Opportunity

Deep Water

Opportunity
Specific Challenge

Drilling lateral branches enable additional production from a mature wellbore

Region - Norway Region - Norway

North Sea

Region - Norway

Challenges

  • Drilling new lateral branches to enable additional production from a mature wellbore

Solutions

  • FlexRite® multibranch inflow control (MIC) system 
  • ReFlexRite® completion system 
  • XtremeGrip® MLT system

Results

  • Saved operator over $10 million by eliminating 15 days of rig time
  • Extended production life of the mature wells

Overview

For nearly three decades, multilateral technology has extended the production life of mature North Sea fields, with many offshore wells in Norway drilled as dual-laterals, tri-laterals or quad-laterals. As wells near the end of their life expectancy, after many years of initial production, further advances in Halliburton multilateral technology enable re-drilling of these wells as new multilateral producers.

Challenge

A North Sea operator asked Halliburton to provide a multilateral solution for drilling new lateral legs in existing subsea wells. The solution needed to eliminate the retrieval of the Christmas tree or tieback liner and reduce the number of drilling sections required.

Solution

Halliburton recommended the award-winning 9 5/8-inch FlexRite multibranch inflow control (MIC) system and the ReFlexRite completion system. This combination provides new capabilities that allow the operator to sidetrack out of an existing mainbore casing above an old multilateral well, install an 8 5/8-inch expandable liner and ultimately drill and complete three laterals

An XtremeGrip MLT anchor packer provides the foundation to drill and complete the lower lateral. The lower lateral completion is run with a second XtremeGrip MLT anchor packer. Once set in place, the second anchor packer provides the foundation to drill and complete the upper lateral. 

Using the Halliburton liner deployment system (LDS) enables installation of the lateral completion with standalone screens and swellable packers. The FlexRite MIC system allows for flow control of the branches separately through interval control valves (ICVs). Standalone screens in the laterals are equipped with autonomous inflow control devices (AICDs) for zonal gas production shutoff.

3

laterals completed

$10

million saved

15

operating days saved

Results

The FlexRite MIC system and ReFlexRite system met the operator’s well objectives and exceeded expectations by enabling all downhole operations to be performed through the Christmas tree. Using these systems extended the wells’ natural lifespan and enabled further economic production, maximizing asset value and saving the operator more than $10 million by eliminating 15 operating days.

Data Sheet

FlexRite Multilateral Completion System

The industry’s most robust and most versatile taml level 5 multilateral completion system.

Download Information
FlexRite Multilateral System
FlexRite Multilateral System
icon

INDUSTRY AWARDS

FlexRite System 

  • IOR Prize (Improved Oil Recovery) Norwegian Petroleum Directorate (2006) 

 

ReFlexRite  System 

  • Meritorious Award for Engineering Innovation Exploration and Production E&P Magazine (2007) 
  • Offshore Energy Achievement Award in Well Construction Offshore Engineering Magazine (2007)

 

FlexRite MIC System

  • Meritorious Award for Engineering Innovation Exploration and Production E&P Magazine (2014)

FlexRite Multilateral System
FlexRite Multilateral System

Related Products

Multilateral Systems

Multilateral Systems

Achieve greater profitability and a higher return on investment with innovative multilateral technology

Explore
icon

Ready to Take the Next Step?

Talk with a Halliburton Completion Expert

Contact Us