| | Title  | Date | ID |
|
Casing Drilling Application With Rotary Steerable and Triple Combo in New Deviated Wells in La Cira Infantas Field
La Cira Infantas (LCI) is the oldest Colombian field in production since the beginning of the twentieth century. Hundreds of wells are scattered throughout the field which is divided in two principal
|
Sep 2010
|
SPE 134586
|
|
Design, Planning, Implementation & Management of a Multi-Lateral Well on the BP Forties Field: A North Sea Case History
This paper describes the experience and learning gained whilst, designing, planning and installing a Multi-Lateral Well on the Forties field operated by BP Exploration in the UKCS. This project was in
|
Sep 1997
|
SPE 38494
|
|
Extending the Productive Life of Mature Assets
Magazine supplement describing operator's challenges and Hallbiurton's technologies that can be applied to mature assets.
|
|
H05999
|
|
Marlin Field: An Optimization Study for a Mature Field
Giant fields contribute to a significant portion of the total hydrocarbon production in Brazil. The majority of these fields are in advanced exploitation stages. This paper describes a drainage optimi
|
Dec 2010
|
SPE 139376
|