MillRite® Milled Exit Multilateral System

The MillRite® junction is constructed using a track-guided milling system creating a consistent, geometrically controlled window to create a high-strength TAML level 4 junction. This construction process eliminates "rolloff" and dogleg severity problems associated with conventionally milled windows and allow repeatable lateral re-entry for the life of the well. It utilizes the successful multilateral washover operation and achieves hydraulic integrity using cement. The MillRite system can also be used to construct a TAML level 2 junction.

Benefits

  • Applicable to existing (re-entry) and new wells
  • Precise window geometry
  • Window geometry and position control allows repeatable lateral re-entry for life of well
  • Compatible with IsoRite® isolated multilateral completion system and FloRite® multi-string multilateral completion system
  • Allows existing main well to be produced to lower economic threshold
  • Lower installation and maintenance costs relative to other level 4 systems
  • Single trip window machining

MillRite® Milled Exit Multilateral System (TAML Level 2 or 4)

Filter By  
Show     results per page
  Title Date
Summary Integrated Solution More Than Doubles Reservoir Contact Nov 2017
Showing 1 - 1 of 1 Records
1  
Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.