| |
Title
|
Date
 |
|
Integrated Field Lab: Halliburton helped operator achieve breakthrough 100-fold production increases in complex reservoir
Halliburton’s innovative Integrated Field Lab proved to be the key to making the largest field in the Western Hemisphere economic
|
May 2013
|
|
Successful Introduction of the Geo-Pilot® Dirigo Enhanced Dogleg Rotary Steerable System in Angola Deepwater Block
An operator drilling an extended reach exploration well a deepwater Angola field challenged Halliburton to drill the 12-1/4-inch hole section from shoe-to-shoe in one run using a rotary steerable system instead of following standard operational procedure f
|
Mar 2013
|
|
Geo-Pilot® Dirigo System Delivers Record High Dogleg Solution
In this mature field, the operator faced the challenge of drilling through a formation where the overlying soft shale section had made it extremely difficult to achieve good build rates in the past, and inefficient slide drilling with a motor was commonpla
|
Mar 2013
|
|
Geo-Pilot® Dirigo System Helps Shave Five Days from Plan, Drilling Long Horizontal Section in One Run
The operator drilling a shale oil well in Argentina wanted to reduce operating time and associated costs while drilling both the build and horizontal sections in an 8-1/2 inch hole size.
|
Mar 2013
|
|
Geo-Pilot Dirigo Rotary Steerable System Consistently Delivers High Build Rates and Helps HOCOL Save Five Days of Drilling Time
Eliminate sliding time and improve hole quality using a rotary steerable system.
|
Mar 2013
|
|
Turbopower™ Turbodrill Delivers Field Record ROP in Pre-Salt Carbonates and Saves Three Days of Rig Time
In spite of the poor drillability of the challenging formation, the Sperry Turbopower turbine delivered the fastest ROP in the pre-salt of this field, drilling the 8-1/2-inch hole 348 meters to total depth in 79.55 hours, achieving a field record ROP of 4.
|
Dec 2012
|
|
Halliburton delivering 145 wells to Eastern Hemisphere operator on time, on budget and safely
Delivering wells on a turnkey basis at a fixed price
|
Dec 2012
|
|
Halliburton Matched System Cuts Drilling Time in Half
Rate of penetration increased by nearly 100 percent, eliminating a total of 85 drilling hours in the 6.75-inch hole section, and resulted in an estimated $118,800 savings to the operator.
|
Nov 2012
|
|
24-inch Geo-Pilot® XL System Drills Vertical and Build Sections in a Single Run
Angola deepwater exploration well: Vertical and build sections of the 24-inch by 42-inch hole
(405 meters/1,329 feet) were drilled in a single run.
|
Sep 2012
|
|
Record Run with T245 Turbodrill Eliminates Extra Bit Trip and Reduces Drilling Time by Twenty Hours
H09702 Sperry delivered the entire 557 meter (1,827 feet) section in one run at an average ROP of 1.72 meters/hr (5.64 feet/hr) and eliminated the additional planned bit trip.
|
Sep 2012
|