Intelligent Completions



Halliburton's SmartWell® system intelligent completion technology helps operators to optimize production without costly well intervention. Reliable and fit-for-purpose SmartWell systems enable operators to collect, transmit and analyze downhole data; remotely control selected reservoir zones; and  maximize reservoir efficiency by:

  • Increasing production. Commingling of production from different reservoir zones increases and accelerates production and shortens field life.
  • Increasing ultimate recovery. Selective zonal control enables effective management of water injection, gas and water breakthrough and individual zone productivity.
  • Reducing capital expenditure. The ability to produce from multiple reservoirs through a single wellbore reduces the number of wells required for field development, thereby lowering drilling and completion costs. Size and complexity of surface handling facilities are reduced by managing water through remote zonal control.
  • Reducing operating expenditure. Remote configuration of wells optimizes production without costly well intervention. In addition, commingling of production from different reservoir zones shortens field life, thereby reducing operating expenditures.

A SmartWell system completion consists of some combination of zonal isolation devices, interval control devices, downhole control systems, permanent monitoring systems, surface control and monitoring systems, distributed temperature sensing systems, data acquisition and management software and system accessories.

Halliburton is the world’s leading provider of intelligent completion technology to the upstream oil industry. SmartWell system technology, introduced in 1997, was the industry’s first intelligent well completion system.

Intelligent Completions

Filter By  
Show     results per page
  Title Date
Summary eRED® Valves Maximize Efficiency During Upper Completion Deployment A4 Aug 2015
Summary eRED® Valves Maximize Efficiency During Upper Completion Deployment Aug 2015
Summary Auto-Gas Lift: SmartWell® System Collaboration Driving Success in Indonesia Aug 2015
Summary Complex Subsea ESTMZ™ System and Intelligent Completion Technology Saves Customer Major Setbacks Jul 2015
Summary Kuwait’s first multilateral intelligent completion results in a cost effective field management solution Jul 2015
Summary Asia: Swellpacker System and Gravel Pack Enable Zonal Isolation in OH SmartWell Completion Jun 2015
Summary SmartWell® Electro-Hydraulic Disconnect tool facilitates reliable disconnect and reconnect of tubing and umbilicals for Petrobras well May 2015
Summary SmartWell® System - Multilateral Applications Mar 2015
Summary Canada: Steam Control Valve Optimizes Production in Heavy Oil Reservoir Mar 2015
Summary eRED® Valve Saves 6 hours Rig-time for BP (A4) Nov 2014
Showing 1 - 10 of 30 Records
1   2   3   [Next]
Related Information

Related Information

Showcase

Previous Next
Showcase Image
Follow Us:
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Site Map
Halliburton. All Rights Reserved.