Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Brochure

2023 HALPAC Annual Report

Halliburton values the contributions of its employees, not only to HALPAC but also to the communities where we live and work.

Brochure

Halliburton Project Management brochure

Halliburton project management delivers performance-based integrated solutions through collaborative engineering, project and risk management

Brochure

GeoESP® submersible borehole and surface pumps - Brochure

GeoESP submersible borehole and surface pumps directly address the hardest problems in moving geofluids to the surface—thermal cycling and scale resistance.

Data Sheet

GeoESP borehole and surface pumps for geothermal applications - Data sheet

Advanced solutions to enhance geothermal equipment’s run life and reduce energy consumption for lifting geothermal fluids at the highest efficiency.

Data Sheet

GeoESP box test container - Data sheet

Simple, plug-and-play surface solution that feeds into our geothermal downhole pump when conducting well inflow performance tests.

Case Study

Locating enhanced-permeability streaks in a carbonate reservoir

Identify seismically unresolved features in a producing carbonate field to deliver better cumulative production forecasting using an ensemble-based workflow .

Case Study

Modeling a complex turbidite reservoir

Creating consistent geological models with a solution that integrates geological and engineering understanding

Case Study

Improved volumes estimate by incorporating drill stem test data

Use static and dynamic data to better understand and estimate volumes for the Johan Sverdup Field

Case Study

Streamlined reservoir modeling reduces planning turn around

Integrated software tool brings speed, reliability and greater collaboration to reservoir modeling.

Case Study

Plug setting aid saves operator four days of rig time

Discover how the BHKA™ plug setting aid was used to place cement plug during a mature gas-well abdandonment operation to save more than USD 350K in rig costs.

Results per page: 102550