Red Zone® FracPac™ Systems

Halliburton's Red Zone® FracPac™ systems incorporate the Multi-Position Service Tool (MPT) with Versa-Trieve® VBA packers  to provide for ultra high-rate, large proppant volume, sand control pumping treatments. The MPT is used to carry the gravel pack assembly down hole and to set the packer. Once the screen assembly is positioned across the perforated interval, a ball is dropped down the workstring. Pump pressure is applied to set the Versa-Trieve packer and either pressure, straight pull or a combination will release the MPT. In the run-in position the crossover is located in the sealbore below the closing sleeve. Once the packer is set and the service tool released, the new weight-down position aligns the crossover above the closing sleeve exit ports.

Red Zone® FracPac™ Systems

Filter By  
Количество записей на странице Show     results per page
  TitleНазвание  DateДата
Summary Summary BHP Shenzi GoM Project
After six years, BHP Billiton’s Shenzi field is still the top-performing deepwater development in the Gulf of Mexico.
Summary Summary FracPac™ Systems
Halliburton, an established leader in frac packing solutions, meets customers’ needs with advanced industryleading, fit-for-purpose gravel pack and frac tool designs.
Summary Summary Red Zone® FracPac™ Systems
Halliburton’s Red Zone® FracPac™ systems incorporate the Multi-Position Service Tool (MPT) with Versa-Trieve®VBA packers to provide for ultra high-rate, large proppant volume, sand control pumping treatments.
Related Information

Related Information Дополнительная информация