Title
|
Date
 |
|
Europe: Swellpacker Systems Successfully Seal and Anchor North Sea Well Tieback Liner
Due to leakage in the lower part of the
hanger on the 9 5/8-in. intermediate casing, a major North Sea operator had to cut and pull the hanger. Restrictions inside the 13 3/8-in. casing prevented the operator from running a conventional mechanical packer
|
May 2013
|
|
How a more efficient Halliburton cleanout approach helped operators save days of deepwater rig time
Halliburton’s single-trip CleanWell® system technology saved millions and removed four times more debris than conventional dual-trip cleanouts
|
May 2013
|
|
Swellpacker® system configuration helps increase production exponentially
30 stage openhole completion with three Swellpacker Slip-On systems per interval for a total of 90 located in the horizontal section of teh open hole.
|
Apr 2013
|
|
Halliburton helped operator reinforce casing to meet new deepwater Gulf of Mexico standards
Halliburton Completion Tools and Baroid teamed for record run
that saved a major operator $400,000 of rig time
|
Mar 2013
|
|
RapidStage™ system improves frac efficiency
An operator in South Texas wanted to improve well economics snd lower the cost per barrel of oil equivalent (BOE) for a well in a new part of the Eagle Ford Shale.
|
Mar 2013
|
|
Canada: Reverse Cementing Solution in the Montney Formation
A major operator in North America was looking for a viable solution to lower costs for openhole horizontal well construction in the Montney
formation. Because monobore well design can save considerable time while lowering the overall completion cost, the
|
Mar 2013
|
|
PEMEX increased production and improved completion time with "zipper frac" technique
Halliburton helped PEMEX achieve completion 25 days faster with improved design using its RapidSuite™ system technology
|
Mar 2013
|
|
Successful Installation of Openhole Multi-Stage Completion System with Off-Bottom Cement Job
A major customer in North America was looking for an efficient and robust solution for completing its horizontal well.
|
Mar 2013
|
|
Halliburton's flow control solution - is the new standard
A major customer in Malaysia challenged Halliburton to design a single horizontal openhole completion for 18 of their wells.
|
Feb 2013
|
|
Openhole multistage fracturing completion proves successful in a carbonate reservoir
For a proposed 900+ meter near-horizontal section at roughly 5000 meter measured depth, Halliburton
suggested the installation of a RapidShift™ ball drop multistage
stimulation and production sleeve system along with Swellpacker®
zonal isolation systems
|
Feb 2013
|