Search
Specific Challenge

Perform cased hole and perforated completion in an oil sandstone formation

Challenge

  • Oil sandstone formation 
  • Cased hole and perforated completion 
  • BHT~321°F, H₂S > 300 ppm 
  • 120 BOPD, 2,300 BWPD, 95% watercut (WC)
  • Watered-out zone

Solution

  • Multi-stage BackStop Service and H₂Zero® Service deployed with coiled tubing, using sand plugs
  • Permanently abandon Zone 3

Result

  • Zones 1, 2, and 4 were re-perforated
  • Well produced at ~1,800 BOPD, 1% WC

94%

Reduction in water cut (WC)

3

Zones re-perforated

1,800

Barrels of oil per day (BOPD)

Explore related products and services

BackStop™ Water Conformance Control Service

BackStop™ Water Conformance Control Service

BackStop Service is a shallow-penetration polymer gel slurry system for water and gas shutoff applications.

Explore
H2Zero™ Service

H2Zero™ Service

H2Zero Service is a porosity fill-sealant for water and gas shutoff with deep penetration into the formation for permanent isolation.

Explore
Coiled Tubing Equipment and Services

Coiled Tubing Equipment and Services

Coiled tubing solutions offer the latest safety features and technologies to optimize operational efficiency and service reliability.

Explore
icon

Ready to take the next step?

Talk with a Halliburton well intervention expert

Get in Touch