Title
|
Date
 |
|
US Louisiana: Wellbore Monitoring from Integrated Real Time Center Avoids Well Problems in Gulf of Mexico
The operator’s objective was to run a 13 ⅝-inch casing safely remaining under the Formation Integrity Test (FIT) limit of 13.17 lb/gal and without surging the hole.
|
Sep 2012
|
|
Sperry Drilling Survey Management Audit Reduces Ellipse of Uncertainty by 600% to Meet Anti-Collision Criteria
COMPASS™ well planning database being used by a customer failed anti-collision criteria on ongoing well plans due to unknown Instrument Performance Models (IPM) being applied to historic wellbores.
|
Jun 2012
|
|
DatCI Case Study
Halliburton’s on-site DatCISM process provides custom solutions in industry-best cycle times
|
Feb 2012
|
|
Drilling Performance Integrated Workflow Delivers Gas Storage Cavern Project Six Months Early
The operator required drilling S-shaped directional wells with a 5 meter (16 feet) radius target to gain access to the salt dome under the Jemgumkloster field to create ten new gas storage caverns.
|
Dec 2011
|
|
Drilling Performance Workflow Solution Helps Save 25 Days in HP/HT North Sea Well
Halliburton provided a Drilling Performance workflow solution, integrating the expertise and advanced technical capabilities of Baroid, Drill Bits and Services and Sperry Drilling services to meet the specific challenges of the well.
|
Dec 2011
|
|
Optimized Drilling Performance Overcomes Multiple Challenges to Save Millions
Offshore Mexico
The Cantarell-2119 heavy oil well is located offshore Mexico, water depth 46 m (150 ft), in a block bounded by faults on both the east and west, presenting challenges that include total lost circulation zones and rock with high compressive
|
Sep 2011
|
|
Norwegian Sea: Low-Solids, Oil-Based Mud (LSOBM) Achieves Greater Productivity Indices for High-Temperature Wells
Statoil’s Åsgardfield in the Norwegian Sea is characterized as having high-temperature, high-pressure field with low permeability sandstone.
|
Jan 2011
|
|
Congo: HYDRO-GUARD® System Helps Operator Reduce Rig Time and Mud Costs
Engineered HYDRO-GUARD System Helps Operator Reduce Rig Time and Mud Costs while Drilling Reactive Shale Formation
|
Oct 2010
|
|
Halliburton Delivers 60% ROP Improvement for Taas-Yuryah Neftegazodobycha in East Siberia
LLC Taas-Yuryah Neftegazodobycha (TAAS), operating in the Republic of Sakha-Yakutia, Russia, is striving for economical well construction in the severe East Siberia environment. Hydrocarbon potential of this area is tremendous; however, the underdeveloped
|
Sep 2010
|
|
Fayetteville, Arkansas: SHALEDRIL™ F Water-Based Fluid Proves Successful on Troublesome Fayetteville Shale
The Marrowian shale that
lies above the Fayetteville Shale in Arkansas is highly reactive
and prone to fracturing and delamination. It is typically drilled
with an Invert Emulsion fluid, which reduces the chance of swelling of this formation.
|
Aug 2010
|