Sign In | Register
|
Regional Sites
Home
>
Products & Services
>
Econolite Additive
>
Case Studies
Products and Services
Contact Us
Overview
Case Studies
Econolite Additive
Filter By
English
Expand All
|
Collapse All
Show
10
25
50
100
results per page
Title
Date
Redesigned Cementing Procedure Saves Operator over $11,000 Per Well
A New Mexico operator was experiencing persistent problems with severe cement fallback following two-stage cementing jobs. Standard cementing practices in the area called for cementing through production casing in two stages. This procedure keeps the circu
May 2003
Liquid Econolite and Flo-Chek 21 Eliminate Two-Stage Job for Savings of $162,500 (Case History)
An operator in Abu Dhabi needed a more economical method of cementing 13 3/8-in and 9 5/8-in casings. Two-stage cement jobs were normally performed on his 13 3/8-in and 9 5/8-in. casing with 15.8 lb/gal slurries pumped on both stages. Time-consuming top-
May 2003
Showing 1 - 2 of 2 Records
1
Related Information
Frequently Requested
Case Studies (2)
Data Sheets (5)
Safety & Compliance (4)
Quick Links
My Account
Locations
Contact Us
Company Information
About Halliburton
Sustainability
Investors
News
Careers
Job Openings
Students
FAQs
Product Index
Subscribe
Print Page
E-mail Page
RSS Feed
LinkedIn
Twitter
Facebook
YouTube
Blog
Copyright © 2013 Halliburton. All Rights Reserved. |
Terms of Use
|
Privacy Policy
|
Site Map