| |
Title
|
Date
 |
|
Integrated Cement Job Simulator
Halliburton's new OptiCem™ System helps design and simulate the optimum cement job regardless of the complexity of the wellbore or the type of program - standard or foam. Using OptiCem, you can easily identify potential problems and tune your cementing des
|
Nov 2008
|
|
Halliburton SurePlug Process™ Service
The Halliburton SurePlug Process™ service is a major advance in plugging technology. In fact, the process is patented. To date, the Halliburton SurePlug Process has been used to successfully set kickoff plugs on the first attempt in a variety of well condi
|
Nov 2008
|
|
Advanced Cement Evaluation (ACE™)
Halliburton’s new Advanced Cement Evaluation method gives you quick, accurate information on your
cement bond, even when using foamed cements. And it works with standard logging tools (including CAST-V™)
and procedures. Traditional cement evaluation usin
|
Jun 2008
|
|
OptiCem RT™ Cement Job Design and Simulation System
This advanced software program
simulates the job while it is
actually going on, letting you adjust
the displacement rate as needed and
telling you how fast you can safely
pump. Because that information can
be transmitted to another location
and moni
|
Jun 2008
|
|
ZoneSeal® Injection-Pump Skid Cementing Services
The pump system used in the ZoneSeal process has been cementing upgraded. The upgraded ZoneSeal injection pump skid is a compact, portable, automated pumping system used primarily with the
cementing trailer and nitrogen unit for the ZoneSeal process.
|
Jun 2008
|
|
Displace 3D Simulator
Halliburton’s Displace 3D™ advanced computational fluid dynamics (CFD) simulator models multiple aspects of mud
displacement during cementing. Displace 3D simulator was designed to simulate a fully 3D wellbore environment. The 3D
simulator helps operator
|
May 2008
|
|
Displace 3D Simulator (A4)
Halliburton’s Displace 3D™ advanced computational fluid dynamics (CFD) simulator models multiple aspects of mud
displacement during cementing. Displace 3D simulator was designed to simulate a fully 3D wellbore environment. The 3D
simulator helps operator
|
May 2008
|
|
Advanced Cement Evaluation (ACE™) A-4
Halliburton’s new Advanced Cement Evaluation method gives you quick, accurate information on your
cement bond, even when using foamed cements. And it works with standard logging tools (including CAST-V™)
and procedures. Traditional cement evaluation usin
|
May 2006
|
|
ZoneSeal® Injection-Pump Skid Cementing Services - A4
The pump system used in the ZoneSeal process has been cementing upgraded. The upgraded ZoneSeal injection pump skid is a compact, portable, automated pumping system used primarily with the
cementing trailer and nitrogen unit for the ZoneSeal process.
|
Apr 2006
|
|
OptiCem RT™ Cement Job Design and Simulation System A-4
This advanced software program
simulates the job while it is
actually going on, letting you adjust
the displacement rate as needed and
telling you how fast you can safely
pump. Because that information can
be transmitted to another location
and moni
|
Nov 2005
|