Multilateral Pre-Milled Window Systems

Used in new well applications, these junction construction systems incorporate a pre-milled window joint and an orienting Latch Coupling. The Latch Coupling provides precise depth control and azimuthal orientation to ensure guaranteed, repeatable re-entry of the lateral. No downhole milling is necessary to create the lateral exit, resulting in easy window opening and no steel debris.

FlexRite® Multibranch Inflow Control (MIC) System (TAML Level 5)
The FlexRite® Multibranch Inflow Control (MIC) system is the newest variant of the award-winning FlexRite isolated tie-back system, allowing a multilateral well to be completed with sand screens, swellable packers, Inflow Control Devices (ICDs) and Interval Control Valves (ICVs) to help maximize production from each multilateral leg.
FlexRite® Isolated Tie-Back Multilateral System (TAML Level 5)
The FlexRite system offers through-tubing intervention and lateral re-entry with separate workover capabilities.
LatchRite® Pre-Milled Window Multilateral System (TAML Level 2 or 4)
The LatchRite® junction construction system provides a high-strength TAML Level 4 junction with sand control and full gauge access to the lateral and lower mainbore.

Multilateral Pre-Milled Window Systems

Filter By  
Количество записей на странице Show     results per page
  TitleНазвание  DateДата
Summary Summary FlexRite® System Installation Sequence Sign in required
The FlexRite system is designed to create a level 5 junction for multilateral wells that require hydraulic pressure integrity at the junction using completion equipment.
Summary Summary LatchRite® Pre-milled Window Multilateral System Sign in required
The LatchRite system is designed to create a level 4 junction for multilateral wells that require full-gauge access to the lateral bore and hydraulic pressure integrity at the junction using cement.
Summary Summary LatchRite® pre-milled window multilateral system reduces installation time and saves operator an estimated US$2.5 million Sign in required
A customer operating on a rigsite approximately 250 km from the Halliburton base in Nizhnevartovsk, Russia, sought to optimally produce an unconventional well by maximizing reservoir exposure after hydraulic fracturing operations had taken place in both the lateral and mainbore.
Summary Summary FlexRite® Multilateral Completion System
The industry's most robust and most versatile TAML Level 5 multilateral completion system
Summary Summary Norway: Two Production Wells in Different Pressured Reservoirs Receive High-Pressure Water Injection from One Multilateral Well
StatoilHydro required a TAML level 5 multilateral junction constructed from a subsea platform with the ability to accommodate high injection pressure and possible large pressure differences between the two lateral branches in two different reservoirs.
Summary Summary Australia: FlexRite® Multilateral System Delivers Increased Reservoir Exposure with Reduced Capital and Operational Expenditures
Apache Energy Ltd. in Western Australia wanted to increase reservoir exposure in an environmentally sensitive field while keeping the development footprint and disturbance to the seabed minimal.
Summary Summary Australia: New Multilateral Window Exit Technology from Halliburton Reduces Installation Time and Helps Operator Save an Estimated $3.3 Million
An operator developing a deepwater field off the Australian NW Shelf required a minimal subsea infrastructure with tight lateral spacing in an environmentally sensitive area.
Summary Summary FlexRite® Multibranch Inflow Control (MIC) System (TAML Level 5)
The FlexRite® Multibranch Inflow Control (MIC) system is the newest variant of the award-winning FlexRite isolated tie-back system, allowing a multilateral well to be completed with sand screens, swellable packers, Inflow Control Devices (ICDs) and Interval Control Valves (ICVs) to help maximize production from each multilateral leg.
Summary Summary Multilateral Pre-Milled Window Systems
Used in new well applications, these junction construction systems incorporate a pre-milled window jointand an orienting Latch Coupling. The Latch Coupling is the primary index providing precise depthcontrol and azimuthal orientation to ensure guaranteed, repeatable re-entry of the lateral. No downholemilling is necessary to create the lateral exit, resulting in easy window opening and no steel debris. Costlymilling and clean-out trips are eliminated.
Summary Summary FlexRite® Isolated Tie-Back Multilateral System (TAML Level 5)
The FlexRite system offers through-tubing intervention and lateral re-entry with separate workover capabilities.
Summary Summary LatchRite® Pre-Milled Window Multilateral System (TAML Level 2 or 4)
The LatchRite® junction construction system provides a high-strength TAML Level 4 junction with sand control and full gauge access to the lateral and lower mainbore.
Related Information

Related Information Дополнительная информация