Multilateral Milled Exit Systems

Halliburton offers junction construction systems where all lateral exits are geometrically milled downhole. Our multilateral milled exit systems can be used in both new and re-entry well applications, and all include innovative designs to ensure maximum payouts from lateral construction.

Multilateral Milled Exit Systems

Filter By  
Show     results per page
  Title Date
Summary Integrated Solution More Than Doubles Reservoir Contact Nov 2017
Showing 1 - 1 of 1 Records
1  
MillRite® Milled Exit Multilateral System (TAML Level 2 or 4)
The MillRite® junction is constructed using a track-guided milling system creating a consistent, geometrically controlled window to create a high-strength TAML Level 4 junction.
ReFlexRite® Milled Exit Isolated Tie-Back Multilateral System (TAML Level 5)
The multilateral system has applications in both new and existing wells. The window exit is constructed with the MillRite system and the junction is completed with the FlexRite system.
Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.