| |
Title
|
Date
 |
|
SPE 163959 Unconventional Shale Play Selective Fracturing Using MultilateralTechnology
This paper will discuss the implementation and execution of this project, the first dual-lateral well by any operator in the Granite Wash at vertical depths over 12,000 ft.
|
Jan 2013
|
|
SPE 159261: Novel Design and Implementation of Kuwait's First Multilateral Well with Inflow Control Device and Inflow Control Valve for Life-Cycle Reservoir Management in High Mobility Reservoir, West Kuwait
The paper covers the customized design of facilitated uniform depletion, which results in improved hydrocarbon recovery.
|
Oct 2012
|
|
IADC/SPE 155532 Embracing the Challenges - Installation of the Deepest Level 4 Multilateral Cemented Junction
This paper describes the objectives, challenges, best practices, contingencies, logistics issues, results, and lessons learned from the implementation of this deep-set multilateral technology.
|
Jul 2012
|
|
Unconventional Shale Play Selective Fracturing Using Multilateral Technology (SPE 151989)
Drilling, completing, and fracturing of unconventional formation wells in North America are now commonplace and will
begin to play a role in the future of natural gas production in the international market. What is not as common is to drill,
complete, an
|
Mar 2012
|
|
Multilateral History - Deepest Level 4 Cemented Junction Installation (IADC/SPE 151378)
An operator was challenged with increasing production efficiencies from new single wellbores in the deep Tarim basin reservoirs of China. To increase and optimize single well production performance, multilateral drilling and completion technology were impl
|
Mar 2012
|
|
Discrete Fracturing of a Deep, Unconventional Shale Play Using Multilateral Technology (SPE 152196)
Drilling, completing, and fracturing unconventional formation wells in North America are now commonplace and will play a major role in the future of natural-gas production on which the nation will depend. What is not as common, however, is to drill, comple
|
Feb 2012
|