Intelligent Completions



Halliburton's SmartWell® system intelligent completion technology helps operators to optimize production without costly well intervention. Reliable and fit-for-purpose SmartWell systems enable operators to collect, transmit and analyze downhole data; remotely control selected reservoir zones; and maximize reservoir efficiency by:

  • Increasing production. Commingling of production from different reservoir zones increases and accelerates production and shortens field life.
  • Increasing ultimate recovery. Selective zonal control enables effective management of water injection, gas and water breakthrough and individual zone productivity.
  • Reducing capital expenditure. The ability to produce from multiple reservoirs through a single wellbore reduces the number of wells required for field development, thereby lowering drilling and completion costs. Size and complexity of surface handling facilities are reduced by managing water through remote zonal control.
  • Reducing operating expenditure. Remote configuration of wells optimizes production without costly well intervention. In addition, commingling of production from different reservoir zones shortens field life, thereby reducing operating expenditures.

A SmartWell system completion consists of some combination of zonal isolation devices, interval control devices, downhole control systems, permanent monitoring systems, surface control and monitoring systems, distributed temperature sensing systems, data acquisition and management software and system accessories.

Halliburton is the world’s leading provider of intelligent completion technology to the upstream oil industry. SmartWell system technology, introduced in 1997, was the industry’s first intelligent well completion system.

Intelligent Completions

Filter By  
Show     results per page
  Title Date
Summary Asia: Swellpacker System and Gravel Pack Enable Zonal Isolation in OH SmartWell Completion Nov 2016
Summary Remotely operated Evo-RED® bridge plugs achieve new run record Nov 2016
Summary eRED® Valves Yield Multimillion Dollar Savings Nov 2016
Summary Deepest Openhole SmartWell® System Completed in the Middle East Nov 2016
Summary Integrated Solution More Than Doubles Reservoir Contact Sep 2016
Summary Применение интеллектуальной системы заканчивания SmartWell® на большой глубине в необсаженном стволе скважины при разработке месторождения на Ближнем Востоке Sep 2016
Summary eRED®-LV Remotely Operated Barrier Valve Allows Interventionless Completion Installation Sep 2016
Summary Intelligent Completion Technology Enables Selective Injection and Production in Mature Field Offshore China Sep 2016
Summary Intelligent Completion in System Provides Operator Solutions in the Remote Niger Delta Sep 2016
Summary First intelligent completion in UAE field maximizes production and alleviates infrastructure constraints Sep 2016
Showing 1 - 10 of 29 Records
1   2   3   [Next]
Related Information

Related Information

Showcase

Previous Next
Showcase Image
Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.