| |
Title
|
Date
 |
|
Europe: Swellpacker Systems Successfully Seal and Anchor North Sea Well Tieback Liner
Due to leakage in the lower part of the
hanger on the 9 5/8-in. intermediate casing, a major North Sea operator had to cut and pull the hanger. Restrictions inside the 13 3/8-in. casing prevented the operator from running a conventional mechanical packer
|
May 2013
|
|
Swellpacker® system configuration helps increase production exponentially
30 stage openhole completion with three Swellpacker Slip-On systems per interval for a total of 90 located in the horizontal section of teh open hole.
|
Apr 2013
|
|
Canada: Reverse Cementing Solution in the Montney Formation
A major operator in North America was looking for a viable solution to lower costs for openhole horizontal well construction in the Montney
formation. Because monobore well design can save considerable time while lowering the overall completion cost, the
|
Mar 2013
|
|
Asia: Swellpacker System and Gravel Pack Enable Zonal Isolation in OH SmartWell Completion
A major oil and gas operator in southeast Asia required good zonal isolation of a multilayered, unconsolidated, stacked reservoir possessing several oil, water, and gas zones. The unique trajectory of the horizontal wellbore made access to
mechanical flow
|
Dec 2012
|
|
Norway: Swellpacker® systems provide isolation for multi-zone completion
An operator planning a deep sidetrack from the
mother bore faced the challenge of exiting the 10 3/4-in. liner in the
reservoir beyond the challenges of standard multilateral wells:
|
Nov 2012
|
|
Swellpacker® System Provides Isolation of Liner Top
A major operator in the Gulf of Mexico needed
to set a liner in a parent casing with a very small clearance.
|
Oct 2012
|
|
Modified Swellpacker® isolation system helps customer simplify workover operations
A major customer in Malaysia
wanted to work over and re-complete the long string
from a dual completion in order to replace a damaged
tubing-retrievable safety valve.
|
Oct 2012
|
|
Swellpacker® Slip-On systems help operator achieve goals under time constraints
A major customer in the northern Barnett’s oil
rich play decided to run an openhole completion with 25 separate
zones.
|
Jul 2012
|
|
Swellpacker® System Provides Additional Barrier During Frac Operations
A major operator in North America faced
challenges with cement operations on a production string when
they were unable to achieve the cement height
|
Jul 2012
|
|
Australia:Swellpacker® system used successfully in well construction
A major operator in Australia
wanted to ensure complete zonal isolation between
production zones and a nearby water zone to avoid
potential communication between the zones during
the life of the well.
|
Jul 2012
|