilling Technology Delivers Safe and Efficient Drilling through Loss Prone Formations","description":"Using GeoBalance PMCD techniques enabled intermediate hole sections to be drilled in a controlled and safe manner resulting in significant cost savings to the operator from reduced non-productive rig time, and a reduction in drilling mud and loss treatment chemicals.","path":"/content/dam/ps/premium/ts/contents/Case_Histories/web/H010332_Malaysia_GBA.pdf","docCreatedDate":"2013-07-08T08:00:00.000Z","modifiedDate":"2013-07-08T23:30:00.000-05:00","docdate":"2013-07-08T08:00:00.000Z","docrefNum":"H010332","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Drilling_Challenges:Improving_Drilling_Efficiency,|brandgroups:Sperry_Drilling_Services,|locations:Asia:Southeastern_Asia:Malaysia_Southeastern_Asia,Global,|prodgroups:Drilling,Drilling:Optimized_Pressure_Drilling,Drilling:Optimized_Pressure_Drilling:Managed_Pressure_Drilling,"},{"title":"SurgiFrac® Service Increases Production; Adds Approximately $112,000 of Value (Case History)","description":"An operator needed to accurately place an acid treatment throughout a 1600 foot horizontal open hole section of a 6,765 foot well in the Niagaran reef.","path":"/content/dam/ps/premium/pe/contents/Case_Histories/web/evc/745.asp","docCreatedDate":"2006-05-12T23:30:00.000-05:00","modifiedDate":"2006-05-12T23:30:00.000-05:00","publishDate":"2018-10-02T02:35:58.975-05:00","docdate":"2006-05-12T23:30:00.000-05:00","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Formation_Challenges:Low_Permeability_Formations,Production_Challenges:Unconventional_Resources,Production_Challenges:Production_Maintenance,|locations:Global,North_America:United_States:Texas,|prodgroups:Stimulation:Fracturing:Pinpoint_Stimulation:Fracture_Intensity,Stimulation:Acidizing,"},{"title":"ZCA Treatment Increases Oil Production by Approximately $51,000 (Case History)","description":"An open hole completion in a mature San Andres water flood well needed to be acidized to clean up scale that had accumulated in the wellbore and reduced production. A pressured-up water zone was present below the producing horizon. As a result, the wellbore needed treatment that covered the entire open hole without excessive rates that could extend a fracture into the bottom water zone.    ","path":"/content/dam/ps/premium/pe/contents/Case_Histories/web/evc/3440.asp","docCreatedDate":"2006-09-07T23:30:00.000-05:00","modifiedDate":"2006-09-07T23:30:00.000-05:00","publishDate":"2018-10-02T02:35:59.488-05:00","docdate":"2006-09-07T23:30:00.000-05:00","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Formation_Challenges:Carbonate_Formations,Production_Challenges:Scale_Removal,Production_Challenges:Crude_Oil,|locations:Global,|prodgroups:Stimulation:Acidizing,"},{"title":"Devonian Stimulation Increases Value by Approximately $2.75 Million (Case History)","description":"An operator needed to provide adequate stimulation for a 12,000 foot well in a Devonian formation with open Strawn perforations above the completion packer.","path":"/content/dam/ps/premium/pe/contents/Case_Histories/web/evc/3328.asp","docCreatedDate":"2006-09-07T23:30:00.000-05:00","modifiedDate":"2006-09-07T23:30:00.000-05:00","publishDate":"2018-10-02T02:35:59.488-05:00","docdate":"2006-09-07T23:30:00.000-05:00","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Formation_Challenges:Shale,Formation_Challenges:Low_Permeability_Formations,|locations:North_America:United_States:Texas,Global,|prodgroups:Stimulation:Fracturing,"},{"title":"Zonal Coverage Acid™ Treatment Allows Plugged Well to Resume Production; Adds Approximately $791,000 in Value (Case History)","description":"An operator needed to design a treatment that would not break into a water zone located just 30 feet below the oil zone in a 9,250 foot well in a Devonian formation. This water problem had led to the well being plugged over 20 years ago.","path":"/content/dam/ps/premium/pe/contents/Case_Histories/web/evc/122.asp","docCreatedDate":"2006-09-07T23:30:00.000-05:00","modifiedDate":"2006-09-07T23:30:00.000-05:00","publishDate":"2018-10-02T02:35:58.975-05:00","docdate":"2006-09-07T23:30:00.000-05:00","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Formation_Challenges:Low_Permeability_Formations,|locations:Global,"},{"title":"Ferchek® SC Iron Control System Outperforms Competition; Adds over $1.5 Million in New Production (Case History)","description":"An operator wanted to stimulate a six foot Wolfcamp Limestone zone with 20% HCl acid in order to increase production on a 5,100 foot well.","path":"/content/dam/ps/premium/pe/contents/Case_Histories/web/evc/763.asp","docCreatedDate":"2006-05-09T23:30:00.000-05:00","modifiedDate":"2006-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T02:35:58.381-05:00","docdate":"2006-05-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Formation_Challenges:Low_Permeability_Formations,|locations:Global,|prodgroups:Stimulation:Acidizing,"},{"title":"Delta FracSM Fluid System Delivers More Than Five-Fold Increase in Productivity","description":"An operator needed to improve production on a 3,000-foot San Andres formation well.","path":"/content/dam/ps/premium/pe/contents/Case_Histories/web/evc/4829.asp","docCreatedDate":"2006-05-09T23:30:00.000-05:00","modifiedDate":"2006-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T02:35:58.381-05:00","docdate":"2006-05-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"HydroChek® Service Eliminates Water Production, Adds Approximately $80 Million in Value (Case History)","description":"An operator had enjoyed significant success using Halliburton HydroChek® service to reduce water production in an offshore well. Now, that operator wanted to use that technology to restore production in a 2,845 foot well on the same platform that had been shut in because of water entering through a channel behind the pipe. ","path":"/content/dam/ps/premium/pe/contents/Case_Histories/web/evc/4743.asp","docCreatedDate":"2006-05-09T23:30:00.000-05:00","modifiedDate":"2006-05-09T23:30:00.000-05:00","docdate":"2006-05-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Production_Challenges:Control_of_Water_and_Gas_Production,|locations:Global,|prodgroups:Stimulation:Water_Management,"},{"title":"MRIL® Tool Finds New Zone, StiMRIL Confirms It","description":"A customer working in a South Texas field drilled his first prospect and wanted as much technical support as possible to determine the potential of the well.","path":"/content/dam/ps/premium/pe/contents/Case_Histories/web/evc/227.asp","docCreatedDate":"2006-05-09T23:30:00.000-05:00","modifiedDate":"2006-05-09T23:30:00.000-05:00","publishDate":"2018-10-02T02:35:58.975-05:00","docdate":"2006-05-09T23:30:00.000-05:00","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,Formation_Challenges:Low_Permeability_Formations,|locations:Global,|prodgroups:Stimulation:Fracturing,Wireline_and_Perforating:Evaluation_Solutions:Auxiliary_Logging_Solutions,"},{"title":"LatchRite® pre-milled window multilateral system reduces installation time and saves operator an estimated US$2.5 million","description":"A customer operating on a rigsite approximately 250 km from the Halliburton base in Nizhnevartovsk, Russia, sought to optimally produce an unconventional well by maximizing reservoir exposure after hydraulic fracturing operations had taken place in both the lateral and mainbore.","path":"/content/dam/ps/premium/cps/contents/Case_Histories/web/LatchRite-Russia-MaxReservoir.pdf","docCreatedDate":"2015-07-15T08:00:00.000Z","modifiedDate":"2015-07-15T23:30:00.000-05:00","docdate":"2015-07-15T08:00:00.000Z","docrefNum":"H011848","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Reservoir_Challenges:Improve_Reservoir_Productivity,Reservoir_Challenges:Improve_Reservoir_Drainage,|locations:Global,|prodgroups:Drilling,Multilateral:Multilateral_Pre-milled_Window_Systems,Multilateral,"},{"title":"USA, Texas: LaserStrat® In-Field Service Helps Deliver Vastly Higher","description":"Obtain detailed reservoir information for optimum hydraulic fracturing along the lateral to improve the percentage of fractured intervals.","path":"/content/dam/ps/premium/ss/contents/Case_Histories/web/H09289_USA_EagleFord_LaserStrat.pdf","docCreatedDate":"2012-07-07T23:30:00.000-05:00","modifiedDate":"2012-08-21T23:30:00.000-05:00","publishDate":"2018-11-25T02:05:34.970-06:00","docdate":"2012-07-07T23:30:00.000-05:00","docrefNum":"H09289","languageSet":["English"],"accessType":"R","dataSearch":"custchallenges:Formation_Challenges:Shale,Production_Challenges:Unconventional_Resources,|brandgroups:Sperry_Drilling_Services,|locations:North_America,North_America:United_States,North_America:United_States:Texas,|prodgroups:Surface_Data_Logging:Elemental_Analysis-Surface_Data_Logging,Drilling,Surface_Data_Logging,"},{"title":"success-stories-field-development","description":"Field development case studies","path":"/content/halliburton/en-US/ps/consulting/success-stories-field-development.html","docCreatedDate":"2014-11-20T00:00:30.000+08:30","modifiedDate":"2014-11-20T00:00:30.000+08:30","docdate":"2014-11-20T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,"},{"title":"Pore Pressure Prediction and Real-Time Monitoring and Analysis","description":"HpHt wells are typically drilled with a very narrow operating envelope between the mud and fracture gradients.","path":"/content/halliburton/en-US/ps/solutions/drill-bits/pore-pressure-prediction-and-real-time-monitoring-and-analysis.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Drilling_Challenges:Precise_Well_Placement,Reducing_Costs,Formation_Challenges:Low_Permeability_Formations,Fluids_Challenges:Fluid_Loss,Fluids_Challenges:Wellbore_Breathing_and_Ballooning,Drilling_Challenges:Increased_ROP,Drilling_Challenges:Optimize_Drilling_Conditions,Fluids_Challenges:Controlling_Equivalent_Circulating_Density_(ECD),|locations:Global,"},{"title":"Reduce Nonproductive Completion Time and Increase Production Using Flow-Through Composite Frac Plugs (FTCFPs)","description":"Flow-through composite frac plugs (FTCFPs) can serve as an effective alternative to traditional isolation methods or to induced stress diversion. FTCFPs allow all zones to produce during the completion so that that no zones are shut-in for long periods. In addition, zones do not have to be killed after clean-up and when the bottomhole flowing pressure is reduced during flowback, previously treated zones contribute to the clean-up of each new treatment. FTCFP use can significantly improve completion efficiency, relative to traditional isolation methods, and improve production rates.","path":"/content/halliburton/en-US/ps/solutions/mature-fields/project-experience/reduce-nonproductive-completion-time-and-increase-production-using-flow-through-composite-frac-plugs-ftcfps.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Optimally_Place_Fractures,Production_Challenges:Horizontal_Completions,Reservoir_Challenges:Mature_Fields,Reservoir_Challenges:Small_Uneconomical_Reservoir_Pockets,Formation_Challenges:Low_Permeability_Formations,Reservoir_Challenges:Thin_Zones,Reservoir_Challenges:Long_Pay_Interval,Reservoir_Challenges:Improve_Reservoir_Drainage,|locations:Global,"},{"title":"Microseismic Utilized in the Wilcox Sand, Burgos Basin, Northern Mexico","description":"Pemex is actively developing the Wilcox tight-gas sands in the Arcabu-Culebra Field in the Burgos Basin, Northern Mexico.","path":"/content/halliburton/en-US/ps/solutions/mature-fields/project-experience/microseismic-utilized-in-the-wilcox-sand-burgos-basin-northern-mexico.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Horizontal_Completions,Reservoir_Challenges:Mature_Fields,Reservoir_Challenges:Small_Uneconomical_Reservoir_Pockets,Formation_Challenges:Low_Permeability_Formations,Reservoir_Challenges:Thin_Zones,Reservoir_Challenges:Long_Pay_Interval,Reservoir_Challenges:Improve_Reservoir_Drainage,Production_Challenges:Optimally_Place_Fractures,|locations:Global,"},{"title":"Precise Fracture Placement Increases Production and Optimizes Reservoir Drainage","description":"Without proper isolation methods, fracturing uncased horizontal wells is impractical. The SurgiFracÆ service provides fast and precise placement of fractures in deviated and horizontal wellbores without requiring mechanical or chemical plugs to isolate fracture treatments. Multiple fractures can be created within a few hours. The technique is a combination of three separate processes: hydrajetting, hydraulic fracturing, and coinjection down the annulus. Frac treatment costs are re-duced because the low fracture tortuosity inherent in the process requires less equipment and lower viscosity fluids.","path":"/content/halliburton/en-US/ps/solutions/mature-fields/project-experience/precise-fracture-placement-increases-production-and-optimizes-reservoir-drainage.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Optimally_Place_Fractures,Production_Challenges:Horizontal_Completions,Reservoir_Challenges:Mature_Fields,Reservoir_Challenges:Small_Uneconomical_Reservoir_Pockets,Formation_Challenges:Low_Permeability_Formations,Reservoir_Challenges:Thin_Zones,Reservoir_Challenges:Long_Pay_Interval,Reservoir_Challenges:Improve_Reservoir_Drainage,|locations:Global,"},{"title":"Multistage Pinpoint Fracturing in Low-Permeability Formations Lost Hills Field, California","description":"The pinpoint fracturing (PPF) method creates perforations by pumping abrasive slurry down coiled tubing through a jetting nozzle while the main treatment is pumped down the annulus casing/coiled-tubing annulus. Sand plugs are used to achieve isolation between fracture treatments. Application of the pinpoint stimulation technique for multistage fracturing in the Lost Hills field, California, vertical well, significantlyimproved production and reduced completion costs. Porosity in the low-permeability Belridge Diatomite reservoirs is high, 45 to 65%, but permeability ranges from 0.1 to 100 md. Previously, emphasis had been placed on reducing fracture treatment costs by pumping fewer stages and lower proppant volumes to stimulate approximately 1000 ft of net pay, but this resulted in a decrease in cumulative production. Tests using an increased number of fracture stages did not improve economics because of the increased fracturing costs and minimalproduction increases. A pilot test compared the pinpoint fracturing technique performed on 14 wells with the standard perf-and-bridge plug method in 26 wells. The same fracturingparameters, fluid volumes and types, and chemicals were used to keep the basic fracture design the same.","path":"/content/halliburton/en-US/ps/solutions/mature-fields/project-experience/multistage-pinpoint-fracturing-in-low-permeability-formations-lost-hills-field-california.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Horizontal_Completions,Reservoir_Challenges:Mature_Fields,Reservoir_Challenges:Small_Uneconomical_Reservoir_Pockets,Formation_Challenges:Low_Permeability_Formations,Reservoir_Challenges:Thin_Zones,Reservoir_Challenges:Long_Pay_Interval,Reservoir_Challenges:Improve_Reservoir_Drainage,Production_Challenges:Optimally_Place_Fractures,|locations:Global,"},{"title":"Water Management Glossary","description":"Water Management Definitions","path":"/content/halliburton/en-US/ps/solutions/clean-energy/oilfield-water-management/about-water-management/water-management-glossary.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Water_Management-Environmental_Challenge,|locations:Global,"},{"title":"Reducing Water Rates to Increase Hydrocarbon Rates\u2014Cooper Basin, Australia","description":"Identify wells, treatment designs, and placement techniques where conformance work would directly increase hydrocarbon rates while reducing the water rate. ","path":"/content/halliburton/en-US/ps/solutions/clean-energy/oilfield-water-management/project-experience/reducing-water-rates.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Water_Management-Environmental_Challenge,|locations:Global,"},{"title":"Massive Growth in Water Production Demands an Integrated Approach to Manage Disposal Needs (North Kuwait)","description":"The fields of North Kuwait are experiencing the growing water production associated with all maturing fields. The anticipated increase in water production is expected to be three fold within four years. ","path":"/content/halliburton/en-US/ps/solutions/clean-energy/oilfield-water-management/project-experience/water-production-demands.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Water_Management-Environmental_Challenge,|locations:Global,"},{"title":"Waterflood Conformance Study for a Carbonate Reservoir (West Kuwait)","description":"The Minagish Oolite is an undersaturated carbonate reservoir in the Minagish field area in West Kuwait containing several billion barrels of oil. The field was discovered in 1959 and is a mature field. ","path":"/content/halliburton/en-US/ps/solutions/clean-energy/oilfield-water-management/project-experience/waterflood-conformance-study.html","docCreatedDate":"2013-05-01T00:00:30.000+08:30","modifiedDate":"2013-05-01T00:00:30.000+08:30","docdate":"2013-05-01T00:00:30.000+08:30","docrefNum":"","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Environmental_Challenges:Water_Management-Environmental_Challenge,|locations:Global,"}]}]
MMYY |
TitleНазвание
![]() |
DateДата
![]() |
Actual Date | Sort - Creation Date | Sort - Publish Date | Sort - Modify Date |