CobraMax® DM fracturing service with Downhole Mixing
Enables High-Intensity Multistage Fracturing with Downhole Proppant Concentration Control
CobraMax® DM service enables placement of a virtually unlimited number of fracturing stages in a horizontal section with the flexibility of on-demand, downhole changes in proppant concentration. CobraMax DM service uses high-rate pumping of non-abrasive fluid down the annulus mixed downhole with a proppant concentrated slurry being pumped down the tubing.
[{"contenttype":"Case Studies","datasource":[{"title":"Multistage Stimulation Process Executes a Record Number of Fracture Stages","description":"The majority of the wells in the Eagle Ford are completed using the plug-and-perf method. This method requires a full-wellbore inside diameter to allow the bottomhole assembly (BHA) to reach the desired target depths.","path":"/content/dam/ps/public/bc/contents/Case_Histories/CobraMax-Multistage-stimulation-process-executes-record-number-fracture-stages.pdf","docCreatedDate":"2017-03-15T23:30:00.000-05:00","modifiedDate":"2017-03-15T23:30:00.000-05:00","docdate":"2017-03-15T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Intervention:Coiled_Tubing,Intervention:Coiled_Tubing:Coiled_Tubing_Tools,Intervention:Coiled_Tubing:Tools-Coiled_Tubing,Intervention:Downhole_Tools-Boots_&_Coots:Pinpoint_Stimulation-Boots-Coots,"},{"title":"CobraMax DM Success in Marcellus","description":"CobraMax DM service enables 30 interval fracturing operation in the Marcellus Shale.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/cobramax-dm-marcellus-H08532.pdf","docCreatedDate":"2011-07-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2011-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"CobraMax DM Service Case History: East Texas","description":"A Low Risk and Efficient Operation Maximizing Stimulated Reservoir Volume in the Austin Chalk","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/H010238-CobraMax-DM-CH.pdf","docCreatedDate":"2013-05-28T23:30:00.000-05:00","modifiedDate":"2013-05-28T23:30:00.000-05:00","docdate":"2013-05-28T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:North_America:United_States:Texas,|prodgroups:Stimulation:Fracturing:Pinpoint_Stimulation,Stimulation:Fracturing:Pinpoint_Stimulation:Reservoir__Diversion,Stimulation:Fracturing:Pinpoint_Stimulation:Stress_Induced_Complexity,"}]},{"contenttype":"Data Sheets","datasource":[{"title":"CobraMax® DM Service ","description":"CobraMax DM (Downhole Mixing) stimulation service enables placement of a virtually unlimited number of fracturing stages in a horizontal section with the flexibility of on-demand, downhole changes in proppant concentration. ","path":"/content/dam/ps/public/bc/contents/Data_Sheets/cobramax-dm.pdf","docCreatedDate":"2020-05-01T13:38:00.000-05:00","modifiedDate":"2020-05-01T18:39:50.675Z","docdate":"2020-05-01T13:38:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:Global,"}]},{"contenttype":"centerColList","datasource":[{"title":"Multistage Stimulation Process Executes a Record Number of Fracture Stages","description":"The majority of the wells in the Eagle Ford are completed using the plug-and-perf method. This method requires a full-wellbore inside diameter to allow the bottomhole assembly (BHA) to reach the desired target depths.","path":"/content/dam/ps/public/bc/contents/Case_Histories/CobraMax-Multistage-stimulation-process-executes-record-number-fracture-stages.pdf","docCreatedDate":"2017-03-15T23:30:00.000-05:00","modifiedDate":"2017-03-15T23:30:00.000-05:00","docdate":"2017-03-15T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges:Unconventional_Resources,|locations:Global,|prodgroups:Intervention:Coiled_Tubing,Intervention:Coiled_Tubing:Coiled_Tubing_Tools,Intervention:Coiled_Tubing:Tools-Coiled_Tubing,Intervention:Downhole_Tools-Boots_&_Coots:Pinpoint_Stimulation-Boots-Coots,"},{"title":"CobraMax DM Success in Marcellus","description":"CobraMax DM service enables 30 interval fracturing operation in the Marcellus Shale.","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/cobramax-dm-marcellus-H08532.pdf","docCreatedDate":"2011-07-01T23:30:00.000-05:00","modifiedDate":"2017-08-01T23:30:00.000-05:00","docdate":"2011-07-01T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"custchallenges:Production_Challenges,|locations:Global,"},{"title":"CobraMax DM Service Case History: East Texas","description":"A Low Risk and Efficient Operation Maximizing Stimulated Reservoir Volume in the Austin Chalk","path":"/content/dam/ps/public/pe/contents/Case_Histories/web/A_through_R/H010238-CobraMax-DM-CH.pdf","docCreatedDate":"2013-05-28T23:30:00.000-05:00","modifiedDate":"2013-05-28T23:30:00.000-05:00","docdate":"2013-05-28T23:30:00.000-05:00","languageSet":["English"],"accessType":"P","dataSearch":"locations:North_America:United_States:Texas,|prodgroups:Stimulation:Fracturing:Pinpoint_Stimulation,Stimulation:Fracturing:Pinpoint_Stimulation:Reservoir__Diversion,Stimulation:Fracturing:Pinpoint_Stimulation:Stress_Induced_Complexity,"}]}]