Mud-Pulse Telemetry Services

Mud-pulse telemetry systems modulate the flow of drilling fluid, encoding downhole data in pressure pulses that propagate up the drillstring and are detected by pressure transducers at surface.

Our JetPulse™ High-Speed Telemetry Service delivers large amounts of data to help you enhance reservoir understanding and maximize production.

Our Positive Pulse Service has a proven track record in every location and types of assets to deliver downhole data. Available for all hole sizes, and with the addition of SOLAR® Service, operates up 347°F (175°C). Its reliable performance helps reduce your well time.

Our Quasar Pulse™ MWD/LWD Service operates up to temperatures of 392°F (200°C), helping you to deliver a quality wellbore in the reservoir target in the most extreme downhole environments.

JetPulse™ High-Speed Telemetry Service

JetPulse™ High-Speed Telemetry Service

Provides high-data rate transmission of real-time drilling and formation evaluation measurements, enabling faster, earlier decisions to maximize reservoir contact and drilling efficiency.
JetPulse™ High-Speed Telemetry Service
Quasar Pulse™ Extreme-Temperature MWD/LWD Service

Quasar Pulse™ Extreme-Temperature MWD/LWD Service

Extend the reach of current MWD/LWD sensors rated to temperatures of up to 200°C (392°F), providing reliable directional data and steering capabilities in the most extreme downhole environments.
Quasar Pulse™ Extreme-Temperature MWD/LWD Service

Mud Pulse Telemetry Systems

  = Sign in required
Filter By  
Show     results per page
  Title Date
Summary Venezuela: Petroindependencia Drills the Longest ERD Well While Staying 100 Percent in Target Zone Jun 2017
Summary Azerbaijan: Operator Achieves Record-Breaking Telemetry Rates Despite Challenging Environment Jan 2017
Summary South East Asia: Quasar Pulse℠ M/LWD service saves customer approximately USD 1 Million Mar 2015
Summary Haynesville Shale LA, USA: ExtremeHT-200™ M/LWD Sensors Help Operator Save Over US$145,000 Nov 2010
Summary USA, Haynesville Shale: Sperry Successfully Completes Mud Pulse System Surveys from Remote Operations Center Apr 2010
Showing 1 - 5 of 5 Records
1  
Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.