Tight Gas Project Experience

Around the world, no two tight gas plays are exactly alike. When it comes to solving the many—and complex—challenges posed by tight gas, only Halliburton can supply the optimal solution: from formation evaluation and imaging challenges to those posed by assessment, horizontal drilling, stimulation and produced water handling. And last but not least, by our expertise in HSE (health, safety and environment) issues and regulations.


 


Case Studies
Filter By  
Show     results per page
 TitleDate
Summary Halliburton's ZCA Matrix Acidizing Treatment Pays for Itself in One Week
Summary Hybor Fluid System Helps Eliminate High-Pressure Fracturing Risk; Adds over $2.4 Million in Value (Case History)
Summary Expedite® Service Eliminates Proppant Flowback and Increases Gas Production by Approximately $1.8 Million (Case History)
Summary Delta Frac™ Treatment Increases Gas Production, Adding almost $638,000 in Value (Case History)
Summary Ferchek® SC Iron Control System Outperforms Competition; Adds over $1.5 Million in New Production (Case History)
Summary Fracture Technology Adds Almost $2 Million in Value to Devonian Reservoir (Case History)
Summary Sigma® Process Solution Adds over $639,000 in Value (Case History)
Summary CoalStim(sm) Service Reverses Production Decline in Existing Coalbed Methane Well (Case History)
Summary Delta FracSM Fluid System Delivers More Than Five-Fold Increase in Productivity
Summary ClaySafe Acid System Increases Fluid Recovery and Reduces Swabbing Time (Case History)
Showing 1 - 10 of 112 Records
1  2  3  4  5  6  7  8  9  10  [...]  [Next]