Oilfield Water Management Project Experience
Halliburton knows that water has been a great obstacle to the development of oil-bearing lands since the beginning of the modern oil era. In fact, one of Erle P. Halliburton's first patents, "Method and Means for Cementing Oil Wells," describes the problem of water during and after drilling and the effective use of cement to close off a well from water.
Water is a challenge in almost every well drilled. Working to address this challenge for almost a century, Halliburton has the experience and technology necessary to address water issues around the globe. A selection of case studies highlighting some of Halliburton's unique technologies and their application to water challenges can be found below.
Australia
Cooper Basin-Reducing Water Rates to Increase Hydrocarbon Rates
Ecuador
Optimization of Conformance Decisions Using a Well-Intervention Simulator
Western Kuwait
Waterflood Conformance Study for a Corbonate Reservoir
Central North Sea
Successful Water Shutoff Campaigns Using Coiled Tubing Intervention
Mexico
Successful Field Application of a High-Temperature Conformance Polymer
Offshore Mexico
Novel Acid Diversion Technique Increases Production
Southern Mexico
Operator's Water Disposal Cost Decreased by 50%
West Texas
Field Applications of a Water Swellable Polymer for Fracture Shutoff in Injection Wells
Northeast Utah
Relative Permeability Modifiers Used In Conjuction with Hydraulic Fracturing
Case Studies