Frac of the Future™

With the advent of horizontally drilled shale plays, new challenges and new opportunities for reward are evident. Increased demands on equipment and greater numbers of service lines sharing the same space requires a change of operations to reach maximum efficiency. Halliburton is evolving the way to provide services needed to maximize return from these plays. Halliburton sees a new approach to fracturing that maximizes productivity, minimizes down time, and optimizes the operator’ s return on their service investment.

  • Reduced footprint
  • Enhanced service quality
  • Reduced NPT
  • Reduced emissions
  • Reduced HSE exposure
  • Reduce labor requirements
  • Improved productivity
  • Real time job optimization
  • Improved inventory management

 

Frac of the Future™
A step change improvement in modern fracturing operations.
Q10™ Pump
Complete new pump design provides higher horsepower and reliability than any other pump in the industry, also with a reduced environmental footprint
SandCastle™ PS-2500 Vertical Storage System
Revolutionary vertical proppant storage system saves space and reduces on-site emissions
Related Information

Related Information

Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Site Map
Halliburton. All Rights Reserved.