Pipeline Testing Services

Halliburton provides controlled pressurization and monitoring of testing operations using equipment supplied from our fleet of specialized pumping equipment. Pipeline test pressure is typically held for a period of 8 to 24 hr with calibrated instrumentation recording both pressure and temperature throughout the test period.

Refer also to our SHU™ subsea hydrotest unit for details of our system that provides pipeline precommissioning activities without the need for diver intervention.

Comments? Questions? Need More Information?
Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.