Reservoir Fluids Solutions Case Studies

Filter By  
  Title Date
Summary Indonesia: Enhanced BARADRIL-N® System Saves Operator Time and Money in SAS Completion Aug 2012
Summary North Sea: Successful N-FLOW™ 325 filter cake breaker treatment achieves high production rates for Statoil Aug 2012
Summary Venezuela: Design of drilling and completion fluids reduces formation damage in reservoir zone of gas wells Jul 2012
Summary Gulf of Mexico: Innovative Use of N-SOLATE® Packer Fluid in Gulf of Mexico Drilling Operation May 2012
Summary North Sea: BARADRIL-N® Non-Damaging Water-Based Fluid and N-FLOW™ 408 Breaker System Lead to Maximum Constrained Production Rates Apr 2012
Summary Norwegian Sea: CFS™-511 Brine Lubricant Helps Reduce Torque and Drag, Decreases Overall Costs and NPT Mar 2012
Summary North Kuwait: Production Rates and Imaging Log Quality Improved by Potassium Formate/Manganese Mar 2012
Summary Gulf of Mexico: Insulating Packer Fluid Reduces Annular Pressure Buildup in Deepwater Well Feb 2012
Summary Kazakhstan: N-FLOW™ 325 Filter Cake Breaker System Leads to Increased Production Rate Feb 2012
Summary Gulf of Mexico: Insulating Packer Fluid Offers Cost-Effective Alternative Jan 2012
Showing 1 - 10 of 17 Records
1  2  [Next]

Related Information