Search

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

PowerMag® casing magnets deliver unmatched debris recovery - Case study

PowerMag® casing magnets deliver unmatched debris recovery during deepwater window milling operations. More than 7,500 lb of metal removed

Article

North America Outlook – Full steam ahead with geothermal

Halliburton’s approach to geothermal energy and geothermal development takes a page from over 100 years of oil and gas experience.

Book

2023 Annual & Sustainability Report

The 2023 Annual & Sustainability Report demonstrates the many ways we executed our strategic priorities, sustainability commitments, and our value proposition.

View

Case Study

VersaFlex® and XtremeGrip® ELH systems in sour environment

The VersaFlex® ELH and XtremeGrip® ELH systems were selected for the job in an offshore well in the UAE with a challenging sour environment and complex design.

Case Study

Intercept® RBP successfully isolates well for 780 days

The Intercept retrievable bridge plug provided the necessary well suspension barrier to isolate the lower completion in a deepwater well for 780 days in Brazil

Data Sheet

Assisted lithology interpretation - Data sheet

Helps accelerate workflows and reduce interpreter bias by using supervised machine learning that leverages trained models for consistent data interpretation across your enterprise.

Article

Subsurface Insights - March 2024

A strategic search for subsurface hydrogen and the nature of hydrogen systems

View

Case Study

50th multilateral system using XtremeGrip® MLT anchor installed - Case study

Halliburton installed its 50th MLT XtremeGrip Anchor system, an expandable anchor system providing reliability and versatility to multilateral installations.

Case Study

Feed-thru MLT system integrates completion benefits

Successful deployment of the first IsoRite® ft multilateral intelligent completion system in the Middle East with distinctive service quality and Zero NPT/COPQ

Case Study

High-performance non-aqueous fluid system helps operator save 55 hours of rig time - Case study

BaraXcel™ helps Middle East operator drill high over balance interval without incident

Results per page: 102550