Liner Hangers

Reduce CAPEX by eliminating the need to run long casing string to surface

Running liners is not without risk, wellbores take on many characteristics that are often challenging to liner deployment. Wells with high pressure differentials and extreme temperature ranges can threaten tool integrity. This can lead to non-productive time (NPT) which drives up cost. These extreme environments require liner system solutions that can effectively manage the liner to total depth while mitigating risks and withstanding severe conditions.

Liner systems help reduce CAPEX by eliminating the need to extend a single, long casing string to the top of the wellbore. A liner hanger allows the liner (casing below the liner hanger) to be suspended in the previous casing string to reduce material cost and provide completion solution options. A seal is required at the top of the liner hanger to prevent transfer of fluid or pressures from either direction. This seal can be in the form of an integral expandable liner hanger or by means of a liner packer.

Our portfolio of tools offers both expandable and conventional liner hangers to cover all types of well environments from mature and unconventional assets to shallow and ultra-deep water.

Liner Hanger Tool

Liner Hangers

Filter By  
Show     results per page
  Title Date
Summary Versatile Completion Results in 72% GOR Reduction Without Affecting Oil Production Sep 2017
Summary Swellpacker® Systems Help Save $3 Million by Reducing Rig Time Aug 2017
Summary XtremeGrip™ System Offers Metal-to-Metal Solution Jul 2017
Summary Frac Sleeve DUC Well Completed 410 Days After Installation Shatters Local Record Mar 2017
Summary VersaFlex System Successfully Runs To Depth Without Internal Fluids in a Shallow Extended-Reach Well Feb 2017
Summary Halliburton Installs First VersaFlex Big Bore System in Angola Aug 2016
Summary VersaFlex® Expandable Liner Hanger System Overcomes Pre-Salt and Fluid Loss Challenges Apr 2016
Summary VersaFlex System Overcomes Pre-Salt and Fluid Loss Challenges with ZERO HSE Issues Feb 2015
Summary Cemented VersaFlex® expandable liner hanger provided superior reliability and saved 24 hours of rig time Sep 2014
Summary Halliburton helped operator reinforce casing to meet new deepwater Gulf of Mexico standards Mar 2013
Showing 1 - 10 of 10 Records
1  
Related Information

Related Information

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.