Fluid loss control in a deepwater, high-permeability sandstone reservoir
Challenge
Deepwater, high-permeability sandstone reservoir
Operator identified one of the main challenges to be control of fluid losses after the tubing conveyed perforating (TCP) stage, prior to installing the lower completion and testing the well
Solution
Before the TCP stage, 15 bbls K-Max Plus™ was positioned just above the targeted zone
Result
Shortly after the perforation stage, the fluid losses were monitored
K-Max Plus™ effectively reduced the losses from 400 BPH to 1.5 BPH