HP/HT Project Experience

For decades, Halliburton has researched and developed tools that enable standard operations in deeper, hotter and higher pressure wells. A selection of case studies highlighting some of Halliburton's HP/HT technologies can be found below.

Halliburton's HP/HT Project History

Halliburton's HP/HT Project History
  = Sign in required
Filter By  
Show     results per page
  Title Date
Summary Customized High-Performance NAF Delivers Stable HPHT Wellbore, Saving Significant Time and Cost Oct 2017
Summary Conveyance Method Aids in Large Rigless Production Enhancement, Saving 5 Days of Intervention Time Jan 2017
Summary Boots & Coots Drills Relief Well for Shallow Target to Kill Catastrophic Blowout Oct 2016
Summary Halliburton stimulation treatment increases well’s production by 13,093 barrels of oil per day in an HP/HT reservoir Nov 2015
Summary Oman: SOLAR Quad-Combo Saves 2-3 Days in HPHT wells May 2015
Summary South East Asia: Quasar Pulse℠ M/LWD service saves customer approximately USD 1 Million Mar 2015
Summary Qatar: Engineered PERFORMADRIL® Fluid System with BARACARB® Bridging Agents Helped Save 3 Days of Rig Time and $4M Dec 2014
Summary Malaysia: Designed ENVIROMUL HT Invert Emulsion Fluid Provides Effective Solution for Controlling ECD on Well with Narrow Drilling Window Sep 2014
Summary One of the largest drilling contracts in the world outsourced to Halliburton Dec 2012
Summary Halliburton helped set bridge plug in high-pressure environment at record depth Sep 2012
Showing 1 - 10 of 29 Records
1   2   3   [Next]
Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.