Unconventional Completions

In unconventional plays like shale, margins tend to be razor thin.  In order to assure long-term success, it is important that operators make the best possible decisions in order to maximize the return on their investment.

From RapidSuite™ multistage frac sleeve systems to Fas Drill® composite plugs to openhole isolation systems including ZoneGuard® packers and Swellpacker® systems, Halliburton offers many completion solutions designed to do just that: maximize profit in unconventional plays.

 

Filter By  
Show     results per page
  Title Date
Summary Illusion® Frac Plug Helps Operator Save $200,000 Jan 2017
Summary RapidStart® Initiator CT Sleeve Opens Successfully 32 Months After Installation Jan 2017
Summary First RapidStage® completions system deployed in the Eagle Ford Shale saves customer $1 Million Jan 2017
Summary Illusion® Frac Plugs Save Time and Reduce Overall Completion Cost Dec 2016
Summary RapidStart® Initiator Sleeves Open Successfully After 10 Months in the Well Oct 2016
Summary Record-Setting Lateral Completion Achieved with Obsidian® Plugs Sep 2016
Summary Illusion® Frac Plugs Help Eliminate Post-Fracturing Treatment Intervention Aug 2016
Summary RapidStage® 50+ system with AccessFrac® service shines in the Bakken Jul 2016
Summary RapidStage® Systems Provide Game-Changing Operational Efficiencies to Mature Field Jul 2016
Summary Illusion® Frac Plug Helps Eliminate High-Risk Millout Operations May 2016
Showing 1 - 10 of 38 Records
1   2   3   4   [Next]

Illusion® FULLY Dissolvable Frac Plug

This fully dissolvable plug helps reduce the risk and cost associated with conventional plug removal and upon complete dissolution, provides an entire wellbore ID for future operations.

Follow Us:
Careers
Job Openings
Halliburton. All Rights Reserved. | Terms of Use | Privacy Policy | Garnishment | Site Map
Halliburton. All Rights Reserved.