Driving Reliability Through Innovation


LO-Gard® Service

Industry Challenge:

Control fluid loss to the formation during electric submersible pump (ESP) installation, TCP operations, gravel-pack operations or while performing clean outs, tubing changes, etc. 

 

Horizontal Wells Fracturing

The Challenge:

British Columbia, Canada—A Canadian operator used Halliburton’s CobraMax® H service to place multiple fractures in a horizontal well in the Montney shale formation. The treatment was successful and the well produced 160,000 m3 gas/day (5.6 mmcf/d) which was more than the operator expected.

 

Subsurface Control Valve III (SSC III)

Industry Challenge:

  • Rising rig costs /reduced rig availability

 

Comments? Questions? Need More Information?