Case Studies

See why leading companies are choosing Halliburton products and services for their upstream energy needs.

Choose Area

Challenges
Product/Service Capability
Brand
Location
  = Sign in required
Filter By  
Show     results per page
  Title Date
Summary EquiFlow AICD helped Repsol recover extra 21,000 barrels of oil Mar 2014
Summary Wireline-set Versa-Trieve VTA packer saves customer Mar 2014
Summary Geo-Pilot® GXT 9600 Rotary Steerable System + Quad-Combo Solution Delivers Section Benchmark Performance in Ultra-Deepwater Exploration Well, Saving Operator Approximately $2,200,000 Mar 2014
Summary Kazakhstan: Innovative Waste Management System from Baroid Surface Solutions Helps Assure Environmental Compliance and Saves Millions Mar 2014
Summary US Alaska: Baroid Delivers Value to Cuttings Transfer Operation Using Kraken Pump/Vacuum System Mar 2014
Summary US Alaska: MAXDRIL-N® Fluid Helped Operator Achieve Superior Hole Cleaning and Wellbore Stability Mar 2014
Summary Egypt: Engineered HYDRO-GUARD® High-Performance Water-Based Fluid and TORQ-TRIM® II Lubricant Saved Operator $1.5M While Drilling 8½" Deviated Hole Mar 2014
Summary New Xaminer™ CoreVault™ system helps operator confirm 2.5X more reserves than expected Feb 2014
Summary RapidShift™ and Swellpacker® System Increase Zonal Testing Efficiency for Pinnacle Operating Company, Inc. Feb 2014
Summary Middle East Geosteering Solution Delivers Record Performance, Cuts Seven Days from Lateral Well, Saving Customer an Estimated $400,000 Feb 2014
Showing 1 - 10 of 788 Records
1   2   3   4   5   6   7   8   9   10   [...]   [Next]
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Site Map
Halliburton. All Rights Reserved.