Plug and Abandonment

End-of-well operations are often more difficult than initial well construction. These plug and abandonment (P&A) operations require maximum efficiency without sacrificing safety—all while limiting impact to the environment.

Halliburton provides the technology and expertise to facilitate safe and efficient operations worldwide for P&A solutions and specialized subsea projects for jacket and subsea tree removal. Our full suite of well abandonment technologies reliably and accurately address a wide range of environments. Integrated and careful planning ensures cost effectiveness, while meeting regulatory and technical requirements.

Filter By  
Show     results per page
  Title Date
Summary Unique integrated solution offers safer way to minimize operating costs Mar 2016
Summary How North Sea operators saved 414 rig days while plugging and abandoning 67 wells Dec 2013
Showing 1 - 2 of 2 Records
1  
Chemical Cutter
Chemical cutters dissolve pipe with a clean cut leaving no debris with no milling prior to pipe retrieval which can shorten operating time and reduce rig costs.
Jet Cutters
Halliburton offers a wide variety of jet cutters that can be used in a range of applications, from 1-inch coil tubing to 9 5/8-inch casing.
Split Shot® Cutter
The Split Shot Cutter uses a linear shaped charge to split tubing and casing collars vertically.
Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.