Integrated Well Construction

Providing efficient, economical, and predictable well construction results

The purpose of every oil and gas well, regardless of complexity, is the cost-effective recovery of hydrocarbons. Efficient and economical well construction is a vital piece of this endeavor. Managing well construction projects requires a thorough understanding of all facets of the well process (from geology to production), along with the ability to integrate industry best practices and cutting-edge oilfield technologies. This same process and commitment are applied to every Halliburton Project Management well construction project, whether drilling for oil and gas, geothermal energy, solution mining reserves, or other resources that require wells for access.

Halliburton Project Management teams start with an extensive pre-planning process to fully understand the objectives and risks of each project. The key to this approach is to collaborate with all stakeholders in order to thoroughly comprehend each situation, and then develop a solid design and an effective program tailored for your well construction project. 

Integrated Well Construction

Integral to this process is the effective integration of world-class Halliburton technologies and services, such as cementing, customized fluids, directional drilling, drill bits, and production enhancement stimulation services, among others. Engineering expertise in well design and operations programming, facilitated by the industry-leading Landmark DecisionSpace® software packages, is applied as required to meet project needs.

Our global footprint and experience give us an advantage in contracting and integrating rigs and other critical third-party services and materials into our processes and delivery. Through the integration of Halliburton expertise in all phases of well design and construction, these teams use experience gained via a worldwide portfolio of operations to deliver predictable well construction results.

Filter By  
Количество записей на странице Show     results per page
  TitleНазвание  DateДата
Summary Summary One of the largest drilling contracts in the world outsourced to Halliburton
Halliburton Integrated Project Management enabled operator to accelerate field development by delivering 58 wells on turnkey basis
Summary Summary Halliburton to Provide Solutions for Accessing TNK-BP’s Tight Oil Reserves in Russia’s Krasnoleninskoe Field
TNK-BP has selected Halliburton to provide an integrated services solution to increase production from the complex and challenging tight oil reserves...
Summary Summary Halliburton Team Optimizes Drilling Performance in Ecuador’s MDC and Inchi Fields
Halliburton Project Management (HPM) in Ecuador collaborated with an operator to drill a vertical exploratory well in Ecuador’s Intracampos fields – specifically in the area’s Inchi and Mauro Davalos Cordero (MDC) fields.
Summary Summary Streamlined Well Construction Eliminates 71 Days of Rig Time, Saving Consortium USD 90 Million
Halliburton sets new deepwater benchmark in brazil's deepwater libra field
Summary Summary Successful Drilling of an Exploratory Well 30 Days Ahead of Schedule
Drilled the deepest exploratory well in the basin.
Summary Summary Project Management Team Creates Successful Infrastructure in Remote Location in India
Halliburton successfully builds access roads and base camp in Thar desert
Summary Summary Project Management Service Utilizes Technologies to Deliver Wells Ahead of Schedule
An operator utilized Halliburton Project Management (HPM) to increase overall productivity while decreasing the overall risks involved in the development of wells in the Zubair field in Basra, Iraq.
Summary Summary Real-Time Journey Management and Intervention Solution Improves Transportation Safety Performance
The Halliburton Project Management (HPM) team installed vehicle telematics systems onboard 12 of its light vehicle fleet to maximize the safety of personnel and to improve daily operational costs.
Summary Summary Well Construction Performance Shaves More Than Eight Days Off of Plan in Rumaila Field
Halliburton Consulting and Project Management (CPM) created a synergy between all groups involved in the well construction, including Halliburton product service lines (PSLs) and third parties, in order to deliver the well objectives by applying practical solutions.
Summary Summary Integrated Well Construction
The purpose of every oil and gas well, regardless of complexity, is the cost-effective recovery of hydrocarbons.
Related Information

Related Information Дополнительная информация