Search
Specific Challenge

Conformance Service in a horizontal openhole, for a watered out fracture

Challenge

  • Oil well, highly fractured reservoir 
  • Horizontal openhole completion 
  • Strong aquifer support 
  • Watered out fracture, watercut ~50%, well is not flowing anymore

Solution

  • 5 m³ of MOC-One through 1 ¾” CT

Result

  • Watercut reduced by 10% 
  • Well is producing by itself

10%

Reduction in Watercut

icon

Ready to take the next step?

Talk with a Halliburton Well Intervention Expert

Get in Touch