| | Title  | ID |
|
Field Demonstration of a New Method for Making Drillpipe Connections During Managed Pressure Drilling Operations
A new method of smoothly diverting rig pump flow during connections from the stand pipe to the MPD pressure control equipment at the annulus uses a valve manifold with an on-board choke.
|
SPE 147278
|
|
Managed Pressure Drilling (MPD) Solves Conventional Drilling Problems atthe Xanab Offshore Field, which Presents Severe Drilling Fluid Losses
The Xanab field is located off the coast of Tabasco state in the southeastern Gulf of Mexico.
|
OTC 22713
|
|
Managed-Pressure Drilling Resolves Pressure Depletion-Related Problems in the Development of the High-Pressure High-Temperature Kristin Field
Depletion of the Kristin HPHT field (911 bar, 172º C / 13,213 psi, 342º F) is occurring, challenging the drilling of future increased recovery wells.
|
SPE 113672
|
|
Overcoming Drilling Challenges in Northwest China using an Innovative MPD Technique
PetroChina’s Tarim Oilfield Company (TOC) operates the Tazhong field, which is located in the central part of the Taklimakan Desert in the Tarim basin of Xinjiang, China. The Tazhong Field is a margin
|
SPE 130317
|
|
Successful Use of Real Time Dynamic Flow Modelling to Control a Very Challenging Managed Pressure Drilling Operation in the North Sea
An advanced dynamic flow and temperature model was used to optimize and control MPD operations in real time on the Gullfaks field in the North Sea. The well to be drilled only had a 7 bar window betwe
|
SPE 130311
|