HP/HT Project Experience

For decades, Halliburton has researched and developed tools that enable standard operations in deeper, hotter and higher pressure wells. A selection of case studies highlighting some of Halliburton's HP/HT technologies can be found below.

Halliburton's HP/HT Project History

Halliburton's HP/HT Project History
  = Sign in required
Filter By  
Show     results per page
  Title Date
Summary TOTAL S.A. Drills to Record Depths in HP/HT Well and Mar 2018
Summary Customized High-Performance NAF Delivers Stable HPHT Wellbore, Saving Significant Time and Cost Oct 2017
Summary Conveyance Method Aids in Large Rigless Production Enhancement, Saving 5 Days of Intervention Time Jan 2017
Summary Boots & Coots Drills Relief Well for Shallow Target to Kill Catastrophic Blowout Oct 2016
Summary World's First Extreme-High-Temperature LWD Triple-Combo Run May 2016
Summary Halliburton stimulation treatment increases well’s production by 13,093 barrels of oil per day in an HP/HT reservoir Nov 2015
Summary Oman: SOLAR Quad-Combo Saves 2-3 Days in HPHT wells May 2015
Summary South East Asia: Quasar Pulse℠ M/LWD service saves customer approximately USD 1 Million Mar 2015
Summary Qatar: Engineered PERFORMADRIL® Fluid System with BARACARB® Bridging Agents Helped Save 3 Days of Rig Time and $4M Dec 2014
Summary Malaysia: Designed ENVIROMUL HT Invert Emulsion Fluid Provides Effective Solution for Controlling ECD on Well with Narrow Drilling Window Sep 2014
Showing 1 - 10 of 30 Records
1   2   3   [Next]
Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.