Early Readiness Jumpstarts Salt Water Disposal Unit
Download PDFUnconventionals
Install a HPS for an operator's new saltwater injection station to add profits
Midland, Texas
An independent operator out of Midland, TX needed a horizontal pumping system (HPS) for its new saltwater injection station. Until the station was functional, the operator would have to either delay production or pay trucking fees for saltwater disposal. The operator did not want to wait the quoted 12 weeks for HPS delivery from their current supplier.
With a constant focus on customer needs and an agility unmatched by the large, traditional suppliers, Summit ESP® – a Halliburton service quoted a delivery time of six weeks and won the business. The Hercules™ horizontal pumping system is an efficient alternative to positive-displacement, split-case, and other surface pumping systems, offering longer run life and lower maintenance costs.
USD in Profit Over Trucking in the First Six Weeks
USD Deferred Revenue Avoided