Onshore Hydraulic Workover Unconventionals

Halliburton understands that being profitable in unconventional plays is all about efficiency. Our quick rig units ensure fast rig up and movement times. Our latest development in safety and efficiency SafegripTM allows 24hr snubbing with confidence.

Advanced fluid formulations coupled with live well-jointed pipe interventions mean that wellbore clean up and plug milling can be done in the most demanding horizontal wells with the added befit of running the completion underbalanced allowing rapid start to production.

HWO Capabilities

Our fleet of quick rig units brings the advantage of rapid rig up/down with fast movement times between wells.

Read about our HWO capabilities.

SafeGrip<sup>TM</sup> Pipe Conveyance System

SafeGripTM Pipe Conveyance System

This latest development in the safe and efficient movement of pipe under pressure brings unrivaled confidence in snubbing operations. Gain an insight into this step-change in the safety of snubbing. 

SafeGrip<sup>TM</sup> Pipe Conveyance System
Insite for Well Intervention

Insite for Well Intervention

Halliburton proprietary software enables accurate modeling of pressure, torque, drag, and solids removal. Our skilled HWO engineers use this software to accurately design interventions with a jointed pipe in the most demanding horizontal wellbores. We deliver reliable cleanout performance.

Insite for Well Intervention
Tension Table and Subframe

Tension Table and Subframe

The use of a tension table and subframe on live well interventions brings the advantages of drastically reducing forces on the wellhead and transferred to the ground, and tree flowlines can remain connected during the intervention reducing the time taken to put the well on production. 

Tension Table and Subframe