ESTMZ™ Enhanced Single-Trip Multizone Completion System

 

Designed for use in deepwater and ultra-deepwater offshore completions, the ESTMZ™ system enables several intervals within a well to be isolated and treated with a high-rate frac pack during a single trip of the workstring.

ESTMZ

  • Full 10,000 psi differential pressure rating
  • Highest rated frac and proppant rating in the industry
  • Largest system ID in the industry
  • Modular screen provides formation isolation
  • Capture short, low reserve intervals that would normally be bypassed
  • Accommodates SmartWell® system completions

The Deepwater Completion Solution Example
Halliburton's ESTMZ™ system has the potential to save up to 42 days of rig time on a five zone (1,400 foot producing interval) Lower Tertiary completion.  Based on a $1 MM spread rate that is a $42 MM savings!

ESTMZ™ Enhanced Single-Trip Multizone Completion System

Filter By  
Количество записей на странице Show     results per page
  TitleНазвание  DateДата
Summary Summary Complex Subsea ESTMZ™ System and Intelligent Completion Technology Saves Customer Major Setbacks
The reservoir had gas accumulation over 1,200 feet in eight separate zones; however, only six zones were commercially viable. Initial data suggested that 40% of the gas resources were located in one zone, while another zone had a high risk of early water breakthrough.
Summary Summary Project Review Jack-St Malo - As Seen in Upstream Technology April 2015
ESTMZ system enhances recovery for Chevron in the notoriously difficult Lower Tertiary.
Summary Summary Jack/St. Malo Expanding Chevron's Reach in the deepwater U.S. Gulf of Mexico
Oil and Gas Journal Article featuring the Halliburton ESTMZ system
Summary Summary Halliburton Sets Industry Record for Jack/St. Malo Project
ESTMZ system sets industry record for Jack/St. Malo project in GoM.
Summary Summary ESTMZ (Enhanced Single-Trip Multizone) System
ESTMZ - Frac pack multiple zones in fewer trips with complete formation isolation.
Summary Summary Xtreme Single-Trip Multizone (XSTMZ™) System
Efficiently and reliably stimulate and gravel pack long pay zones in extreme conditions
Summary Summary ESTMZ System Sets Industry Records
ESTMZ system sets industry records in GoM Jack/St. Malo project.
Summary Summary ESTMZ (Enhanced Single-Trip Multizone) System
Enhanced Single-Trip Multizone (ESTMZ™) FracPac™ system is a downhole tool system that allows the stimulation and gravel packing of multiple zones in a single trip of the workstring into the wellbore.
Summary Summary How Chevron saved an average of 18 days per well on three deepwater GoM wells
New Enhanced Single-Trip Multizone (ESTMZ™) completion system sets industry records and improves economics of ultra-deepwater development.
Summary Summary TOTAL Exploration and Production Indonesia breaks the record with the shortest ESTMZ™ system installation time
After months of working with TOTAL E&P Indonesie’s reservoir, business development, and management teams, Halliburton personnel were able to prove the value and benefit – and low risk –the ESTMZ™ system can provide their well.
Summary Summary Keeping sand at bay - Drilling Contractor March 2014
Industry looks to new materials, integrated and intelligent solutions for deeper multizone completions
Summary Summary ESTMZ™ Enhanced Single-Trip Multizone Completion System
ESTMZ™ Enhanced Single-Trip Multizone system enables isolation and treatment of several intervals during a single trip of the workstring.
Summary Summary Multizone Sand Control Systems
Multizone sand control completion systems are proven to save valuable rig time. Halliburton has a long, successful history with single-trip multizone sand control systems.