| |
Title
|
Date
 |
|
Delta Frac® Service Improves Productivity in Depleted Storage Field (Case History)
An operator had just 13 producing wells in a 100 well gas storage field in a Stray Sand Formation.
|
Sep 2006
|
|
Delta Frac(SM) 200 Fluid with Linear Gel Pad Creates $3.7 Million in New Gas Production (Case History)
An operator needed to limit fracture height growth on a 9,886 foot well in a Prairie du Chien formation to avoid fracturing into water.
|
May 2006
|
|
Delta Frac Fluid System Adds Over $124,000 of Value to New Gas Well (Case History)
An operator was completing a 3,155 foot low-pressure well in a Conglomerate formation and needed a fracturing fluid that could carry sufficient proppant without being difficult to recover.
|
May 2006
|
|
Delta Frac® Service with Breaker Pre-Pad Leads to Gas Production Increase of over $389,000 (Case History)
A competitor had previously treated an 11,000 foot well in a sandstone formation with a high gel loading fluid but had not been able to place the entire job. The operator was very concerned that the large amount of fluid left on the fracture face would lea
|
May 2006
|
|
Delta Frac™ Treatment Increases Gas Production, Adding almost $638,000 in Value (Case History)
An operator needed to fracture an 11,080 foot horizontal well in a tight Atoka formation in Ellis County, Oklahoma. The fluid chosen would have to be capable of producing a long narrow fracture and to stay together long enough to carry the proppant deep in
|
May 2006
|
|
Delta Frac® Service Adds over $1.1 Million in Gas Production (Case History)
An operator requested a fracture treatment for his Canyon Sand formation wells that would lead to better than average production.
|
May 2006
|
|
Delta Frac® Service with GBW-3 Enzyme Breaker Technology Adds almost $7 Million in Added Production (Case History)
An operator had a 17 well drilling package in a Grayburg formation that needed to be effectively stimulated to justify additional wells.
|
May 2006
|
|
Delta Frac® Service Reduces Frac Time and Increases Productivity by almost $652,000 (Case History)
An operator needed faster turn around time on completions and increased job volume on hydraulic fractures for wells in a Cotton Valley formation in East Texas.
|
May 2006
|
|
Delta FracSM Service Adds More Than $816,000 by Improving Open Flow
An operator asked Halliburton to design and re-stimulate five wells in a Medina formation to increase their deliverability.
|
May 2006
|
|
Delta FracSM Fluid System Delivers More Than Five-Fold Increase in Productivity
An operator needed to improve production on a 3,000-foot San Andres formation well.
|
May 2006
|