 |
The next step of the process, preparation allows required resources and equipment to be selected and obtained for the planned well and the necessary support, maintenance and logistics requirements to be established
Truly optimized drilling minimizes the time impact of any operation on the drilling of the wellbore. With a complete tool kit of applications to model behavior, Halliburton works closely with the customer in the preparation phase to design new or customize existing equipment and create the system solution that best accommodates well construction needs. This leads to the optimal equipment selection for the drilling challenge at hand.
|