| |
Title
|
Date
 |
|
Halliburton Matched System Cuts Drilling Time in Half
Rate of penetration increased by nearly 100 percent, eliminating a total of 85 drilling hours in the 6.75-inch hole section, and resulted in an estimated $118,800 savings to the operator.
|
Nov 2012
|
|
California Operator Saves an Estimated $992,000 using a Matched Drilling System
Halliburton had previously drilled wells in the field using a standard steerable motor assembly, but now needed to deliver improved performance using a solution able to orient and steer the well at deeper depths while overcoming strong dipping tendencies a
|
Jul 2012
|
|
Halliburton Matched Drilling System Helps Petrobras Save more than $8 Million on Deepwater Well
In certain deepwater wells in the Campos Basin, Brazil the 16-inch tophole section is typically drilled with a rotary steerable system through the shale, marl and sandstone formation. Historically, two bits are required to drill the section, and the rate o
|
Jun 2012
|
|
GeoForce® XL Motor Powers Through Three Forks Resource Play
The operator enlisted Halliburton to drill almost 10,000 feet (2,956 meters) laterally in one of the prime U.S. unconventional oil plays, the Williston Basin.
|
Jun 2012
|
|
Drilling Performance Integrated Workflow Delivers Gas Storage Cavern Project Six Months Early
The operator required drilling S-shaped directional wells with a 5 meter (16 feet) radius target to gain access to the salt dome under the Jemgumkloster field to create ten new gas storage caverns.
|
Dec 2011
|
|
Drilling Performance Workflow Solution Helps Save 25 Days in HP/HT North Sea Well
Halliburton provided a Drilling Performance workflow solution, integrating the expertise and advanced technical capabilities of Baroid, Drill Bits and Services and Sperry Drilling services to meet the specific challenges of the well.
|
Dec 2011
|
|
Halliburton Sets New Field Record and Saves PEMEX $200,000 using Matched Drilling System
PEMEX challenged Halliburton to match the competitor’s performance by drilling as fast as possible while accurately
delivering the planned objectives.
|
Aug 2011
|
|
Optimized Drilling Performance Delivers 99.68 Percent Operating Efficiency and Helps Operator Save US$ One Million
Over the course of more than 50 extended reach wells drilled in water depths from 45 m to 75 m (148 - 246 ft), the customer’s primary challenge was to drill the 12 ¼-inch sections at optimum rates of penetration (ROP) while ensuring efficient hole cleaning
|
Jul 2011
|
|
Geo-Pilot® XL System and StrataSteer® 3D Geosteering Service Help Save US$ 812,000 in a Thin Sand Reservoir (Malaysia)
Geo-Pilot® XL System
and StrataSteer® 3D
Geosteering Service Help
Save US$ 812,000 in a
Thin Sand Reservoir
|
Feb 2011
|
|
Matched Drilling System Delivers Record Run and Helps North Sea Operator Save over Twenty Days on Reservoir Section
An operator wanted to drill
the entire 8 ½-inch x 9 ½-inch reservoir section of a North Sea
well in one trip, using one bottom-hole-assembly (BHA) from
just below the 10 ¾-inch shoe at 3,638 meters (11,936 feet) to
the target depth of 7,065 meters (23,
|
Nov 2010
|